Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
10 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Drainage Division No.2, Surat.
Drain cleaning work of Bhamaiya Kadodara Drain From NH-48 to Saniya Hemad,Ta:Palsana,Surat District.
291046
37 of 2025-26
Open
Civil - All
Surat
14 documents required · 12 mandatory · 2 optional
₹3,600
Yes
Executive Engineer, Drainage Division No.2, Surat.
₹1.4 L
Yes
28 Mar 2026
28 Mar 2026
28 Mar 2026
10 Apr 2026
28 Mar 2026
Item Rate In
Specification and reference to book of Quantity Unit Amount
No. figures
specifications)
Excavation of canal/drain in all sorts of
soils (including wet and slushy condition
of soil) including depositing the
excavated stuff in uniform layers in
canal banks or in spoil banks or as and
1 wheredirected including dressing the 190182.00 CM 72.00
canal section up to lead of 1.0 K.M and
lift including clearing the site etc.
complete ( By Machinery for canal /
drain maintenance ) (above 1.5 cumecs
capacity )
Rupees One Crores Thirty Six Lacs Ninety Three Thousand One Hundred Four & Ps. Only
I/We am/are willing to carry out the work at _____________ % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my
/our tender works out as under.
Estimate Amount Estimate Amount
put to tender Rs.1,36,93,104.00 put to tender Rs.1,36,93,104.00
Deduct___________ % below Add___________ % Above
( In words) ________________ ( In words) ________________
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
4 where there is a change as per actual mix design the cost of difference of cement consumption have
been deducted from the rate of original item at the rate of input rate ___-___ mentioned in all the
Deputy Executive Engineer Divisional Accountant Executive Engineer
Drainage Design Sub Division Drainage DivisionNo-2 Drainage Division No-2
Surat Surat Surat
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02-01-SBD.pdf
02-02-Schedule B.pdf
Download all tender documents and submit your bid