| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance 2 2 SUKANTA SARANI 4TH LANE PO NONA CHANDANPUKUR BARRACKPORE KOLKATA PIN 700122 | BARRACKPORE | 24 PARAGANAS NORTH | WEST BENGAL | 700122 | -6.20% | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹19.3 L (9.32%)Admitted-Finance | +2.54% | ₹2.3 Cr+₹19.3 L (9.32%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹24.7 L (11.9%)Admitted-Finance | +5.00% | ₹2.3 Cr+₹24.7 L (11.9%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical DISQUALIFIED due to non submission of Latest Audit Report of Directorate of Co operative Audit. |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
27 Feb 2026, 10:00 amClosed
SE attached to CE(N)
Office of the Chief Engineer (North), Green Park, Malda
Protection work along the left bank of river Atrai behind Patiram College for a length of 950m at G.P Patiram P.S. and Block Balurghat, Dist. Dakshin Dinajpur
2026_IWD_997519_8
WBIW/SE/CE(N)/NIT-4(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
120 days
Patiram, Balurghat, Dakshin Dinajpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹4.4 L
Yes
16 Sept 2026
6 Feb 2026
27 Feb 2026
6 Feb 2026
27 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. or making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including reaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 22,662.23 | CUM | 117.99 | ₹26,73,916.64 |
| 2 | Extra rate over item No-I for all kinds of soil for every additional lift of 1.50 m or part thereof beyond the initial lift of 1.50 meter
One additional lift | 11,331.12 | CUM | 13.11 | ₹1,48,550.98 |
| 3 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete." | 13,488 | Each | 139.44 | ₹18,80,766.72 |
| 4 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3"
Size of Nylon crate is 1metre X 1metre X 1metre.
Where boats are not necessary | 4,046 | Each | 460.03 | ₹18,61,281.38 |
| 5 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3"
Size of Nylon crate is 1metre X 1metre X 1metre.
Where boats are necessary | 9,442 | Each | 473.14 | ₹44,67,387.88 |
| 6 | Supplying Nylon cage netting 1 metre x 1 metre x 0.6 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 3,440 | EACH | 102.25 | ₹3,51,740 |
| 7 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (maximum 13 nos) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled HDPE bags should not be less than 0.0328 m3.
Size of Nylon crate is 1metre x 1metre x 0.6 metre. b) Where boats are not necessary. | 3,440 | EACH | 516.77 | ₹17,77,688.8 |
| 8 | Supplying Nylon cage netting 1 metre x 1 metre x 0.40 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 10,161 | EACH | 83.67 | ₹8,50,170.87 |
| 9 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (maximum 15 nos) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled HDPE bags should not be less than 0.0328 m3.
Size of Nylon crate is 1metre x 1metre x 0.4 metre.
b) Where boats are not necessary.
Consider 85 % filling of each bag for compact on the crate for slope pitching as per guideline | 10,161 | EACH | 596.23 | ₹60,58,293.03 |
| 10 | Supplying fitting, fixing Darma mat in flowing or stagnant water or in dry areas with 16 SWG GI wire as per direction of the Engineerr-incharge.
B) Where boats are necessary | 6,089.5 | SQM | 207.37 | ₹12,62,779.62 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.07 MB
DRAWING08.pdf
Tender Documents • 0.16 MB
BOQ_2442732.xls
BOQ • 0.30 MB
BARCHART08.pdf
Tender Documents • 0.08 MB
2911.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .