Tender Value
₹51.8 L
EMD Value
₹1.0 L
Closing Date
3 Mar 2021, 12:00 pmClosed
Registrar Bodoland University
Bodoland University Kokrajhar 783370
Construction of Botanical Garden at Haldhibari Complex of Bodoland University Debargaon Kokrajhar.
2021_BODOU_21120_1
BU/Engg/B.G/19-20/93/142
Open Tender
Civil Works - Building
Works
365 days
Bodoland University Haldibari Campus
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹1.0 L
Yes
19 Jul 2021
11 Feb 2021
4 Mar 2021
11 Feb 2021
3 Mar 2021
11 Feb 2021
11 Feb 2021 - 3 Mar 2021
Amount
BoundaryWall:Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified (A) Up to a depth of 2.00m below the existing G.l. (b) In hard/dense soil
Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after prepar rials and if necessary dewatering, complete.(a) Brick on flat soling,
Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (b) In prop 1cement: 4 sand :8 coarse aggregate by volume.
Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL. (i) TMT Corrosion resistant steel (CRS) reiforcement bar .
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in:Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.
.(b) Using 25mm thick plank. Sides of tie beams, grade beams etc. at or below ground level.Tie:(b) Using 25mm thick plank.
178.20x2x0.30 = 106.92 sqm Columns, Pillars, Posts & Strut(a) Square, Rectangular, polygonal in plan or any shape like Tee/L etc. having plane vertical face
(ii) Using 25mm thick plank. Column:67x4x 2.40x0.30 = 192.96 m2
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately). (I) Using Mixer Machine.
(A) In substructure up to plinth level.Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level.N) Without using admixture, plasticiser.
Footing:
Tie Beam
(B) In super structure from plinth level up to 1st floor levelii) columns, pillars ,posts, struts, suspended floor, roof landing --of nosi N) Without using admixture, plasticiser. a) M15 grade concrete or Prop. 1:2:4.
1st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth up to 1st floor level (protruding M.S rod/Tor steel of column to be embeded in cement mortar and will be measured and paid separately). (A) 112mm thick brick wall. (a) In cement mortar in proportion 1:4.
15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. b) In cement mortar 1:4
a) Applying one coat of cement primer of approved brand and manufacture on new wall surface after throughly brooming the surfaces free from mortar droppings and other foreign matter and including preparing the surface even and sand papered smooth.Qty. as item no. 9/6.2.2
b) Finishing wall with water proofing cement paint of approved brand and manufacture and of required shade on new wall surface (two coats) to give an even shade after throughly brooming the surfaces to remove all dirt and remains of loose powdered materials.Qty.as item no.10/13.2.3 above
Supplying, fitting and fixing chain link fencing of 10 S.W.G, G.I. Wire 50mm x50mm mesh fitted to M.S angle iron post at 2000mm apart of specification detailed below including supplying, fitting and fixing hooks, eye bolts with nuts, staples and bolts including three horizontal lines of G.I wire 10 S.W.G at top,middle and bottom and with one vertical line to each fencing post for keeping the fencing tight and erect complete, including one coat of primer painting to M.S angle iron post in P.C.C base etc.
FOOTHPATH:FILLING: Supplying and filling sand gravel in foundation trenches of column footings over slushy soil including local carriage of materials within 8 km pumping out of water, ramming etc. complete for strengthening the bearing capacity of the soil as directed and specified including payment of Forest Royalty and Sales Tax and other duties and taxes as may be necessary.
BRICKWORK: Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed.(II) In superstructure above plinth level up to 1st floor level.(b) In proportion 1:4.
GATE:EARTHWORK IN EXCAVATION: Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified.(A) Up to a depth of 2.00m below the existing ground level.(a) In ordinary soil.
PLAIN CEMENT CONCRETE WORKS: Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete. (a) In prop 1cement: 3 sand :6 coarse aggregate by volume
REINFORCED CEMENT CONCRETE WORKS: Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine. (A) In substructure up to plinth level.Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level.N) Without using admixture, plasticiser. b) M20 grade concrete or Prop. 1:1.5:3
(B) In super structure from plinth level up to 1st floor level. i) Walls (thickness not less than 100mm) including attached pillasters, buttresses, plinth and string course etc. N) Without using admixture, plasticiser. b) M20 grade concrete or Prop. 1:1.5:3
TIMBER SHUTTERING (FORMWORK): Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.
(b) Using 25mm thick plank
Sides of tie beams, grade beams etc. at or below ground level. (b) Using 25mm thick plank
PLYBOARD SHUTTERING (FORMWORK): Providing form work of 12mm thick Plywood Board so as to give a rough finish including centering, shattering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in situ reinforced concrete and plain concrete work in:
Columns, Pillars, Posts & Strut of square/ rectangular/ polygonal in plan or any shape like Tee/L etc. having plane vertical face
Sides and Soffits of Beams, beam haunchings, cantilever girders, bressumers, lintels and horizontal ties. (a) For depth not exceeding 1.0M.
MASONARY WORKS : Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete.(a).Brick on flat soling.
1st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth up to 1st floor level (protruding M.S rod/Tor steel of column to be embeded in cement mortar and will be measured and paid separately) (A) 112mm thick brick wall. (a) In cement mortar in proportion 1:4. (1 cement:4 sand)
PAVER BLOCK : Providing SUN ROCK HIGH CTS/ DEVI paver block/tiles of concrete grade M30 or above of approved quality, size, shape of specified thickness over a leveling bedding layer of 30mm compacted sand over a base course of WBM or PCC (Base course to be paid separatly) including cutting where necessary finished with spreading , sweeping jointing sand and compacting the pavers using vibrating compactor as specified and directed. SUN ROCK HIGH CTS/ Devi Tiles (Pavers). (a) 80 mm thick.
