Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance C 432 KH NO 75 1 GROUND FLOOR BULAND MASJID SHASTRI PARK DELHI 110053 | NORTH EAST DELHI | DELHI | 110053 | ₹23.8 L | L1 | Admitted-Finance |
| 2 | L2₹52.8 LAdmitted-Finance | ₹52.8 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not technically qualified |
| Sl No | Description | Qty | Unit | JUNAID ATEEK L1 | suresh s L2 |
|---|---|---|---|---|---|
| 1.00Providing and applying painting work on exterior surfaces of the building up to 12 floors height, using paint supplied departmentally, on labour contract basis only, including all labour, surface preparation, application, finishing, scaffolding, staging, ladders, tools and tackles, complete, and strictly as per CPWD General Specifications for Building Works (Latest Edition), CPWD Specifications for Painting, CPWD Safety Code, relevant IS Codes, and directions of the Engineer-in-Charge.The item shall include thorough surface preparation such as cleaning, removal of dust, dirt, loose/flaky paint, oil, grease, fungus, algae, and minor surface defects, and proper application of paint to achieve uniform colour, shade, and finish .The contractor shall provide all safety arrangements and personal protective equipment such as safety harnesses, helmets, safety belts, safety nets, life lines, etc., suitable for working at height. The contractor shall also obtain valid insurance for all labourers deployed for the work. All safety and insurance provisions shall be deemed included in the rate. Department-supplied paint shall be issued to the contractor as per requirement, and proper account shall be maintained. | |||||
| 1.10Measurement: Actual painted area measured in square metres (Sq.m) as per CPWD measurement rules. Note: The rate shall be inclusive of the cost of labour, scaffolding, safety measures, insurance for all labourers, leads, lifts, and all incidental charges whatsoever, complete. No extra payment shall be made on account of height of the building, safety provisions, or difficulty in execution of the work. All tools and equipment required for execution of the work such as brushes, rollers, putty blades, scrapers, wire brushes, etc., shall be arranged by the contractor at his own cost. No extra payment shall be admissible on this account. | |||||
| 1.20 | For application of external emulsion | 24,000 | Sqm | 68 ₹16.3 L | 110 ₹26.4 L |
| 1.30 | For appliying surface conditioner | 1,000 | Sqm | 40 ₹40,000 | 20 ₹20,000 |
| 1.40 | For application of external primer | 1,500 | Sqm | 30 ₹45,000 | 60 ₹90,000 |
| 1.50 | For application of enamel | 15,000 | Sqm | 30 ₹4.5 L | 110 ₹16.5 L |
| 1.60 | For application of epoxy primer | 7,000 | Sqm | 30 ₹2.1 L | 125 ₹8.8 L |
Tender Value
₹37.4 L
EMD Value
₹74,746
Closing Date
26 Feb 2026, 4:00 pmClosed
PE-cum-Eo
PE-CUM-EO,IISER,Near Jursey Farm,Vithura
Labour contract for External painting in Anamudi block at IISER Thiruvananthapuram
2026_IISRT_895803_2
IISER-T/2037/42/25-26 DTD 28.01.2026
Open Tender
Civil Works
120 days
Project Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹74,746
5 Mar 2026
19 Feb 2026
27 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Providing and applying painting work on exterior surfaces of the building up to 12 floors height, using paint supplied departmentally, on labour contract basis only, including all labour, surface preparation, application, finishing, scaffolding, staging, ladders, tools and tackles, complete, and strictly as per CPWD General Specifications for Building Works (Latest Edition), CPWD Specifications for Painting, CPWD Safety Code, relevant IS Codes, and directions of the Engineer-in-Charge.The item shall include thorough surface preparation such as cleaning, removal of dust, dirt, loose/flaky paint, oil, grease, fungus, algae, and minor surface defects, and proper application of paint to achieve uniform colour, shade, and finish .The contractor shall provide all safety arrangements and personal protective equipment such as safety harnesses, helmets, safety belts, safety nets, life lines, etc., suitable for working at height. The contractor shall also obtain valid insurance for all labourers deployed for the work. All safety and insurance provisions shall be deemed included in the rate. Department-supplied paint shall be issued to the contractor as per requirement, and proper account shall be maintained.
Measurement: Actual painted area measured in square metres (Sq.m) as per CPWD measurement rules. Note: The rate shall be inclusive of the cost of labour, scaffolding, safety measures, insurance for all labourers, leads, lifts, and all incidental charges whatsoever, complete. No extra payment shall be made on account of height of the building, safety provisions, or difficulty in execution of the work. All tools and equipment required for execution of the work such as brushes, rollers, putty blades, scrapers, wire brushes, etc., shall be arranged by the contractor at his own cost. No extra payment shall be admissible on this account.
For application of external emulsion
For appliying surface conditioner
For application of external primer
For application of enamel
For application of epoxy primer
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
Tendernotice_2.pdf
PDF • 0.39 MB
TendeNoticenew.pdf
Tender Documents • 0.99 MB
BOQ_945269.xls
BOQ • 0.32 MB
Specialconditions.pdf
Additional Documents • 0.37 MB
Download all tender documents and submit your bid