15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. A) On rough side. b) In cement mortar 1:4.
EXTERIOR PAINTS / COATINGS: Finishing wall with two coats of acrylic emulsion exterior coatings of Unicem "Rakshak" brand of required shade by thinning 1ltr. of paint with 750ml of water to give an even shade after throughly brooming the surfaces to remove all dirt and remains of loose powdered materials as specified and directed by the department
FENCING & GATES : Supplying, fitting and fixing double leaf heavy duty iron gate, frame made from 40mm x 40mm x 6mm M.S. angle and with M.S. flat of 40mm x 6mm size as per approved design. Necessary locking arrangement for temporary closing the gate and 2nos.( minimum) strong iron hinges of M.S bars and flat of same sizes on each leaf to be embedded in C.C brick pillers as necessary including a red oxide painting to all iron works as directed and specified.(Separate payment will be made for posts).
STEEL AND IRON WORKS: REINFORCEMENT: Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) . a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL. (ii)Super Ductile (SD) TMT reinforcement bars.
POLYHOUSE:EXCAVATION : Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level.(a) In ordinary soil
FILLING : Earth/ sand filling in plinth in layers not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified including payment of land compensation, forest royalty, sales tax and other duties and taxes as may be necessary. (c) With river sand or silt (predominantly non plastic) by truck carriage including loading and unloading.
SOLING : Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (a) Brick on flat soling.
PCC : Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1cement: 3 sand :6 coarse aggregate by volume
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in:
Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc. (b) Using 25mm thick plank.
Sides of tie beams, grade beams etc. at or below ground level. (b) Using 25mm thick plank
REINFORCEMENT: Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate). a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL. (ii)Super Ductile (SD) TMT reinforcement bars.
REINFORCED CEMENT CONCRETE WORKS : Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately). (I) Using Mixer Machine. (A) In substructure up to plinth level. Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level.N) Without using admixture, plasticiser. b) M20 grade concrete or Prop. 1:1.5:3.
BRICKWORK : Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed. (I) In Sub-structure upto plinth level including dewatering if necessary.(b) In proportion 1:4.
Green UV Polythin
UV Net
Cost of Frame Structure ( REFER DRAWING)
Labour Cost 30% COST of material and all necessary components
LABOUR HOUSE
Ground floor (Assam type)
SEPTIC TANK : Supplying and placing ferrocement septic tanks of rectangular shape in to pit with manhole cover with cleaning arrangement over single brick flat soling and 75mm 1:3:6 P.C.C. Baffle wall, inlet and outlet etc are provided at suitable points complete as directed. 10 Users
Providing fitting and fixing vitreous water closet squatting pan (Indian type W.C Orissa pattern) with all fittings and fixtures complete including cutting and making good to the walls and floors whereever required. (Flushing Cistern to be paid separately). Indian type W.C Orissa pattern of size 580 x 440 mm. a) White. i) Parryware make.
Pipe & others
Orchid House
Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level.(a) In ordinary soil.
FILLING: Earth/ sand filling in plinth in layers not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified including payment of land compensation, forest royalty, sales tax and other duties and taxes as may be necessary. (c) With river sand or silt (predominantly non plastic) by truck carriage including loading and unloading.
SOLING: Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (a) Brick on flat soling.
Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1cement: 3 sand :6 coarse aggregate by volume.
FORMWORK: Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in:
Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc. (b) Using 25mm thick plank
Sides of tie beams, grade beams etc. at or below ground level (b) Using 25mm thick plank
REINFORCEMENT: Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete.(No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate). a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL.(ii)Super Ductile (SD) TMT reinforcement bars.
REINFORCED CEMENT CONCRETE WORKS: Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) . (I) Using Mixer Machine. (A) In substructure up to plinth level.Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level.N) Without using admixture, plasticiser. b) M20 grade concrete or Prop. 1:1.5:3
Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed. (I) In Sub-structure upto plinth level including dewatering if necessary. (b) In proportion 1:4.
Green UV Polythin
UV Net
Cost of Frame Structure ( REFER DRAWING)
Labour Cost 30% COST of material and all necessary components
GREEN HOUSE
EXCAVATION: Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level.(a) In ordinary soil.
FILLING: Earth/ sand filling in plinth in layers not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified including payment of land compensation, forest royalty, sales tax and other duties and taxes as may be necessary.(c) With river sand or silt (predominantly non plastic) by truck carriage including loading and unloading.
SOILING: Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete.(a) Brick on flat soling.
PCC: Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).(a) In prop 1cement: 3 sand :6 coarse aggregate by volume.
FORMWORK : Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in:
Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.(b) Using 25mm thick plank.
Sides of tie beams, grade beams etc. at or below ground level.(b) Using 25mm thick plank.
REINFORCEMENT: Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete.(No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) .a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL.(ii)Super Ductile (SD) TMT reinforcement bars.
REINFORCED CEMENT CONCRETE WORKS: Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately). (I) Using Mixer Machine. (A) In substructure up to plinth level.Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level.N) Without using admixture, plasticiserb) M20 grade concrete or Prop. 1:1.5:3.
BRICKWORK: Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed. (I) In Sub-structure upto plinth level including dewatering if necessary. (b) In proportion 1:4.
Green UV Polythin
UV Net
Cost of Frame Structure ( REFER DRAWING)
Labour Cost 30% COST of material and all necessary components
SIGN BOARD
Providing, fitting and fixing M.S. grill of required pattern for windows/ clerestory windows/ openingwith M.S. flats at required spacing in frame all round, squre or round M.S. bars with round headed bolts and nuts or screws. I . Plain grill. (b) Fixed to steel frames.
Concrete and Painting Etc…
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .