Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
3 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri Sanjivkumar B Patel
Work of various underwater services including underwater videography & photography of TRC area, trash racks of upstream & downstream, draft tube tunnel and NDT(UT) inspection of penstock gate at KHEP
260886
KHEP/MMD/RFQ-72522/WT/25-26
Open
Mechanical - All
Works
Mahisagar
13 documents required · 13 mandatory
₹2,950
GUJARAT STATE ELECTRICITY CORPORATION LIMITED,BANK OF BARODA, TA: Kadana, DIST: Mahisagar, PIN: 389250(GUJ)
₹1.0 L
3 Jan 2026
3 Jan 2026
3 Jan 2026
3 Feb 2026
3 Jan 2026
Name of work: - Work of various underwater services including underwater
videography & photography of TRC area, trash racks of upstream & downstream, draft
tube tunnel and NDT(UT) inspection of penstock gate at KHEP.
Sr. Description No. of sheets
Acknowledgement of Tender Fee / EMD 03 To
Tender Notice
General instructions to the tenderer 10 To
Special Note for qualification & qualification Criteria
Special Conditions
Performa Of Bank Guarantee for Security Deposit/Performance
Scope Of Works
Technical Bid
Annexure –A 58 To
Scope of Works and Conditions.
General terms and Conditions.
Safety rules 77 To
General Gate Pass Procedure.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(ONLINE TENDER WITH ONLY ONLINE SUBMISSION)
TENDER FOR THE WORK: Work of various underwater services including underwater
videography & photography of TRC area, trash racks of upstream & downstream, draft
tube tunnel and NDT(UT) inspection of penstock gate at KHEP.
TENDER FEE PAID VIDE DEMAND DRAFT / RECEIPT / RTGS
RS. ____________________________ EARNEST MONEY DEPOSIT PAID
VIDE RECEIPT NO. \D.D. NO. _____ DATED ____________________
NOTE: THE UNDER SIGNED RESERVES THE RIGHT TO REJECT ANY OR ALL TENDERS
WITHOUT ASSIGNING ANY REASONS THEREOF.
For & On Behalf Of GSECL
Addl. Chief Engineer(G)
GSECL, K.H.E.P.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
“Work of various underwater services including underwater
Sub: videography & photography of TRC area, trash racks of upstream &
downstream, draft tube tunnel and NDT(UT) inspection of penstock
Addl. Chief Engineer (Generation) invites “On line Tender” (e-tender) for below mentioned work,
interested bidders are requested to download tender documents from GSECL website
(www.gsecl.in) (For view and download only) and www.nprocure.com(For view, download and
online submission).
Tender Documents will not be issued in Physical Form from this Office.
The brief details regarding tender/Works are as under:
Name of Work “Work of various underwater services including underwater
videography & photography of TRC area, trash racks of upstream &
downstream, draft tube tunnel and NDT(UT) inspection of penstock
Important Amounts:
Sr. No. Head Amount
1 Tender Fee amount (Non- Rs. 2500 + 18% GST=
2 Earnest Money Deposit (EMD) Rs.
3 Security Deposit (SD) 5% of total order value
Important Dates:
Event Date & Time
1 Last Date & time for submission of Pre-bid queries (if Pre bid
meeting applicable)
2 Date & Time of Pre-Bid meeting (If applicable) NA
3 Last date of On-line (e-tendering) submission of tender documents
[Technical as well as Price bid] along with soft copy of all other
documents as stated here under (This is mandatory). No physical
As per NIT Details
documents shall require from bidders except cover for Tender Fee
and EMD (In case paid through Demand Draft/ Bank Guarantee
4 Last Date for Physical submission of cover for Tender Fee and
As per NIT Details
EMD (In case paid through Demand Draft/ / Bank Guarantee/only).
5 Date of Opening of online Technical Bid, all relevant documents
As per NIT Details
submitted through online process, submission of original D.D &
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
B.G within 05 days from online last bid submission date. Online
technical bid will be opened for bidders who paid tender fee &
EMD (Scan copy must be required to upload in preliminary stage)
6 Date and Time for opening of online submitted price bid for all Will be intimated to
technically acceptable bidders. technically qualified
7 Tender Validity 180 Days from date of
opening of Technical
Important Notes to Bidders:
“Technical bid containing all the relevant documents of tender to be submitted through ONLINE
process only on (n) Procure. No documents (except Demand Draft / Bank Guarantee/ for Tender
Fee and EMD) will be accepted in offline mode or hard copy”. If submitted same will be ignored.
Bidder has to upload scan copy of original documents (notarized/self-attested copies of original as
specified in tender documents)
It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form)
remain legible and should not be password protected. The size of PDF is to be suitable so that it
can be uploaded on line (n-procure).
Only cover for Demand Draft/ / Bank Guarantee for Tender Fee and EMD shall be accepted
through Registered Post AD or Speed Post addressed to Addl. Chief Engineer(Gen.) KHEP, ADM
Building, Diwada Colony, Ta:Kadana. Dist. Mahisagar. Pin Code No. 389250 super scribing the
envelope with Tender No & item description. This is mandatory. “NO COURIER SERVICE OR
HAND DELIVERY” will be accepted.
Envelopes for Tender Fee and EMD shall be super scribed as:
Tender no. KHEP/MMD/RFQ-72522/WT/25-26
Subject “Work of various underwater services including underwater videography
& photography of TRC area, trash racks of upstream & downstream, draft
tube tunnel and NDT(UT) inspection of penstock gate at KHEP”.
Tender fee/EMD shall be accepted through NEFT/RTGS also. In case, payment for Tender Fee
and EMD is done through NEFT / RTGS; the payment details/Receipt must be submitted/ attached
in n-procure (online) in PDF format. In this case no physical documents are required to be
submitted. For NEFT/RTGS payment the bank details are as under.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
BENIFICARY NAME GUJARAT STATE ELECTRICITY CORPORATION
BANK NAME & BANK OF BARODA, TA: Kadana, DIST: Mahisagar,
BRANCH PIN: 389250(GUJ).
IFSC CODE BARB0DIWADA (Fifth digit is zero)
In case, payment for Tender Fee and EMD is done through NEFT / RTGS; Bidder has to submit
the following details to GSECL E-mail [email protected], Bidder has to provide the
details on the same date of payment so that receipt can be generated.
Description/Tender
Purpose of Payment & Tender Fee Rs:
Mode and Date of
Unique Transaction
Reference (UTR) No
Tender received after due date & time of submission shall not be accepted /opened irrespective of
delay due to postal services or any other reasons. GSECL shall not be responsible for late receipt
Following is the certifying agency for obtaining the Digital Signature Certificates (DSC as per
Sr. No. Name of certifying agencies Web Site Address.
1 (n)code Solutions (GNFC) www.tender.nprocure.com
In case bidders need any clarifications/help to participate in online tenders, they can contact (n)
Procure Support team.
Contact Details :
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(n)Code Solutions-A division of GNFC Ltd.,
(n)Procure Cell
501, GNFC Info Tower, S.G. Road, Bodekdev, Ahmedabad – 380054 (Gujarat)
E-mail: [email protected]
Any deviation found in Data / Details / Documents between on line offer (e-tendering) and physically
submitted documents (Tender document fee, Technical offer of the bidder) offer of the same bidder will
not be considered and no any further communication in the matter will be entertained.
Tenderer should quote the reference of payment of EMD i.e. RTGS. No. & Date or DD. No. & Date.
Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
All Nationalized Bank
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Guarantees issued by following banks will be accepted as EMD for period up to
March 31, 2026. The validity cut-off date in GR is with respect to date of issue of
Bank Guarantee irrespective of date of termination of Bank Guarantee.
All the eligible banks are instructed to collect the original documents/ papers of
guarantee from the concerned tendering authority.
Download Tender Documents in (PDF Format) which consists of:
Part I Commercial Terms & Conditions, Rules For Works Tender(General Safety Rules/
Norms, Labour Laws, General Rules and directions for the guidance of contractor booklet)
Part II Schedule “B” indicating the Item description, quantities & terms.
To view the PDF file please use “Acrobat Reader” soft ware which can be downloaded
from “Adobe” website.
For & On Behalf Of GSECL
Addl.Chief Engineer(G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Name of Proprietor of Firm
2 Contact Person’s Name
3 Contact No. (Mobile No.)
4 e-Mail id for communication
5 Firm Address for
7 Firm’s Bank Detail with IFSC
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
1. GENERAL INSTRUCTIONS TO THE TENDERER.
2. SPECIAL NOTE FOR QUALIFICATION.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GENERAL INSTRUCTIONS TO THE BIDDERS
1. Contract means the documents forming tender and the subsequent agreement that may
be entered into.
2. Work or works means the work related to the subject mentioned in tender
3. Contractor means a firm or an individual undertaking these works or offers the rates for
4. The general rules and regulations of the GSECL for tender and contract for works will
apply to the extent of the same and not modified herein. The contractor is deemed to
have gone through and considered to be fully aware of the conditions mentioned therein.
5. Duly signed technical bid (and all supporting/ qualifying documents are submitted in
online n-procure system. no any physical submission required. Physical submission of
technical bid will not be considered. Only cover for Demand Draft/ / Bank Guarantee for
Tender Fee and EMD are to be kept in only one cover duly super scribe with detail of
Tender Fee / EMD and tender no/subject shall be accepted by RPAD/ speed post only at
The Addl.Chief Engineer(Gen.) KHEP, ADM Building,Diwada Colony,Ta:Kadana.
Dist.Mahisagar. Pin Code No. 389250The bidder should submit price bid in on line tender
on web site www.nprocure.com or .gsecl.nprocure.com. Hard copy of the price bid will
not be considered. Offer of the bidder who has not submitted on line tender
on web site www.nprocure.com or .gsecl.nprocure.com will out rightly rejected.
The tenders will be opened in the presence of bidders, who wish to remain present at the
time of opening of tenders.
Addl. Chief Engineer (G), KHEP reserves the right to reject any or all tenders without
assigning any reason thereof.
Tender fee (Non-refundable) as notified in the tender notice [Which is inclusive of GST]
should invariably be paid by way of Demand Draft, RTGS & NEFT & Cash up to
otherwise offer will be ignored out rightly. Indian Postal orders (IPO’s) & Cheques are not
Demand Draft should be in the name of the “Gujarat State Electricity Corporation
Limited”, Payable at Bank of baroda (Branch code: BARB0DIWADA (Fifth digit is zero))
Diwada Colony branch. The envelope shall be addressed to the Addl.Chief Engineer,
KHEP, Kadana and the GSECL will not be responsible for the transit loss or
7. Earnest Money Deposit:
(a) The estimated cost of tender items is notified in the tender notice. Bidder has to pay
EMD. The EMD is payable by Demand Draft and RTGS & NEFT in favor of the “Gujarat
State Electricity Corporation Limited”, Payable at bank of baroda (Branch code:
BARB0DIWADA (Fifth digit is zero)) Diwada Colony branch. It can also be furnished by
way of an irrevocable Bank Guarantee from any Scheduled/Nationalized Bank in a
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
standard format prescribed by the GSECL (Format given in this tender document).
Cheques are not acceptable. CORPORATE BANK GUARANTEES not allowed.
(b) Government or Semi-Government Organizations, which are run departmentally & are not
limited Companies, will be eligible for exemption from payment of E.M.D.
(c) No Interest will be allowed against payment of E.M.D.
(d) Tenders submitted without Earnest Money Deposit by the firms will be rejected without
entering in to further correspondence in this regard and no reference will also be made.
(e) EMD will be forfeited (i) if the tender, which it covers, is withdrawn during the validity of
the offer and (ii) the successful bidder fails to furnish the security deposit in time.
(f) EMD of the unsuccessful bidders will be returned within 60 days of placement of the
order and when the bidder returns the original receipt of the EMD together with the
advanced stamped receipt.
8. Gujarat State Electricity Corporation Ltd. reserves the right to accept/reject/Cancel any or
all the offers/tenders, extend dates and / or re-advertise tender, and /or modify the
process at any stage of the process without assigning any reason thereof.
9. The bidder shall quote only certain percentage of rates above or below the estimated
rates, i.e., bidder should quote either, say A% above the estimate or B% below the
estimate for all the items. The bidder should not quote different percentage for different
items. Tenders received with different percentage rates for different items shall be liable
to be rejected. The bidder should quote only percentage higher/lower in figures as well as
in words in Schedule-B. In case of not mentioning clearly above/below the estimate, the
GSECL shall consider the quoted percentage below the estimate and the contractor must
have to honor this, failing which suitable actions may be taken, considering this as
dishonor and/or summary rejection of offer without assigning any reason thereof as
deemed fit by Addl. Chief Engineer. The rate quoted should be inclusive of all taxes and
expenses, if any. Nothing will be paid extra as a part of contract unless & until, it is
specified in the tender documents by Gujarat State Electricity Corporation Ltd.
10. Revision of prices:
Revision of prices or any commercial terms affecting the price after opening of technical
bids shall not be considered and will be ignored.
11. Price Escalation:
No price escalation will be given till the completion of the work. The bidders must quote
firm price only, during execution & extended period, without any escalation towards
labour, material, fuel etc., till completion of work under contract and this is to be
confirmed by bidder in technical bid envelope only. In case, if the bidder does not offer
firm prices, his offer shall be rejected and the price bid envelope shall not be opened.
12. The tender documents shall be written legibly and free from erasure, over writings or
conversions of figures. Corrections unavoidable shall be made by crossing out, initialing,
dating and rewriting.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
13. The rates quoted shall be firm and valid for 180 days for acceptance from the date of
opening of technical bid.
14. Conditional tender is liable to be rejected. Withdrawal or insertion of conditions
unilaterally after opening of tenders will not be permitted unless it is so desired by the
15. Addl Chief Engineer, KHEP reserves the right to reject any or all tenders without
assigning any reasons thereof.
16. Security Deposit :
(a) Security Deposit should be paid within 10 (ten) days after receipt of LOI. The successful
bidder will be required to pay an amount equivalent to 5% of the value of the order as a
Security deposit for satisfactory execution of the contract. Security deposit for
satisfactory/successful execution is payable either in RTGS / D.D./ Bank Guarantees
(b) Bank Guarantees from Scheduled / Nationalized Banks is also acceptable if the amount
of security deposit payable exceed Rs. 5,000/-. The Bank Guarantees will be executed
on the standard form prescribed by the GSECL. In case of the Bank Guarantees
furnished / submitted, they should have clear one time validity till the completion of the
order in all respect. Bank Guarantee for Interim period will not be allowed. If by any
reasons the Work period is extended then Contractor should undertake to renew the
Bank Guarantee at least one month before the expiry of the validity, failing which GSECL
will be at liberty to encash the same. CORPORATE BANK GUARANTEES are not
(c) The GSECL reserves the right to forfeit the SD in case of any breach of contract and in
case of disputes. The decision of Addl. Chief Engineer, KHEP shall be final, binding and
acceptable to the contractor. If the contractor fails to start the work as stipulated, the
EMD and the SD shall be forfeited.
1. The security Deposit/ Bank guarantee covering execution of the contract will be released
only on successful execution of contract and on receipt of the “NO Objection
Certificate” from the Engineer In charge of the work.
17. Performance Guarantee (PG): if applicable to this contract then,
(a) The successful bidder shall have to furnish PG.
The Performance Guarantee for the tendered items wherever applicable shall be
furnished in the form of D.D and by Bank Guarantee, valid for the period as per Technical
Specifications and should have clear one time validity for the full period.
(b) Performance Guarantee for an interim period will not be allowed. However, in case of
expiry of PG before the said period the same should be got extended / renewed till the
completion by the contractor at least one month before the expiry of the validity, failing
which GSECL will be at liberty to encash the same, without entering into further
correspondence, formalities, etc. in the matter.
“NO STAGEWISE BANK GUARANTEES WILL BE ACCEPTABLE IN ANY CASE.”
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
The supplier/contractor/party (i.e tenderer) has to give bank guarantee with validity
period of additional 01(one) months i.e. more than actual Guarantee/Warranty
period of 06/12/18/24/36/ 48/60 months (depending upon the product) to safe guard
Company's interest in case of eventuality happening on the last day of
Guarantee/Warranty period after office hours of the Bank or Bank Holidays."
18. Subletting of tender is not permitted without prior approval of KHEP-GSECL.
19. GSECL reserves right to divide work to nos. of agencies.
20. The work will be awarded to each agency as per site requirement & as per instruction of
21. Technical Bids received will be opened online if possible on the day and time indicated
in the tender notice by an Officer nominated by the GSECL. Time and date for opening of
price bids will be determined by the GSECL and intimated to only qualified bidders after
the Technical Bid proposals are opened, analyzed as per post – qualification criteria
mentioned in special note and all clarifications, if any, obtained from the bidder and
verified by GSECL from the issuing authority if necessary.
22. The bidders shall submit their offer online without any deviations to the Technical
specifications, Commercial conditions and General Terms and Conditions of the contract
& it will be presumed that the bidder agrees entirely with the specification and all other
conditions of tender.
23. The bidder shall not be allowed to submit revised / additional / modified offer even
before due date and time of submission of tender. However if the date of submission of
tender are extended by the GSECL due to any reason the bidder may submit if he wishes
the revised / additional / modified offer before extended due date and time of submission.
24. The GSECL reserves the right to accept any tender irrespective of whether it is lowest or
not or to reject all the tenders without assigning any reasons thereof. Tenders departing
from the stipulated technical specifications, commercial conditions or the method of
bidding in a radical manner are liable to be rejected
25. The bidder must visit the site before submitting the tender. The bidder shall be presumed
to have carefully examined the conditions & specifications of work and to have fully
acquainted themselves with all details of the site conditions, locations, materials,
geological and weather characteristics, labour conditions and in general all the necessary
information and data etc. pertaining to and need for the work
26. The online bid submitted by bidders who are listed under declaration of ineligibility for
corrupt or fraudulent practices issued by the Government, the list of Black listed
contractors announced by GUVNL/GSECL, Govt. of Gujarat or its Public sector
undertaking, shall be rejected.
27. Any online offer not bearing signature of the bidder & with seal of company on all
the documents accompanying the tender is liable to be rejected.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
28. Tender shall remain open for acceptance for a period of 180 days from the date of
opening of Technical bid and during this period no bidder shall be allowed to withdraw his
tender. Any such withdrawal during the said period will entail forfeiture of the earnest
money deposit submitted along with the tender and the GSECL may take further action
like “no dealing” with such bidder in future tenders of GSECL or any company under
29. The Notice inviting tender, general instruction to bidders and all other documents of this
tender shall form part of the contract
30. The information given in this specification is in good faith and meant to serve as a guide
to the BIDDER. It is, therefore, imperative that BIDDER shall obtain and examine for
himself all the data, information and particulars required for the satisfactory execution of
the work under this enquiry. The submission of a bid by Bidder implies that he has fully
read the specifications, bid drawing, Contractor Document and General Conditions of
Contract and has made himself aware of the scope and the specifications for the work to
be performed and local conditions and other features which have a bearing on the cost
and execution of the work. The ENGINEER-IN- CHARGE (GSECL) shall not, therefore,
after acceptance of the bid, pay any extra charges for any reason whatsoever.
31. Each page of the bid document shall be signed and dated in ink by the BIDDER as a
token of having examined the same.
32. ACCEPTANCE / REJECTION OF BID
a. GSECL reserves the right to accept or reject any bid in whole or part and/or accept other
than the lowest bid without assigning any reasons.
b. The bid is liable for rejection prima facie, if it is:
a. Not in the prescribed form & sealed.
b. Not properly signed by the BIDDER in ONLINE-SUBMISSION.
c. Not conforming to TENDER specification.
d. Received after expiry of the due date and time. e. Received by telex or telegram or fax or
33. SUBMISSION OF TENDER
Only cover for Demand Draft/ / Bank Guarantee for Tender Fee and EMD must reach to
the office of ACE Engineer [Gen], GSECL, KHEP ADM office,
Ta;Kadana,Dist:Mahisagar,Diwda Colony-389250 mentioned in tender notice.
34. Any clarification/queries asked by GSECL / GSECL's representative about tender/offer
shall have to be furnished by the contractor; otherwise the offer of the firm will be liable to
35. Tenders which do not fulfill all or any of the above conditions or incomplete in any
respect, are liable to rejection
36. If participating bidder/agency have stake in one or more other agencies/ bidders who are
participating in same tender and on account of submission of wrong information /
declaration in the tender /enquiry certificate – A, than the bidder will be declared as
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
disqualified automatically and EMD/SD will be forfeited. Further, GSECL shall take stern
action including Stop dealing with their firms.
37. The bidder should certify that the wages payment to the staff / labour engaged for the
work at GSECL – KHEP will be made through bank account only and a written
declaration is to be submitted with technical bid by the contractor. The bidder will have to
submit the bank statement as a proof of wages payment, PF challan along with the
monthly bill for payment to the account section.
38. Tenders shall be evaluated on firm price and cost without GST and cess as applicable
unless otherwise mentioned in the tender documents.
39. Bidders are requested to mention applicable HSN/SAC code for each item at given
column in attached “Schedule – B”.
40. Bidders are requested to mention applicable GST rate in given column.
41. If the supplier/contractor have quoted ‘ZERO’ GST, in that case liability of GST or any
additional GST will have to be borne by the tenderer himself. In no case additional
amount toward GST or otherwise will be paid /reimbursed to supplier/contractor.
42. Every bidder should mention separate HSN/SAC Code and rate of GST and cess as
43. Every bidder shall have to inform their GSTIN NO of the registered place where from the
bidder intends to supply the goods/services ,meaning thereby the bidder has supply the
goods/ services from the relevant declared /registered place(s) of supply Only.
44. All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm along with a
certificate regarding verification of authenticity of documents as per the format placed at
Annexure-1. All the documents submitted by the bidder in support of the meeting Technical
QR only (1) shall be digitally signed by the Specified Third- Party Inspection Agency (TPIA) or
Statutory Auditor of their Company or Practicing CA/CA Firm. In case documents are certified
& verified for authenticity through TPIA, the verification and certification of authenticity of
documents is acceptable from any of the following TPIAs:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd. Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd .- Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s India SGS Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt. Ltd.
9. M/s Bureau Veritas (India) Pvt. Ltd.
10. M/s Hertz Inspection & Services Pvt. Ltd.
11. M/s IRCLASS Systems and Solutions Pvt. Ltd.
Bidders shall be responsible for getting their documents/ credentials verified & certified by the
Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm in support of Technical QR. All the costs pertaining to third party
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
verification and certification (including those by statutory auditors) shall be borne by the
Bidder. GSECL shall have no liability (financial or otherwise) towards the same and shall not
be liable for any claim/ dispute between the bidder and the Specified Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm."
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in/accreditation/reg_bod_inspection_bodies.php
List of Documents to be certified are as under,
1. Past order copy other than GSECL
2. Details of registered partnership deed in case of partnership firm
3. Financial standing through latest I.T.C.C Annual report (balance sheet and Profit & Loss
Account) of last 3 years.
4. Any other supporting documents in respect of prequalification criteria.
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …….. in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ………………. (hereinafter called Bidder) having Registered office at …………………
intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents pertaining
to Qualifying Requirement duly verified and certified by Third-Party Inspection Agency (TPIA)
or Statutory Auditor of their Company or Practicing CA/CA Firm as per the list mentioned in the
bidding documents.In this regard, it is hereby confirmed that we have examined the following
documents, which are also attached with this letter. The same has been verified from the
Original Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. ……….. dated …….. (Name of document)
2. Doc ref. no. ……….. dated …….. (Name of document)
All the aforesaid documents have been digitally signed by us as a certificate of authenticity.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
We further confirm that we neither have any vested interest in aforesaid tender nor have any
conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s.
For & on behalf of GSECL
Addl. Chief Engineer (G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GENERAL INSTRUCTIONS TO THE TENDERERS
1.0. On line percentage rate tenders are hereby invited from Gujarat State Electricity
Corporation Ltd., Kadana Hydro Electric Project, and Diwada Colony -
(hereafter referred to as GSECL or Purchaser or Owner). Project is located in the
State of Gujarat in Mahisagar District.
2.0. The scope of work is explained in Tender specification. The work shall be carried
out according to the enclosed General Conditions and Technical Specifications
and the drawings etc.
3.0 The following documents must be scanned and uploaded clearly marking the
name of work in schedule time.
01 Details of RTGS/Demand Draft for EMD.
02 Details of RTGS/Demand Draft for Tender fee.
03 Self-Attested copy of Registration Certificates enlisted with, Govt. /Semi
Govt., etc., as stated in Tender Notice. Joint Venture is not acceptable.
04 Self-Attested copy of work experience certificate for the similar nature &
magnitude of works executed as per requirement in qualification criteria.
05 List of works in progress.
06 Self-Attested copy of document showing “Provident Fund Number in
name” obtained by the bidder.
07 Self-Attested copy of Company Registration or Partnership Deed
8 Self-Attested copy of Power of Attorney, if any for signing the bid
9 Self-Attested copy of Balance Sheet of Profit & Loss account of last
financial years duly audited by Chartered Accountant.
10 Self-Attested copy of latest Solvency Certificate issued by nationalized
bank OR IDBI, AXIS, HDFC, ICICI bank, the Kalupur Commercial
Cooperative Bank Ltd (Not older than one year) for 20% of Tender Value.
11 Details of equipment, tools & plant immediately available with the tenderer
for use of this work.
12 Details of technical personnel.
13 Tender document (except Schedule –B) duly signed.
14 Self-Attested copy of PAN Card
4.0 Bidders are requested to pay an earnest money deposit by demand draft payable
at Bank of Baroda, Diwada Colony or BG of any Nationalized bank OR
IDBI,AXIS,HDFC,ICICI bank, the Kalupur Commercial Cooperative Bank Ltd
payable at Diwada Colony for the amount as specified in the tender notice with
technical bid cover only. This earnest money will be forfeited by the GSECL in
case of successful bidder who after his tender has been accepted (in form of LOI /
Work order) before validity of offer & refuses to pay the security deposit or sign
and complete the contract document and the bidder may be disqualified from
tendering for further work. The earnest money will be refunded to all unsuccessful
bidders after award of contract or after expiry of the validity of the offer. Tenders
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
without payment of EMD are liable for rejection. The EMD will be returned promptly
to the unsuccessful tenderers except L1, L2 & L3. The successful contractor
should pay Security Deposit as mentioned in LOI.
5.0 The Technical Bids received online will be opened Online if possible on the day
and time indicated in the tender notice by an Officer nominated by the GSECL.
6.0 The bidders shall submit their offer without any deviations to the Technical
specifications, Commercial conditions and General Terms and Conditions of the
contract & it will be presumed that the bidder agrees entirely with the specification
and all other conditions of tender.
7.0 Tenders received after the time and date specified in tender notice will not be
accepted. Once the offer is submitted by the tenderer before due date of
submission, the tenderer shall not be allowed to submit revised / additional /
modified offer even before due date and time of submission of tender. However if
the date of issue and/or submission of tender are extended by the GSECL due to
any reason the tenderer may submit if he wishes the revised / additional / modified
offer before extended due date and time of submission.
8.0 The work shall be completed within the period stipulated in the contract. However,
it may be noted that drawings shall be released progressively (if required) & site
clearance arranged accordingly to the progress of work at site. Therefore the
contractor has to organize & coordinate the work to suit these. In the event of any
delay due to the above or due to any other reason not attributable to the
contractor, reasonable extension in completing the work may be given at the
discretion and as decided by the GSECL but no compensation or idle charges will
be paid to the contractor on this account or any site conditions under any
9.0 The GSECL reserves the right to accept any tender irrespective of whether it is
lowest or not or to reject all the tenders without assigning any reasons thereof.
Tenders departing from the stipulated technical specifications, commercial
conditions or the method of bidding in a radical manner are liable to be rejected.
10.0 The Tenderer must visit the site before submitting the tender. The tenderers shall
be presumed to have carefully examined the drawings, conditions & specifications
of work and to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological and weather characteristics, labour
conditions and in general all the necessary information and data etc. pertaining to
and need for the work.
11.0 On acceptance of the tender the name (s) of the accredited representative (s) of
the tenderer who would be responsible for taking instructions from the Engineer-in-
charge shall be communicated to the Engineer-in-charge.
12.0 All royalties, sales tax, toll tax, local tax, development charges, GST and any other
taxes including works contract tax etc. in respect of this contract and also any
statutory variation in future towards above mentioned taxes & any other taxes if
levied in future by statutory authority applicable to this contract shall be payable by
the Contractor and GSECL will not entertain any claim whatsoever in this respect.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
The rates will be” Excluding the GST “. The reimbursement against “GST “will be
paid to the contractor as per Govt. rules & regulations, The Proof of payment made
by the contractor to the appropriate department shall be submitted to GSECL,
failing which appropriate amount shall be withheld on getting information/
instruction from the concerned department.
13.0 The price bids of only those bidders shall be opened, who will be technically
qualified on scrutiny of technical bid as per criteria mentioned in “Special note for
Qualifications”. The GSECL may get verification of certificate/details submitted by
contractor directly from the authority who have issued certificate/details.
14.0 This specification is intended as a general description of quality envisaged for
materials and workmanship and of the finished work. It is not, intended to cover
minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Owner. Special techniques
approved by the Purchaser shall be used if and where found necessary without
any extra claim. This specification shall have precedence if anything contrary to
this is stated elsewhere in the Tender documents. The Purchaser’s decision shall
be final and binding on the contractor on any issue arising out of such
15.0 The bid submitted by bidders who are listed under declaration of ineligibility for
corrupt or fraudulent practices issued by the Government, the list of Black listed
contractors announced by GUVNL/GSECL/GETCO/DISCOM, Govt. of Gujarat or
its Public sector undertaking, shall be rejected.
16.0 The technical bids of qualified offers will be opened on the notified date and online
only. Time and date for opening of price bids will be determined by the Purchaser
and intimated to only qualified bidders after the Technical Bid proposals are
opened, analyzed as per qualification criteria mentioned in special note and all
clarifications, if any, obtained from the bidder and verified by GSECL from the
issuing authority if necessary.
17.0 The successful contractor will have to sign contract agreement as per the Gujarat
State Electricity Corporation Limited’s rules on stamp paper of Rs. 300/- (Non-
Judicial) and the necessary stamp duty charges shall be borne by the contractor.
18.0 Bidders must submit online schedule of quantities and rates and other schedules
duly signed. Any tender not bearing signature of the bidder & with seal of company
on all the documents accompanying the tender is liable to be rejected.
19.0 Tenders which do not fulfill all or any of the above conditions & those specified in
the documents attached with this contract condition or incomplete in any respect,
are liable to rejection.
20.0 The GSECL will not pay any extra charges or rate for any reasons in case the
contractor claims, after acceptance of contract to have misjudged the site
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
21.0 The contractor must arrange for all transport of materials and include all such costs
in the rates quoted by him for finished work.
22.0 The percentage rates and price shall be written both in words, and figures and the
units in words. The tender documents shall be written legibly and free from
erasure, over writings or conversions of figures. Corrections unavoidable shall be
made by crossing out, initialing, dating and rewriting. Incase of any ambiguity or
mistakes the unit rates and prices written in words shall be considered as final.
23.0 The contract or any part thereof shall not be subject to change without the written
permission of the Addl CHIEF ENGINEER or his authorized representatives from
issuing authority of certificates / details.
24.0 Tender shall remain open for acceptance for a period of 180 days from the date of
opening of Technical bid and during this period no bidder shall be allowed to
withdraw his tender. Any such withdrawal during the said period will entail
forfeiture of the earnest money deposit submitted along with the tender and the
GSECL may take further action like “not dealing” with such bidder in future tenders
of GSECL or any company under GUVNL.
25.0 Further information required, if any, can be had from the office of the Addl. CHIEF
ENGINEER, GUJARAT STATE ELECTRICITY CORPORATION LTD., DIWADA
COLONY. But it must be clearly understood that the tenders must be received
complete in every respect by the due date and time.
26.0 The Notice inviting tender, general instruction to bidders and all other documents
of this tender shall form part of the contract.
27.0 The electric power connection for construction/work purpose shall be given at one
mutually agreed point at work site free of cost by the GSECL. Further extension
will have to be carried out by the contractor as per requirement at their cost. The
necessary consumption charges will be recovered as per the tariff rate of GSECL
from time to time as per GSECL's rules.
28.0 Looking to the present conditions at power station site, GSECL cannot provide any
quarter to contractor. If however there are any surplus quarters available after
meeting the requirement of GSECL's staff, then GSECL will consider allotting of
quarters on rent as per GSECL's rule.
29.0 Water for construction purpose will be arranged by the contractor at his own cost.
If possible, water for construction purpose only may be supplied by GSECL at one
point as decided by the Engineer-in -charge and recovery for water charges shall
be affected at two percent of cost of item in which cement is used & the water
supplied by the GSECL is used as certified by the E.I.C
30.0. Work carried under this contract shall be completed in all respect within time limit
from the date of issue of letter for commencement of work given by Engineer-in-
charge at site.
31.0 The bidders must quote firm price only, during execution & extended period if any,
without any escalation towards labour, material, fuel etc., till completion of work
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
under contract and this is to be confirmed by bidder in technical bid envelope only.
In case, if the bidder does not offer firm prices, his offer shall be rejected and the
price bid envelope shall not be opened.
32.0 Each tenderer shall also submit a Declaration online to the effect that the tenderer
has successfully carried out works of this nature and has adequate organization
and experienced personnel to handle this type of work. Information should also be
given regarding the constitution of the firm; it’s authorized, subscribed and paid up
capital, the date and place of registration, the place of business, the names of the
directors and other relevant information. In the case of non-Indian firms the
'Declaration' should also include an undertaking to get the firm registered in India.
33.0 Each tender shall contain the name, residence and place of business of person or
persons making the tender and shall be signed by the tenderer with his usual
signature. Tender by partnerships shall furnish the full names of all partners. It
shall be signed with the partnership name by one of the members of the
partnership or by an authorized representative followed by the name and
designation of the person signing. Tenders by corporation shall be signed with the
legal name of the Corporation followed by the name of the state of incorporation
and by the signature and designation of the president, secretary or other person
authorized to bind it in the matter with rubber seal of the Company.
An attested copy of the constitution of the firm with the name of partners shall be
furnished online. Whenever, whether in submission of the tender or later in other
matters, the signatures are made by one person on behalf of a partnership or a
firm or a corporation an attested copy of the resolution of the partners or of the
GSECL of Directors or an authority acceptable in law shall be supplied by the
tenderer authorizing acceptance, binding and signature by the said person.
Witnesses and sureties shall be persons of status and probity and their names,
occupation and address shall be stated below their signature. All signatures shall
34.0 The information given in this specification is in good faith and meant to serve as a
guide to the BIDDER. It is, therefore, imperative that BIDDER shall obtain and
examine for himself all the data, information and particulars required for the
satisfactory execution of the work under this enquiry. The submission of a bid by
Bidder implies that he has fully read the specifications, bid drawing, Contractor
Document and General Conditions of Contract and has made himself aware of the
scope and the specifications for the work to be performed and local conditions and
other features which have a bearing on the cost and execution of the work. The
ENGINEER-IN- CHARGE (GSECL) shall not, therefore, after acceptance of the
bid, pay any extra charges for any reason whatsoever.
35.0 In case of conflict/discrepancies among clauses of different specifications given in
this document, the stringent specification shall be followed and under such
circumstances, the decision of the EIC shall be final and binding to the
36.0 It is the intent of the EIC to incorporate these specification documents in the final
‘Contract’. BIDDERS are required to read these documents and clearly state in
their proposals their acceptance of the same.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
37.0 The BIDDER shall be deemed to have carefully examined the ‘Specification’ in its
complete form and to have fully informed and satisfied himself as to the details,
nature, character and quantities of the work to be carried out, site conditions and
other pertinent matters and details. Ignorance of the intents and contents of the
specification document shall not be accepted by the OWNER as basis for any
claims for compensation.
38.0 Contractor shall attend meetings at EIC's office at site or any other place as fixed
by the EIC, as and when required for review, discussion, coordination etc.
Attending these meetings shall be obligatory on the part of the CONTRACTOR, at
no cost to the EIC.
39.0 Contractor’s scope of work shall also include making all necessary arrangements
for access to the storage yard from the nearest approach road and further to the
actual site of work to facilitate transportation of machinery and equipment, duly
considering the existing site conditions.
40.0 Time is the essence of this Contract. The whole of works must proceed as
described in these specifications and as directed by the EIC. No extra payment or
relaxation in the rates will be permitted on account of this.
41.0 Work shall commence from the date given in letter to commence the work by IC at
site. The CONTRACTOR shall make all necessary arrangements at site o mobilize
labour, operators and materials and maintain necessary number of
WORKERS/TECHNICIANS and equipment to guarantee the agreed rate of
progress of work as per schedule.
42.0 Work covered under this specification shall be completed in all respects, as
stipulated under scope of work.
43.0 A detailed work schedule indicating the proposed plan for carrying out the work,
specifically mentioning time periods as well as date of commencement and
completion of each activity and such approved schedules must be strictly adhered
to by the CONTRACTOR. After the owner has agreed with the schedule, the
Contractor shall prepare detailed programme of each work front / activity breaking
it down giving daily quantifiable /measure of progress. The schedules are to be
reviewed periodically with the OWNER / ENGINEER to ensure that the completion
date will be met or to institute corrective steps (at no extra cost to the ENGINEER)
to adhere to the completion dates. The OWNER reserves the right to revise the
schedule at his discretion in order to keep up to the completion date and to suit the
project requirement and such alterations shall not entitle the CONTRACTOR to
any extra payment.
44.0 BIDDER shall furnish a complete bar chart showing dates of start and completion
of various activities keeping in mind the periods of completion of the project.
45.0 INSPECTION OF SITE BY BIDDER
45.1 BIDDER shall inspect the site, examine and obtain all information required and
satisfy himself regarding matters such as sub-surface conditions, water records,
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
access to site, communication, transport, right of way, the type and number of
equipment and facilities required for the satisfactory completion of work, the
quantity of various items of the work, the availability and rates of material, local
working conditions, uncertainties of weather, obstructions and hindrances that may
arise etc. which may affect the work or cost thereof, before submission of his bid
any ignorance of site conditions shall not be accepted by the E.I.C. as basis for
any claim for compensation. The submission of a bid by the BIDDER will be
construed as evidence that such an examination was made and any later claims/
disputes in regard to rates quoted shall not be entertained or considered by the
45.2 The rates quoted by BIDDER shall be based on his own knowledge and judgment
of the conditions and hazards involved and shall not be based on any
representations of the Engineer. No claim on this account shall be admitted by the
46.0 PRICES AND RATES
46.1 Percentage quoted for Prices and rates shall include cost of all materials, labour,
supervision, setting out, machinery and equipment, transport charges, wastage of
material, all consumables such as, but not limited to petrol, oil, diesel, lubricants,
drill bits, pipes, ropes etc. construction facilities such as scaffolding, cribbing,
tarpaulins, wind break, etc., taxes, duties, royalties, octroi, entry tax, works
contracts tax and any other levies payable on all transactions, all leads and lifts,
etc. overheads/profits of CONTRACTOR for due performance of the work under
this contract. The rates shall also include cost for mobilization/ demobilization of
equipment, dewatering, clearing of the site both prior to commencement of work
and after its completion.
46.2 Percentage quoted for Prices and rates shall provide for all details of construction,
which are obviously and fairly intended and which may not have been specifically
referred to in these documents and shall be deemed to include everything
necessary to satisfactorily complete the work as determined by the EIC.
Percentage quoted for Prices and rates shall be firm for the entire duration of the
contract and any agreed extensions thereafter, without any escalation in prices.
47.0 Each page of the bid document including the bid drawings shall be signed and
dated in ink by the BIDDER as a token of having examined the same.
Noncompliance with these conditions will make the bid liable for rejection.
48.0 ACCEPTANCE / REJECTION OF BID
48.1 GSECL reserves the right to accept or reject any bid in whole or part and/or accept
other than the lowest bid without assigning any reasons.
48.2 The bid is liable for rejection prima facie, if it is:
a. Not in the prescribed form.
b. Not properly signed by the BIDDER.
c. Not conforming to TENDER specification.
d. Received after expiry of the due date and time.
e. Received by telex or telegram or fax.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
f. Without payment of EMD
g. Without payment of tender fee
49.0 SUBMISSION OF TENDER
49.1 Only cover for Demand Draft/ / Bank Guarantee for Tender Fee and EMD shall
reach to the office of Addl. Chief Engineer, GSECL, KHEP Diwada Colony on or
before due date and time of submission mentioned in tender notice, irrespective of
delay due to postal services or any other reasons, and the GSECL shall not take
any responsibility for late receipt, received after the due date and time of
submission shall not be considered.
49.2 GSECL reserves the right to delete any item of schedule-B for which contractor
shall not have any right to claim on this account.
50.0 During the execution of the work if it is found that the work is not progressing as
per the scheduled program, approved by the GSECL & planned by the contractor,
due to the reasons attributable to the contractor, suitable action shall be taken as
per Clause No. 2, 3 & other relevant clauses appearing in the section of “Tender
and Contract for works” of tender document. And the GSECL may also take such
action as it may deem fit to ensure that the work is completed in time at risk and
cost of the contractor.
51.0 The quantities in attached schedule-B are estimated quantities and may vary on
execution up to any extent for individual items.
52.0 No payment shall be made on supply items at site but payment shall be made on
the executed works items only.
53.0 The contractor shall take all requisite and necessary care to observe that no
damage is caused to the existing structures of KADANA HEP and any other
structures, the contractor shall be held responsible for such damage and they will
have to rectify such damage immediately.
54.0 No idle charges shall be entertained by Gujarat State Electricity Corporation Ltd.
for any misjudge site conditions or any circumstances.
55.0 The Contractor shall take all requisite & necessary care to observe that no damage
is caused to the existing structures situated at KADANA HEP. For any damage to
the existing Structures of Govt. of Gujarat or Gujarat State Electricity Corporation
Ltd., or of any others, the Contractor shall be held responsible, and he will have to
rectify the damage immediately up to the satisfaction of Engineer in Charge, at his
56.0 The Bidders shall note:
Percentage rates quoted shall cater for the cost of all materials & labour including
all leads & lifts, tools, plants, consumables such as but not limited to fuels,
lubricants, etc. cost due to mobilizing / demobilizing, temporary / permanent
constructions. Percentage rates quoted shall include for the details of
constructions, which are obviously & fairly intended & which may not have been
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
specifically referred to in these documents but are essential for the satisfactory
completion of the work.
57.0 Tenders who do not fulfill all the above conditions & those specified in the
documents attached with this contract document or incomplete in any respect are
liable to rejection.
58.0 The contractor shall have a separate Provident Fund Code of RPFC in the name of
company. The contractor, who does not posses such separate P.F. code, shall not
be considered for acceptance of tender. The contractor has to submit such
certificate showing P.F. code along with tender.
59.0 Effect and validity of Bid: The submission of any bid connected with these
documents and specification shall constitute on agreement that bidder shall have
no cause of action or claim against the owner for rejection of his bid. The owner
shall always be at liberty to reject or accept split any bid or bids at his sole
discretion and any action will not be called into question and the bidder shall have
no claim in that regards against the owner.
60.0 Recoveries:
In case of any damage to equipment/machinery or structure/building of GSECL or
any public property due to negligence’s of contractor or any other reasons
attributed to contractor the decision of E.I.C. regarding the amount of recovery
shall be final. If the contractor fails to execute the work as per direction of E.I.C.
within the time frame given GSECL shall get the work done through any other
contractor at the risk and cost of the contractor and the cost of execution of such
work along with 15% overhead charges shall be deducted from contractor monthly
bill over and above recovery as per rules.
61.0. The work is required to be completed in time limit from date of letter of
commencement. Hence the contractor should have sufficient financial Cash Flow.
No interest charges or any other expenses due to delay in payment etc. will be
given. The payment shall be released on the availability of funds with the
62.0. Contractor shall attend the meeting at GSECL's office at site, Office, or any other
place as fixed by the E.I.C as and when required for a review, discussion,
coordination etc. attending this meeting shall be obligatory on the part of the
contractor at no cost to GSECL.
63.0 No advance against mobilization, material, equipment & other matter etc., will be
64.0. The bidder shall furnish a complete bar chart showing dates of start and
completion of various activities keeping in mind the period of the completion of this
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
65.0 The tender that will have any conditional rebate shall be summarily rejected and
their rates will not be read out.
For & On Behalf Of GSECL
Addl. Chief Engineer(G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Pre-Qualifying Requirement
Sub: Work of various underwater services including underwater videography & photography of
TRC area, trash racks of upstream & downstream, draft tube tunnel and NDT(UT) inspection
of penstock gate at KHEP.
The bidders are requested to submit the technical bid with the following credentials for
technically qualifying criteria in soft.
Technical Qualifying Criteria
No. submission of
document in soft
01 1. The bidder should produce certificate/document/past work order
copies as evidence for experience of having successfully
completed similar work/jobs in last 7 years period in
government/semi government/state electricity board/ Hydropower
station in GSECL/NTPC/NHPC/other SEBs /corporation
body/reputed private firm/public limited company from the
publication of tender date should be either of the following.
Three completed similar works/jobs* costing not less than the
amount equal to 40% of the estimated cost.
Two completed similar works/jobs* costing not less than the
amount equal to 50% of the estimated cost.
One completed similar works/jobs* costing not less than the
amount equal to 80% of the estimated cost.
*Similar works/ jobs: work of Underwater diving for sealing, lifting or
lowering of Penstock gates/Draft Tube gates of Hydro Power Stations,
OR Underwater diving for sealing, lifting or lowering of Dam gates,
Canal gates OR Underwater diving for inspection, videography,
erection, cleaning, repairing etc.
02 Ensure for Unconditional tender on envelope of technical bid itself.
03 List of Tool & Tackle and Technical personnel & name of supervisor in
possession relevant to the job.
04 Documents of firm registration in case of proprietor firm OR documents
of registered partnership deed in case of partnership OR articles of
association and memorandum of association in case of company.
05 Validity for the offer must be for minimum 180 days from the tender
opening of technical bid.
06 Details of PF code number allotted.
07 Copy of group insurance of all contractor labour duly engaged
throughout the contract period.
08 Copy of contract labour license from the appropriate authorities duly
obtained and renewed for the entire contract period.
09 Copy of Bank solvency certificate about 20% of the estimated value of
any Nationalized Bank.(Not more than one year old)
10 Copy of money receipt of EMD paid.
11 The contractor shall have to submit the attested copy of INCOME TAX
PAN card.(Details of PAN No. from appropriate authority)
12 Party should have to submit the details of the registration numbers
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
regarding GST along with technical bid (i.e. Copy of GST Registration).
Non compliance of above criteria the technical bid is liable to be rejected. After acceptance of
the Technical Bid the Price Bid will be considered for opening.
Addl. Chief Engineer (G)
01 Each bidder / participant of these tenders shall quote only certain percentage of
rates above or below the total estimated rates. i.e. bidder / participant should
quote either say A% above the total estimate or B% below the total estimate of all
items. The bidder /participant should not quote different percentage for different
02 Registration of approved contractor of GSECL.
03 Bank solvency certificate of 20 % value of contract. (Not older than 01 year)
04 Copy of the latest income tax clearance certificate.
05 Details of the partnership deed in case if it is a partnership firm.
06 Contractor should approve all material before use and work should be done as
per instruction of EIC
1.1 TECHNICAL SERVICES
The technical services of the Contractor shall generally include amongst other the
1. Quality control and time schedule control of site work.
2. All coordination relating to insurance & claim settlement as per General
Condition of Contract, construction planning and scheduling and all other
services till handing over of the completed Project.
1.2 HANDING OVER OF SITE
Efforts will be made by the Owner to hand over the site to the Contractor free of
encumbrance. However, in case of any delay in handing over the site to the Contractor,
the Owner shall only consider suitable extension of time for the execution of the work. It
should be clearly understood that the owner shall not consider any other compensation
whatsoever viz. towards idleness of contractor’s labour, equipment etc.
1.3 APPROACH ROADS/HAULING ROADS
The Contractor shall make his own arrangement for approach/hauling roads to the work
site and within the work area for movement of men, material machinery, other equipments
etc. required for carrying out the work included under this contract as per specifications
and the rates quoted for various items under schedule of items & shall be inclusive of the
cost for preparation and maintenance of approach roads/haulage roads/access roads, etc
throughout contractual period.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
2.1 SAFETY MEASURES
The contractor shall ensure the safety of workers, material and structure including existing
structures during execution of the contract. Safety measures shall be followed during
operations of equipments/machinery being used. No separate payment shall be made for
the safety measures and the quoted rates shall include the cost for all safety measures.
2.2 SEQUENCE OF CONSTRUCTION AND TIME LIMIT
2.2.1 The total work shall be completed within time limit from the date of written
information to commence the work. The progress of the work will be reviewed time
to time to suit with the requirement.
2.2.2 Any activity not specifically mentioned in the tender but necessary in the opinion of
the EIC of the work, must be carried out for successful completion of job.
2.2.3 If due to any stoppages, or litigation / stay order etc. work is suspended then no
idle charges will be paid. Only suitable time limit extension will be granted based
on genuine reason but no extra claim will be entertained.
2.2.4 The contractor shall engage sufficient no of qualified engineers and trained
supervisors at site to look after the work on behalf of the agency. In no case, the
work shall be allowed to be continued without sufficient engineers/supervisors at
site. Due care shall be taken by the contractor in this regard.
2.2.5 During the working, all required government approvals/ permissions / NOC from
revenue department etc shall be obtained by the contractor at his own cost and
shall have to be furnished to GSECL from time to time.
2.2.6 Bidder shall submit quality plan and a construction bar chart including all activities
keeping in mind the period of completion time.
2.3.0 The overall co-ordination for all works specified in the Scope of Work will be the
responsibility of the contractor. The contractor shall also provide adequate
supervisory personnel for works to be executed under this Scope of Work.
2.3.1 Any clarification/queries asked by GSECL / GSECL's representative shall have to
be furnished by the contractor.
3.0 SPECIAL INSTRUCTIONS
3.1 The Contractor shall inspect the site and satisfy himself about the actual site
Conditions and collect all other information which is required by him before
tendering for the work.
3.2 The Contractor shall make all arrangements to build his own stores (covered and
uncovered, if necessary) for the proper storage of materials, maintain the stores
and all related documents and records, unloading, handling of the equipment and
materials. All security arrangements shall also be made by the Contractor.
3.3 Scope of work covers the construction and demolition of Civil Engineering
Components wherever required. Work shall be carried out as per specifications
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
3.4 All other works which are required to be completed as per terms of the contract are
also to be carried out by the Contractor at his own cost.
3.5 The Contractor shall provide all temporary ladders, scaffolding materials,
platforms, supports and other necessary facilities required for the work. The
Contractor shall provide sufficient, strong and safe staging so as to ensure safety
of the labourers. Contractor should submit detailed scheme of his working
methodology. Such scheme may be implemented only on approval. Contractor
should take all risk insurance policies.
3.6 The Contractor shall erect and maintain his own site offices, main stores and site
stores as required for the work as per approval of EIC and arrange for maintaining
the area placed at the Contractor's disposal in a neat manner. The plans for the
same shall be got approved by the E.I.C.
3.7 The Contractor shall provide sufficient fencing, notice Corporations and lights to
protect and warn others as may be considered necessary by the GSECL and
safety authority.
3.8 The Contractor shall be responsible for all the works in accordance with Technical
Specifications and schedule-B.
3.9 The Contractor shall deploy required number of supervisory, skilled unskilled and
auxiliary labour as required for the work and comply with such reasonable
instructions of the GSECL Engineer-in-Charge in the interest of satisfactory
progress and completion of the work according to the schedule. The Contractor
shall work in required numbers of shifts per day basis for meeting the completion
target, if required without any extra cost to GSECL. However, in such cases,
Contractor shall obtain the prior approval from the GSECL.
3.10 The Contractor shall organize the work in a manner that other work at site or plot is
not impeded and the workmen therein are not endangered and shall arrange
temporary access at site, if required for the execution of work.
3.11 All safety measures as required to be adopted as per the Statutory Regulations
and the Safety Rules of the Plant shall be strictly followed by the Contractor during
the execution of the Contract. The Contractor shall set up a suitable safety
organization of his own in this regard.
3.12 In connection with the execution of the Contract, the Contractor shall comply with
all applicable statutory Rules & Regulations including employment of labour at site.
3.13 The Contractor shall carry out any and all such works, as may be required, for civil
work to be completed in all respect as per the Contract Specification.
3.14 If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site,
he shall direct the Contractor to depute more numbers of supervisory personnel /
workers to meet the completion schedules as per the Contract. Upon receiving
such direction, Contractor shall deploy additional personnel within 7 days without
any extra cost.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
3.15 All guarantees and test certificates obtained by the Contractor for the materials to
be used, during the execution of work shall be submitted to the GSECL, Kadana
HEP before issue of Completion Certificate.
3.16 The GSECL may during the progress of work, order the removal of part or whole of
the work executed, found not in accordance with the approved drawings,
specifications/ instructions. No extra claims shall be entertained for re-executing or
altering of such work.
3.17 On completion of the work, the site shall be left in good order and the excess
materials, scraps, debris, if any shall be removed and dumped by the Contractor at
place/places as designated by the GSECL. The Contractor shall also dismantle
and remove the staging and other temporary facilities like stores, offices, labour
camp etc. on completion of work.
3.18 Contractor is required to maintain proper records at site of work in addition to
normal routine requirement of own office. The records to be maintained shall
include but not limited to the following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL’s officers.
(d) Test Registers of other materials/fittings, fixtures, equipments as stipulated in the
(e) Register of Drawings and Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each hindrance.
(h) Measurement Book.
4.0 MAINTENANCE:
4.1. The contractor for a period of Three Months (after the date of actual completion of
work, as certified by the Executive Engineer MMD) shall give the guarantee for the
work done. The contractor shall at his own expense, repair, rectify and make good
to the satisfaction of the Executive Engineer. All defects, imperfections shrinkage
or other faults arising from or out of use of materials or workmanship not in
accordance with the contract or from negligence or failure on the part of the
contractor to comply with the provisions of the contract.
5.0 COMPLETENESS:
Any technical services as set forth here in above and which might not have been
specifically mentioned in this Contract relating to the Project or in the specifications and
which are not expressly excluded therefore but which are necessary for the performance
in accordance with the specifications as an integral part of the Electrical works shall be
rendered by the Contractor without any extra cost.
6.0 CODES TO BE FOLLOWED:
All technical works / services to be rendered under this Contract, shall be executed in the
manner set out in this Contract and in accordance with the best trade/engineering
practices judged by the Indian and International Standards and its codes of practice.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Wherever the codes are not mentioned best International Standards shall be followed to
be approved by GSECL / Engineer in-Charge.
7.0 TOTAL RESPONSIBILITY:
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
Unless otherwise instructed, the contractor shall insure the works and keep them insured
until the virtual completion of the contract against loss or damage by fire and/or
earthquake, flood. The insurance must be placed with a company approved by the
GSECL, in the joint names of the GSECL and the contractor for such amount and for any
further sum if called to do so by the GSECL, the premium of such further sum being
allowed to the contractor as an authorized extra. The contractor shall deposit the policy
and receipt for premiums paid with the GSECL within 21 (twenty one) days from the date
of issue of work order unless otherwise instructed. In default of the contractor insuring as
provided above, the GSECL on his behalf may so insure and may deduct the premiums
paid from any money due, or which may become due to the contractor.
09. SPECIFICATION
The drawings accompanying the tender are indicative only and give the overall dimension
only. The scope of work shall not be deemed to have changed if Tenderers drawings do
not show some part of the work as called for in this specification and enclosed bid
sketches. Unless categorically agreed to in writing before the award of the contract,
Contractor shall not be entitled to any extra claim on account of his having misinterpreted
or misjudged or over looked any aspect called for in this specification.
The various works covered by this specification shall include the cost of supplying of all
10.0 TIME LIMIT
The time limit of this job contract (work order validity) is 18 months from the date of
commencement of work. The GSECL can extend contract on the same rates, terms and
conditions if desired by the GSECL without consent of party as per DOP of Corporation
The overall coordination for all works specified in the scope of work will be the
responsibility of the contractor. The contractor shall also provide adequate supervisory
personnel for works to be executed under his Scope of Work.
Any clarification/queries asked by GSECL / GSECL's representative shall have to be
furnished by the contractor.
Addl. Chief Engineer (G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
1. SPECIAL CONDITION.
2. PERFORMA OF BANK GAURANTEE FOR SD/PERFORMANCE.
3. ALL ANNEXURE.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
SPECIAL CONDITIONS
Following are the GSECL’s special conditions for this project and wherever these special
conditions contradict with similar conditions in this tender document, the following special
conditions shall prevail:
1.0 The successful Bidder, on receipt of Letter of Intent will submit to within a week’s time
his planning/programme of works to Addl. Chief Engineer, KHEP for scrutiny of Gujarat
State Electricity Corporation Ltd. in a Pert/Bar Chart format, clearly indicating GSECL’s
2.0 Contractor will plan his works such that on all the fronts released by GSECL,
simultaneous work should progress in such a way that entire job is completed in
scheduled time limit.
3.0 The work commencement date will start from the date of issue of letter to commence
4.0 The successful Bidder will have to depute his authorized representative to attend
progress review meetings to be held either at site or at GSECL’s Baroda Head
5.0 Security Deposit (5% of contract value) shall be payable by the contractor.
Alternatively entire 5% of contract value may be paid in form of Bank Guarantee within
ten (10) days of receipt of LOI. The Security Deposit in approved form of Bank
Guarantee valid during the contractual period shall be acceptable and Bank Guarantee
shall be of Nationalized Bank or IDBI, AXIS, HDFC & ICICI Bank only. However, such
Bank Guarantee should not be reduced on the basis of the work actually done and the
Bank Guarantee should be kept valid till the guarantee (maintenance) period is over.
6.0 The contractor will be responsible for complying with all rules and regulations and
labour laws applicable to him and the GSECL will not be responsible for any lapses
committed by them. If there is any claim from any Government Authority pertaining to
the contractor, the same amount will be deducted from the contractor’s bill.
7.0 Normally one measured R.A. Bill payment shall be made every month on submission
of bill by the contractor in GSECL’s prescribed format.
8.0 The Engineer may without prejudice to any other method of recovery, deduct the
amount of such damages from any money due or which may become due to the
Contractor. In the event of extension of time being granted by the Engineer, in writing,
for completion of work, this penalty clause will be applicable after the expiry of such
extension period.
9.0 Earnest money deposit shall be paid in D.D. on any Nationalized Bank and IDBI, AXIS,
Kotak Mahindra, HDFC, BOB & ICICI Bank in favour of Gujarat State Electricity
Corporation Ltd.
10.0 The contractor’s rates should be firm and no variation clause is to be quoted by the
contractors and GSECL will not accept the same, during contractual period including
extended time limit if any.
11.0 THE GSECL WILL NOT PAY ANY TYPE OF ADVANCES INCLUDING
MOBILISATION ADVANCE.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
EMD BANK GUARANTEE FORMAT
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300/-)
WHEREAS M/s. _________________________________________(Name and Address of the Firm) having
their registered Office_____________________________ (Address of the Firm’s registered Office)
(hereinafter called the Tenderer) wish to participate in the Tender
No.____________________for_______________________________ of (supply / Erection / Supply
&Erection / Work) of ________________________________(Name of the material / equipment / work) for
_________________________ Gujarat State Electricity Corporation Limited and WHEREAS a Bank
Guarantee for(hereinafter called the “Beneficiary”) Rs. _____________ (Amount of EMD)valid till
____________ (mention here date of validity of this Guarantee which will be 4 (FOUR) months beyond
initial validity of Tender’s offer) which is required to be submitted by the Tenderer along with the
the Branch giving the Bank Guarantee)having our registered Office at _____________________
(Address of Bank’s registered Office) hereby give this Bank Guarantee No. _________________dated
____________ and hereby agree unequivocally and unconditionally to pay immediately on demand in
writing from the Gujarat State Electricity Corporation Limited or any Officer authorized by it in this
behalf any amount not exceeding Rs.____________ (amount of EMD) (Rupees
______________________________________________________) (in words) to the said Gujarat State
Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-submission of
Security Deposit by the Tenderer within one month from the date of tender or a part thereof has been
accepted by the Gujarat State Electricity Corporation Limited would constitute a default on the part of
the Tenderer and that this Bank Guarantee is liable to be invoked and encashed within its validity by the
Beneficiary in case of any occurrence of a default on the part of the Tenderer and that the encashed
amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of____________________
(mention here the date of validity of Bank Guarantee)and shall not be terminated by notice or by
Guarantor change in the constitution of the Bank or the Firm of Tenderer or by any reason whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or variations or
alterations made, given, conceded with or without our knowledge or consent by or between the Tenderer
and the Gujarat State Electricity Corporation Limited.
“Not withstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL). Notice or
invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by
the Bank. Any invocation of the Guarantee can be made by the beneficiary directly”. In case of
lodgement of claim for invocation of Bank Guarantee, the said Bank Guarantee can be presented
at the local Branch of the issuing Bank. For invocation of BG, a written application from the
GSECL is sufficient for Lodgement of claim.
NOT WITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted
________________________________________________ (in words). Our Guarantee shall remain in
force till _____________ (date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before ___________ (date should be 1 month after the
above validity period of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and
we shall be released and discharged from all liabilities there under.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Please Mention here Complete Postal Signature of the
Address of the Bank with Branch Bank's Authorized Signatory
Code, Telephone and Fax Nos. with Official Round Seal.
Guarantee Issued by following banks will be accepted as EMD on permanent basis:
All Nationalized Banks including the Public Sector Bank - IDBI Ltd.
Guarantees issued by following banks will be accepted as EMD for period up to March 31,
The validity cut-off date in GR is with respect to date of issue of Bank Guarantee irrespective of
date of termination of Bank Guarantee.
All the eligible banks are instructed to collect the original documents/ papers of guarantee from
the concerned tendering authority.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit / Performance Guarantees (PG) for supply/contract period as per
Commercial Terms and Conditions of Tender)
__________________________ hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not exceeding
Rs._______________ (in words)
said Gujarat State Electricity Corporation Limited on behalf of
into a contract for the supply / works specified below:
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________ and shall not be terminable by notice or by change in the
constitution of the Bank or the firm of Contractors / Suppliers or by any other reason
whatsoever and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given conceded or agreed, with or
without our knowledge or consent, by or between parties to the said within written
“Not withstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made by the beneficiary directly”. In case of lodgement of claim for invocation of
Bank Guarantee, the said Bank Guarantee can be presented at the local Branch of
the issuing Bank. For invocation of BG, a written application from the GSECL is
sufficient for Lodgements of claim
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is restricted to
Our guarantee shall remain in force until _______________ (date of validity of the
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in
writing on or before _____________ (date should be 1 month after the above validity
period of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and
we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the
Address of the Bank with Branch Bank's Authorized Signatory
Code, Telephone and Fax Nos. with Official Round Seal.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Guarantee Issued by following banks will be accepted as SD on permanent basis:
All Nationalized Banks including the Public Sector Bank - IDBI Ltd.
Guarantees issued by following banks will be accepted as SD for period up to March
31, 2026. The validity cut-off date in GR is with respect to date of issue of Bank
Guarantee irrespective of date of termination of Bank Guarantee.
All the eligible banks are instructed to collect the original documents/ papers of
guarantee from the concerned tendering authority.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Performance Guarantees (PG) for Guarantee/Warrantee period
as per Commercial Terms and Conditions of Tender)
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited, or any Officer authorized by it in this behalf
any amount up to and not exceeding Rs.__________ (in words) Rupees
___________________________________to the said Gujarat State Electricity
Corporation Limited on behalf of M/s.____________________________ who have
entered into a contract for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________ and shall not be terminable by notice or by change in the
constitution of the Bank or the firm of Contractors / Suppliers or by any other reason
whatsoever and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given conceded or agreed, with or
without our knowledge or consent, by or between parties to the said within written
“Not withstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made by the beneficiary directly”. In case of lodgement of claim for invocation of
Bank Guarantee, the said Bank Guarantee can be presented at the local Branch of
the issuing Bank. For invocation of BG, a written application from the GSECL is
sufficient for Lodgement of claim"
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs.______________(Rupees
_________________________________________only). Our guarantee shall remain in
force until _______________ (date should be 1 month after the above validity period
of BG).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (date of validity of the Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released and discharged from
all liabilities there under:
Please Mention here Complete Postal Signature of the
Address of the Bank with Branch Bank's Authorized Signatory
Code, Telephone and Fax Nos. with Official Round Seal.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Guarantee Issued by following banks will be accepted as PBG on permanent basis:
1. All Nationalized Banks including the Public Sector Bank - IDBI Ltd.
Guarantees issued by following banks will be accepted as PBG for period up to March
2026. The validity cut-off date in GR is with respect to date of issue of Bank Guarantee
irrespective of date of termination of Bank Guarantee.
All the eligible banks are instructed to collect the original documents/ papers of guarantee from
the concerned tendering authority.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
TENDER AND CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein referred as “GSECL”)
of the work specified in the under written memorandum within the time specified Schedule B
(Memorandum showing items of work to be carried out) and in accordance, in all respect, with
the specifications, design, drawings and instructions in writing and as per annexed conditions of
contract and agree that when the materials for works are provided by the GSECL such materials
and rates to be paid for them shall be as provided in Schedule A hereto.
a) General Description of Work :
b) Estimated Cost :
c) Earnest Money :
d) Security Deposit :
(1) Alternatively if desired by contractor, by bank guarantee of Nationalized/
IDBI,AXIS,HDFC,ICICI banks only, for 5% of the contract amount
e) Time allowed for the completion of work from date of written order to commence.
Should this tender be accepted I / We hereby agree to abide by and fulfill all the terms and
provisions of the conditions of contract annexed hereto as applicable and in default thereof forfeit
and pay to the GSECL the sums of money mentioned in the said conditions.
Receipt No.___________ Date _____________ from the Gujarat State Electricity Corporation
Ltd. in respect of the sum of Rs.__________________________ (Rupees
specified in figures and words) is herewith forwarded representing the earnest money (the full
value of which is to be absolutely forfeited to the GSECL should I/We not deposit the full amount
of security deposit specified in above memorandum in accordance with clause-(d). Security
Deposit of the said conditions / otherwise the said sum of Rs______________ shall be refunded
on surrendering the original receipt, in case of non-awardance of contact.
Signature of the contractor
Address of the contractor
Signature of Witness
Address of Witness
Dated ______________ day of ___________ year
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity Corporation
Ltd. Addl.Chief Engineer or his duly authorized assistant.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
To create an environment where Business Confidence is built through Best Business Practices
and in fostered in an atmosphere of trust and respect between providers of goods and services
and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical standards in Not to bring pressure recommendations
business and professions. from outside GSECL to influence its
Ensure maximum transparency to the Not to use intimidation, threat, inducement
satisfaction of stakeholders. or pressure of any kind on GSECL or any of
it’s employees under any circumstances.
To ensure to fulfill the terms of agreement/ To be prompt and reasonable in fulfilling the
contract and to consider objectively the contract, agreement, legal obligations.
viewpoint of parties.
To ensure regular and timely release of To provide goods and / or services timely
payments on due dates for work done. as per agreed quality and specifications at
minimum cost to GSECL.
To ensure that no improper is made by To abide by the general discipline to be
employees or by anyone on our behalf. maintained on our dealings.
To give maximum possible assistance to all To be true and honest in furnishing
the Vendors/ Suppliers/ Service Provider information.
and other to enable them to complete the
contract in time.
To provide all information to suppliers/ Not to divulge any information, business
contractors relating to contract/ job which details available during the courses of
facilities him to complete the contract/ job business relationship to other without the
successfully in time. written consent of GSECL.
To ensure minimum hurdles to vendors/ Not to enter into carter/ syndicate/
suppliers/ contractors in completion of understanding whether formal/ non-formal
agreement/ contract/ work order. so as to influence the price.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
ON FIRM’S LETTER HEAD
CERTIFY THAT M/S _______________________________________ IS NOT RELATED WITH
OTHER FIRMS WHO HAVE SUBMITTED TENDERS FOR THE SAME WORK UNDER THIS
SEAL OF THE FIRM SIGNATURE OF THE
PLACE: WITH DESIGNATION
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Sr. Details Confirmation
No. (Tick √ any one)
01 Annexure – 2 YES / NO
02 Firm’s details as per “Annexure –3” YES / NO
03 Copy of the un-priced schedule (Description and quantity of YES / NO
04 Work Completion Period as per “Annexure- 5” YES / NO
05 Past experience details as per “Annexure-6” YES / NO
06 Performance certificates as per “Annexure-7” YES / NO
07 ANNEXURE – 8 YES / NO
08 ANNEXURE – 9 YES / NO
09 ANNEXURE – 10 YES / NO
10 ANNEXURE – 11 YES / NO
11 ANNEXURE – 12 YES / NO
12 Certificate of Important Instruction & certificate-A YES / NO
13 INTEGRITY PACT YES / NO
I / WE, confirm that following documents are attached with the technical bid of the offer.
Seal of the Firm
Date: Signature of the Tenderer
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE GIVEN
FLAG MARKING FOR IDENTIFICATION
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Reference: Tender enquiry No.
Due on date: / /
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Scope of Work & requirements
during execution of work in tender mentioned under reference along with the Commercial
terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender
specifications/work.
3. Further, I / We also agree that additional conditions / deviations, if any, found in the
Commercial terms & conditions, our offer shall be out rightly rejected without assigning
any reason thereof.
4. We hereby agree for the terms & conditions laid down in Tender.
All the bidders are requested to see and verify the documents of a) General safety rules /
norms” to be observed by the contractors b) Additional terms and conditions regarding
industrial law and other related matters for the tender documents.
c) General rules and directions for the guidance of contractor booklet of GSECL on our
website under heading of “Rules for Works”
And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules, Industrial
Laws and Contract Booklet (a, b & c as above) and accordingly submitted
Signature of the Authorized
Representatives of the firm
Seal of the Firm
Name of the Tendering Firm / Agency:
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
UN – PRICED SCHEDULE (COPY WITHOUT PRICES)
Sr. Details of the Items / Equipments Quantity Firm’s Per Annum Production
No. Offered Offered Capacity for the offered item
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
WORK COMPLETION PERIOD
The contractor shall construct the whole of the works and hand them over to the GSECL on or
before the date specified in the "Special Conditions" and save as herein provided, in no
circumstances whatever shall extend or alter the date for the completion of works. Provided
always that if in the opinion of the Engineer the completion of the works shall be delayed by any
change of original design or by the order of the Engineer, of any altered, modified substituted or
additional works or materials omitted or by strikes, lock outs or stoppages of labour, or resolution,
riots, civil or political disturbance or by causes directly due to war or by the contractor not being
given possession of the site or any part thereof or by the GSECL taking possession of and using
the site or any part thereof or the works or any part thereof, whether any non performance of
work under the powers herein contained or otherwise or by any non performance of work or non
supply of materials to be performed or supplied by the GSECL or by the contractor not receiving
any orders, drawings, instructions or directions in time or by the suspensions of the works or by
fire, flood exceptionally bad weather tempest, storm, or by from unforeseen circumstances (and
whether the same shall be due to any act or omission of the GSECL or its agents or those in their
respective service or not) the Engineer may, if in his unfettered discretion, he thinks fit either
forthwith or at any later time and from time to time not withstanding that the prescribed or
extended time for completion has expired or that the work have been completed, by writing under
his hand, extend the time for the completion of the works to such date as he shall appoint.
Provided always that unless the contractor makes a written application to the Engineer within one
month of the cause of delay and unless the time is extended by the Engineer, the prescribed time
shall not be extended notwithstanding delays from the aforesaid foregoing or any other causes of
whatsoever kind.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
DETAILS OF THE EXPERIENCE FOR SIMILAR TYPE OF ITEMS IN LAST FIVE
YEARS FROM THE DUE DATE OF TENDER:
ORDER STATUS, IF
Sr. FULLY ORDER
SUPPLIED REFERENCE ITEMS QUANTITY REMARKS
No. EXECUTED. UNDER
YES/NO EXECUTION
A GUJARAT ELECTRICITY BOARD/GUJARAT STATE ELECTRICITY CORPORATION LTD:
B OTHER STATE ELECTRICITY BOARDS:
C PRIVATE FIRMS:
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
LIST OF PERFORMANCE CERTIFICATES SUBMITTED WITH THE TECHNICAL BID.
Party should submit below executed Work Performance Certificate physically along
with the Technical Bid.
Sr. Name of the Authority by Reference No. & Details of Works
No. whom certificate is issued date
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Bidder must fill up below details & should place at the top of the Technical Bid.
01 PRICES: [FIRM ONLY] (Please Specify YES / NO.)
02 GST : [IN PERCENTAGE]
03 Please quote your valid Bank Solvency certificate (not more
than 01 year old) Details (No. & Date) for 20% value, of the
estimated cost. (A copy of Bank Solvency Certificate is to
be Submitted physically along with the Technical Bid.)
04 Please quote your Service Tax Registration No. (Also
physical Document is required along with the tech. Bid)
05 Please quote your PF Registration No. & Date. (Also
physical Document is required along with the tech. Bid)
06 Please quote your Labour License Number. (Also
physical Document is required along with the tech. Bid)
07 PENALTY TERMS AGREED :
(Please Specify YES / NO.)
08 SECURITY TERMS AGREED:
(Please Specify YES / NO.)
09 P.G TERMS AGREED (Wherever applicable):
(P.G. - Performance Guarantee)
(Please Specify YES / NO.)
10 DETAILS OF EMD PAYMENT (if applicable as below)
a) DD No., Date & Name of Bank
b) B.G No., Date & Name of Bank
11 Completion of Works
(Please Specify YES / NO.)
13 VALIDITY OF THE OFFER AGREED:
(Please Specify YES / NO.)
14PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
14 WORK OFFERED AS PER SCHEDULE-B: (YES/NO)
15 TELEPHONE NOS. & FAX NO:
16 Authorized person of the firm :
17 Name of the proprietor, partners, directors [as the case
may be], along with address, telephone, fax no. etc.
18 If Vendor Registration is Done: (If Applicable)
(Please submit copy of Vendor Registration approval
letter in the EMD cover).
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
TECHNICAL DEVIATIONS IF ANY TO BE FURNISHED IN THIS ANNEXURE ONLY AND TO
BE SUBMITTED WITH TECHNICAL BID.
1. GSECL does not bind to accept the deviation offered by bidder for evaluation of tender.
2. If there is any deviation from bidder, it should be clearly mentioned on this page.
3. Deviation mentioned on other page should not be considered and order will be placed according to
the tender documents.
4. If there is no any deviation from bidder, than it must be clearly mentioned in this page “NO
DEVIATION OFFERRED”
Signature of the
Contractor With seal
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(Bidder should not quote their prices in this page)
Sub: Undertaking in regard to quoted prices.
All bidders will have to furnish the following undertaking duly filled in, signed and stamped for “This is to
certify that we have not worked for the subjected tender viz.…………………. to other SEBs / Power
Utilities with this tender details of GSECL at lower % price than the % prices quoted in this tender by us
for the same item during last Six (6) Months.”
The prices quoted by us for the same item to other SEBs during the last six (6) months are given below:
Signature of the Tenderer
Seal of the Firm
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(Undertaking In Regard to Stop Deal)
Undertaking In Regard to Stop Deal/ Black List Thereof
All bidders will have to furnish the following undertaking duly filled in, signed and stamped for each
quoted item of the tender along with the Technical Bid.
I/We, a authorized signatory of our Company (Bidder) here by certify that our company (Bidder) is not
stop deal / black listed by GUVNL and or therein ay subsidiary company viz. GSECL / GETCO / DGVCL
/ MGVCL / UGVCL / PGVCL for tendered item or any Government sector (Confirmed / not confirmed)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Bidder should submit following documents physically along with technical
Bid. Also confirm the same in this annexure.
Sr. Details Confirmation
No. (Tick √ any one)
01 Demand Draft for EMD+ Tender fee YES / NO
02 Attested copy of Registration Certificates enlisted with, Govt. YES / NO
Govt., etc., as stated in Tender Notice. Joint Venture is not
03 Attested copy of work experience certificate for the similar nature YES / NO
magnitude of works executed as per requirement in qualification
04 List of works in progress YES / NO
05 Attested copy of document showing “Provident Fund Number in YES / NO
Company’s name” obtained by the bidder
06 Attested copy of Company Registration or Partnership Deed YES / NO
07 Attested copy of Power of Attorney, if any for signing the bid YES / NO
08 Attested copy of Balance Sheet of Profit & Loss account of last 3 YES / NO
financial years duly audited by Chartered Accountant
09 Attested copy of latest Solvency Certificate issued by Nationalized YES / NO
bank OR IDBI, AXIS, HDFC, ICICI bank , the Kalupur Commercial
Cooperative Bank Ltd (Not older than one year)
10 Details of equipment, tools & plant immediately available with the YES / NO
tenderer for use of this work
11 Details of technical personnel YES / NO
12 Tender document (except Schedule –B) duly signed YES / NO
13 Attested copy of PAN Card YES / NO
14 Attested copy of GST Registration. YES / NO
I / WE, confirm that following documents are attached with the technical bid of the offer.
Signature of the Tenderer
Seal of the Firm
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE GIVEN FLAG
MARKING FOR IDENTIFICATION.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
IMPORTANT INSTRUCTIONS
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in accordance with the GSECL’s
Work Tender specifications and as per Technical detail work/ drawing as mentioned in the Tender
Specifications. There is no commercial or Technical deviation in the offer from the Corporation’s
Tender Specification. I undertake to abide by the GSECL’s tender description and Particulars. I
undertake to complete work strictly as per the GSECL’s Technical specification/ Scope of work/
Guaranteed Technical Particulars / Drawing, even if any technical deviations are mentioned by me. I
also undertake to abide by all commercial conditions of the GSECL, including work completion
(Signature of the Tenderer)
2. Any offer without above certificate will not be considered and the tender will be out rightly
Ignored in the absence of above certificate.
3. After opening of the Tender, if it is found that the offer given by the Tenderer is not according to the
GSECL’s specifications, Guaranteed Technical Specifications/ Scope of work, Drawing and commercial
terms and conditions and false certificate is given by the Tenderer, then GSECL will not deal with the
firm for the present Tender. It is, therefore requested that the Tenderer should take care in giving their
offer and submission of
4. The conditional tenders will not be accepted.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Genearal terms and Condition of Contract
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Sub: “Work of various underwater services including underwater videography & photography of TRC
area, trash racks of upstream & downstream, draft tube tunnel and NDT (UT) inspection of
penstock gate at KHEP.”
[SCOPE OF WORK]
The details of hydroelectric project are as under:
(A) – Total height of dam is 131.4 mtr working floor
- Total depth of water is @ 30 mtr from 127.7 mtr Dam height
- The total grills upstream side unit no.1 to 4 = 36 nos.
(B) - Total height of TRC is 115 mtr working floor
- Total depth of water is @ 30 mtr from 85 mtr TRC height
- The total grills downstream side unit no.1 to 4 = 32 nos.
Weight of grills -------2 tonnes
Scope of works for underwater videography & photography.
(1) Underwater videography & photography of TRC on downstream & trash rack of unit no.1,2,3 &
a. Total height of top of TRC from bottom of TRC is 57.8 mtr.
b. Width of TRC is 100 mtr approx.
c. Depth of water in TRC is 23.8 mtr.
d. No. of trash rack per unit is 4x2=8 Nos per unit & total 32 nos trash rack for all units.
e. Inspection & videography of TRC area approx. 10 mtr from the bottom of downstream for
the deposit of silt, foreign material, stone etc.
(2) Underwater videography & photography of upstream & inlet trash rack of unit no.1, 2, 3 &
a. 36 nos of trash racks for all units..
b. Depth of water is 22.36 mtr.
c. Total height from top of dam to bottom of inlet trash racks is 29.3 mtr.
(3) Under water videography of complete draft tube tunnel of unit 1 along with TRC area & trash
racks of upstream & downstream of Unit no.1 to 4 as per above scope of work.
(4) Required material & man power along with all required instrument & equipment like Boat,
Floating pontoon, D-Shackle, ladder etc. & hydra crane is to be arranged by party.
(5) Required medically fit & trained divers, dive spares with other consumables and special tools will
be in scope of party.
(6) Party will have to engage their manpower from 8:00 to 17:00 to complete the job in time or as
per EIC instruction and as per site clearance in a day time.
(7) Party shall have to report to EIC before starting the work. The qualified skill supervisor needs to
be available at site during the entire work to supervise the job.
(8) Party shall have to arrange all safety apparatus like safety belt, helmet, mask, PPE etc. for the
subjected work. Necessary safety precautions are to be taken for safety of working person.
(9) Party shall have to submit the relevant document of Divers for Diving i.e. certificate of fitness,
insurance and Training availed certificate from government Authorized Organization.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(10) Party has to submit for assessment of work for underwater cleaning of stone, big gravel, iron
piece plate, wooden piece & rod and any other foreign material laying near downstream trash
rack, inside grill iron plate etc. & cleaning of surrounding area of downstream trash rack with
mtr area from the bottom of TRC towards the downstream side.
(11) Party has to submit for assessment of work for condition of all trash racks/grills for
repairing/replacement.
(12) Party has to carry out Underwater NDT (UT) inspection with videography & photography of
penstock gate of Unit.1 with all necessary required NDT tools and arrangement.
(13) After Underwater videography & assessment of works, party has to submit the two copies of pen
drive & work assessment report to ACE KHEP.
Party may visit the site at KHEP before work commencement in normal duty working hours, if
SPECIAL TERMS & CONDITIONS
1. Contractor shall have to take all precautionary measures by providing safety appliance to their workers
working in the plant area as per Factory Acts. Contractor shall comply with the Safety Laws in force and
amended from time to time.
2. Necessary tools and tackles required to carry out the job shall be arranged by the contractor at their
3. Work should be carried out according to the specification & instruction of Engineer in charge.
4. Electricity required for lighting purpose will treated as non-chargeable and provided at one point only.
5. Crediting the balance material and scrap in the main store is also a part and portion of the job.
6. Contractor shall also in harmony with MMD staff and operation staff and try to avoid unnecessary
disputes and delays to maintain healthy atmosphere.
7. While of the work is to be executed under direct supervision of GSECL Engineers and as per their
instruction work is also to be completed within stipulated time period, otherwise penalty will be levied as
per GSECL rules.
8. Contractor has to be providing a labour license, P.F. No. of labour engaged by them and insurance of
9. The Work Executions and its Requirements are to be intimated on Phone by EIC and Party has to
reach the Site at immediately along with Men & Materials failing to which the Penalty will be imposed as
per Decision of Competent Authority.
10. Penalty Clause:- The time is essence of the contract and the party shall have to ensure that work is
completed within stipulated time period, in the contract, keeping personnel round the clock as per
quantity of work otherwise penalty shall be charged @ 0.5% per week or part thereof plus GST as
applicable subject to ceiling of 10% plus GST as applicable of the contract value (End cost with GST
and cess as applicable.) The ceiling shall be with reference to total contract value with GST and cess
as applicable of work. For calculating the delayed portion date of work completion mentioned in work
completion certificate shall be considered.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
11. Agreement & indemnity bond: - For fulfilment of all the Labour laws, liabilities before starting of the
contract work, contractor should give the assurance/Agreement indemnity bond on non-judicial stamp
paper of Rs. 300/- to GSECL or as per standard format.
12. Validity of contract: - The time limit of this job contract (work order validity) is 18 months from the date
of commencement of work. The GSECL can extend contract on the same rates, terms and conditions if
desired by the GSECL without consent of party as per DOP of Corporation.
Time limit: - Party has to complete the allotted work within 45 days.
Addl. Chief Engineer (G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Subject: Work of various underwater services including underwater videography &
photography of TRC area, trash racks of upstream & downstream, draft tube
tunnel and NDT (UT) inspection of penstock gate at KHEP .
SR.NO DESCRIPTION QTY UNIT
Underwater videography & photography of TRC area & trash racks
of upstream & downstream of Unit No.1 to
2 Underwater videography & photography of draft tube tunnel of Unit.1 01 Job
Underwater NDT(UT) inspection with videography & photography of
penstock gate of Unit.1
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Sub:- Approval for “Work of various underwater services including underwater videography &
photography of TRC area, trash racks of upstream & downstream, draft tube tunnel and NDT
(UT) inspection of penstock gate at KHEP.”
1. SECURITY DEPOSIT: It is mandatory to submit security deposit before order placement. Party shall
have to pay security deposit of 5% of contract value within 10 days from the date of Letter of Intent.
Such Security Deposit will be payable either in D.D. / Bank Guarantees. Bank Guarantees from
Scheduled / Nationalized Banks will be acceptable if the amount of security deposit payable exceed
Rs. 5,000/- The Bank Guarantees will be executed on the standard form prescribed by the
corporation. In case of the Bank Guarantees furnished / submitted, they should have clear one time
validity till the completion of the order in all respects and up to the expiry of Guarantee period from
the date of the work completion. Bank Guarantee for Interim period will not be allowed. If by any
reasons the work period is extended then contractor should undertake to renew the Bank Guarantee
at least one month before the expiry of the validity failing which GSECL will be at liberty to encase
If the full Security Deposit amount is not paid immediately after the receipt of the Letter of Intent,
then the order will not be placed (at the discretion of GSECL) and without entering into any
correspondences and this will be binding on the Tenderer.
If the Tenderer fails to pay the Security Deposit or defaults in execution of the orders placed or if
GSECL suffers any financial loss due to this, the GSECL will be at liberty to adjust the amount from
other orders of the same firm or by encasing the Bank Guarantee.
Failure to deposit the SD will entail for failure of EMD and the contract shall be treated as
terminated. You shall not be, allowed to start the work if, SD is not paid. Any loss to the GSECL due
to late start of work because of late payment of SD shall be contractor’s liability.
2. GUARANTEE CLAUSE: The firm shall offer a guarantee for a period of Three months from the
date of completion of work towards poor workmanship. The amount of SD so deposited by the firm
above shall be retained by Company till completion of guarantee period, as performance
3. INCOME TAX: Income tax will be recovered as per Govt. rules.
4. OVER RUN CHARGES: No payment against over run/idle charges/labour escalation will be made
in any circumstances.
5. a) CPF: The contractor & his sub-contractors if any shall be required to deduct the
CPF and its documentary evidence to be submitted along with the final bills as per prevailing CPF
law and rules & regulations.
b) INSURANCE & WORKMAN COMPENSATION: The contractor and his sub
contractors if any shall be required to insure his worker under compensation Act. He will also be
required to follow the provision of the factories act and obtain license whenever necessary. In very case
if any virtue of the provisions of section-I sub-Section-II of the workmen's compensation act, 1953, the
Company is obliged to pay compensation to a workman employed by the contractor in execution of the
work, the Company will recover from the contractor the amount of the right of the Company, under
section 2, sub-section.1 of the said act. The Company shall be at liberty to recover such amount of any
part thereof by deducting it from the security deposit or from any sum due by the Company is the
contractor whether under this contract of otherwise, Company shall not be bound to contents any claim
made against under section-12, sub-section-1 of the said Act, except on the written request of the
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
contractor and upon his giving to the Company full security for all costs.
For which the Company might become liable in consequence of contesting such claims. In case of any
legal complication arising on account of contractor or his labour and legal suit is filed by any inspecting
agency, it will be in contractor's account.
The Company shall not be liable in any manner whatsoever, to the contractor or his worker in respect of
any losses damaged suffered while working in the powerhouse premises. The whole responsibility shall
be of the contractor.
6. WORK FORCE: In order to complete the work in time, it is desired that tenderer shall provide
adequate unskilled and skilled workers, supervisors and engineer.
7. WORKMANSHIP: During commissioning, all the defects observed shall be attended on top priority
without any charges by the tenderer. The tendered shall be that any major defect attributed for bad
workmanship during guarantee period shall be attended free of all charges to the entire satisfaction
8. VISIT TO WORK SITE: The tenderers are free to assess the scope of work by actual visit to work
site if desired.
9. DISPUTE: In case any dispute or discrepancy, the decision of SE (KHEP) will be final and binding
to the contractor
10. All the work shall be carried out as per the instruction of GSECL Engineer-in-charge or his
representatives. GSECL Engineer's decision regarding the correctness of the work and method of
working shall be final and binding to the contractor.
11. The contractor has to coordinate & cooperate with other working agencies so as to get the work
done in prescribed time limit.
12. GSECL'S RIGHT TO ACCEPT DOCUMENTS: GSECL reserves right to award full item or part
thereof or reject any item or all the items of the tender without assigning any reason thereof which
is considered advantage to the GSECL.
13. ENGINEER-IN-CHARGE: The Executive Engineer, MMD, GSECL-KHEP shall be Engineer-in-
charge for the works.
14. Party should take all necessary precautions during execution of the work and all manpower of the
party should utilize all types of safety appliances during work in plant area to prevent the accident as
per factory acts / rules.
15. The labour laws in existence and which may modify from time to time shall be binding to the party.
Contractors have to full fill all the statutory requirements as per existing/modify labour laws in
Consultation with IRO/LWO/AS with all legal aspects. The party will have to execute an indemnify
bond on non judicial stamp paper of appropriate value. The cost of the same shall be borne by the
16. Rates are quoted to be firmed. Hence no price and labour escalation will be applicable.
17. The contractor has to make wages payment to the contract labor engaged by him in this activity
through bank account only.
18. It is the sole responsibility of contractor during accident to pay compensation or damage to the
person of the contractor involve in accident as per law or Act.
19. All the required safety precaution for manpower & security precaution for equipment for
equipments, materials etc will have to be taken by contractor for the work. The safety norms are to
be strictly followed during execution of work. However ay isolation or PTW will be arrange by
GSECL where require, GSECL will not be responsible for any accident or compensation.
20. Submission of Statutory documents to ensure the compliances:
The contractor shall have to submit following statutory documents under the labour laws and EPF
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
to the EIC for ensuring the compliances of provision of labour laws and EPF Act.
Copy of attendance register – with name & address of establishment, name of work and site (duly
signed & stamp by contractor) – Form XVI.
Copy of wage payment sheet – with signature of workmen, duly signed & stamped by contractor –
Copy of bank statement of wage payment (duly signed & stamped by concern bank)
Copy of PF challan along with ECR statement.
Copy of gate pass permission (duly signed by authorities)
Copy of valid W.C. policy
Copy of valid labour license (if applicable in case of more than 9 manpower engaged by contractor for
Form No. XIII – Register of workers employed by contractor.
RA Bill shall not be processed without receipt of above mentioned documents by EIC.
Addl. Chief Engineer (G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GENERAL CONDITION AT CONTRACT.
GENERAL TERMS & CONDITIONS:
1. The Contractor has to visit the Site and familiarized themselves thoroughly with the Site Conditions,
Equipments and Systems before submitting the Tender. For Site Visit, the Tenderers may contact
Engineer in Charge of Site Office with Permission of undersigned on any Working Day during
Working Hours before submitting the Tender.
2. The Materials, Design and Workmanship shall satisfy the relevant Indian Standard. The Job
Specification contained herein and Code referred to where the join Specification Stipulate
Requirements in addition to these contained in the Standard Code and Specifications, these
Additional Requirements shall be satisfied.
3. Contractor shall comply with the Factory Acts, Labour Laws and Safety Laws in force and amended
from time to time.
4. Any other Rules and Regulations, Conditions etc. that are in force at present and that may be
framed by the GSECL from time to time in connection with the Contracts will be binding and
acceptable to the Contractor.
5. For Shifting / Lifting / Transportation of Materials should be arranged by the Contractor at their cost.
6. Whenever Contractor brings Material from Outside the P/H Premises, he must get an Entry Pass
Separate for Tools / Tackles / Machinery and Consumable Items and he should produce One Copy
of Such Entry Pass to Concern Department for their Verifications / Records.
7. If any Fatal / Non Fatal Accident or Occurrence happens, Corporation is not responsible for any kind
of Legal Liabilities and Workmen Compensation; only the Contractual Party is responsible for Legal
Compliance and any Compensation thereof.
8. Party shall submit Material Account along with Bills in Triplicate.
9. Payment will be made for Actual Work Done only.
10. GSECL will try to give Residential Accommodation on Chargeable Basis as per Rules to the
possible extent depending upon the Availability. But there will not be the Right of Contractor. The
Quarter is to be vacated immediately as soon as the Work is completed satisfactorily. Contractor
shall make their Own Full Proof Arrangement of Storage of Spares / Consumables, Tools Tackles,
etc. required for O/H & Works and shall be responsible for Safe Custody of Such Items at their Site /
Store. In case of Theft / Lost / Damage of Such Items while in possession of Contractor, Such
Materials are to be replaced Free of Cost by the Contractor to the GSECL.
11. Subletting the Contract to other Agency is not permitted unless and otherwise approved by the
Competent Authority.
12. For any Ambiguity and Conflict, the Decision of the Addl Chief Engineer (Gen), GSECL, KHEP shall
be final and binding to the Contractor.
13. The GSECL reserves the Right to terminate the Contract at any Time without giving Notice of
Termination or any Reason and entertaining of Claims / Compensations.
14. The contractor shall have to execute Agreement on stamp paper of Rs.300/- and indemnity bond on
stamp paper of Rs.300/- in the prescribed form before commencement of the work. The cost of the
stamp papers shall be borne by contractor.
15. All repairing works are to be carried out at premises of agency & out of KHEP area.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GENERAL CONDITION OF CONTRACT
The following are the major obligations to be fulfilled by the Contractors as per the Contract Labor
(R&A) Act 1970 and rule mentioned there under:
1) The contractors shall have to obtain group insurance under WC Act before starting the work.
2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by them,
on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably situated
in the premises of KHEP area in case of ARC /BRC works Contract. The Contractor shall supply
copy of Bank Statement duly stamped by the Concerned Bank as a token of proof towards payment
of Wages to HR Department. In Case of Non ARC/ BRC works contract, it is also expected the
same practice to be adopt by the contractor.
3) Payment to contract laborers has to be made through Bank/ Cheque/ RTGS only. Wages rates for
contract laborers are applicable as per the terms and conditions of the license. The contractor shall
have to pay wages to workers as notified by Government of Gujarat., from time to time.
4) It should be ensured that all the labours engaged by contractor are covered under the provident fund
scheme and employee’s pension scheme and their contribution are remitted regularly to the
concerned RPFC. The photocopies of challan along with ECR in this regards should be submitted
regularly in G.S.E.C.L. office.
5) In case the contractor having more than one contract in the same TPS, the contractor shall have to
submit contract wise separate list of the workmen to the concerned Officer.
6) The contractor shall have to pay wages to workers as notified by Government of Gujarat., from time
The above instructions should be followed scrupulously to avoid undue litigation for non compliance
1. LABORS LAW :
(A) Person below the age of 18 years and above 60 years should not be employed for the work.
(B) No female worker shall be employed in the night shift between 07-00 PM to 06-00 AM.
(C) Contractor shall maintain a valid labor license under the contractor labor (Regulation and Abolition)
Act for the employing necessary manpower to be required by him in the absence of such license
the contractor shall be liable to terminated without assign any reasons thereof.
(D) The contractor shall at his own expense comply with all labour laws and keep the GSECL
indemnified in respect thereof. Some of the major liabilities under various labour and industrial laws
which the contractor shall comply are as under :
1. Payment of contributing of way of Employer’s contribution towards provident fund, family pension
scheme, deposit linked insurance scheme, administrative charges etc. at the rates made applicable
from time to time by Government of Gujarat/ Government of India or other Statutory Authorities.
2. Payment of deposit in respect of each contract labor at rate applicable with the office of
Commissioner of Labor are as per contract labor (Regulation and Abolition) Act.
3. License fee as prescribed under the contract labor (Regulation and Abolition) Act and rules framed
there under depending upon the number of workman employed by the contractor .License is
compulsory if ten or more labors engaged due date.
4. Identity cards as prescribed under the factories act. (with photo affixed there to the same for
identification) shall be issue to workmen.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
5. Payment of retrenchment compensation, notice pay and other liabilities as per Industrial Disputes
Act. Any payment to the contractor’s employees arising out of any claim or disputes under the
industrial Disputes Act. 1947 or any other labor laws.
6. Payment of compensation in case of accidental injury shall be made as per the WC act.
7. Provision of crèche if female labor employed is more than 30 numbers.
8. Maternity leave as per the provision of the Maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities prescribed
under the various labour laws in force from time to time from statutory Authorities like State
Government / Government of India, which the contractor shall have to comply with.
2. PROVIDENT FUND AND FAMILY PENSION SCHEME.
The contractor shall submit along with his bill (month wise) statement regarding deductions against
employees’ provident fund and family pension scheme in respect of each concerned employee.
Provident fund and family pension scheme at the rate of 12 % of wages (or at the rates made
applicable by the Government time to time). The contractor’s contribution and his workers
contribution towards provident fund and family pension scheme shall deposited by the contractor
with Regional Provident Fund Commissioner, Ahmedabad. In case if the contractor deposits the
contribution to the Assistant Provident Fund Commission, the zerox copy of challans and schedule
must be submitted in the office. For maintaining the CPF Account of contractor’s employees the
contractor will have to pay administrative charges as applicable of the emoluments of the employer
of the contractor's every month.
3. GROUP INSURANCE SCHEME:
The contractor has to take Group Insurance for all workmen engaged by him and copy of the same
shall be produced to Concerned Officer
4. PAID LEAVE FACILITY :
Paid leave facility at the rate of one day for every 20 days worked by the contract, labour shall be
provided by the contractor to his workers. It shall be duly verified and approved/certified by the
authorized officer of GSECL.
5. The contractor shall employ adequate number of experienced staff at site for daily supervision and
for maintaining of various registers and records required under the law and contracts. No payment
for such supervision shall be admissible.
6. CONTRACTOR TO INDEMINITY THE BOARD
The contractor shall indemnity and keep indemnified the Board and every member, officer and
employees of the G.S.E.C.L. also Engineer in charge and his staff against action proceeding
claims, demands, costs and expenses whatsoever arising, out of or in connection with the maters
referred in above clauses and elsewhere and against all actions claims, demands, cost and
expenses which may be made against the G.S.E.C.L. by any workmen / employees of the
contractor or any sub contractor and/ or contractor from any liability any wise any workman
employees of the contractor or sub contractor under any laws rules or regulation having the force
of low including but not limited to claims against the owner workmen compensation Act
The employees Provident Fund 1952, and or/ the Contract labor (Abolition and Regulation) Act.
1970 the G.S.E.C.L. shall not be liable for in respect of or in consequence of any accident or injury
to workman of other person in the employment of the contractor or his sub contractor and the
contractor shall identify workman in the G.S.E.C.L. against all such damage and compensation and
against all claims, demands, proceeding costs charge and expenses what so ever in respect
thereof or in relation there to.
7. WORKMAN’S COMPENSATION & EMPLOYER’S LIABILITY INSURANCE :
Insurance shall be affected for all the contractor’s employees engaged in the performance of this
contractor. If any of the work is subjected, the contractor shall require the sub contractor to provide
workman’s compensation and Employers Liability Insurance for the letter’s employees are covered
under this scheme.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
8. Any other rules and regulation, conditions, Circulars etc., that are in force at present and that may
be framed by the GSECL From time to time in connection with contracts will be binding and
acceptable to contractor.
9. The contractor must possess separate P.F. code for the above subject work.
10. Attendance rolls shall be maintained up to date. All the written registers, Performa etc…shall be
filled up and maintained up to date and kept ready for inspection at any time or submitted in-time to
the concerned authorities as per contract labour etc. Factory Act. etc... By contractor
11. It is the responsibility of the contractor to ensure that contractor’s employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this regard
will be viewed seriously and contract is liable to be terminated. If any of contractor’s staff is found
unsuitable or not behaving properly, the contractor shall have to remove him from the work-site on
demand by GSECL. The contractor shall have to strictly observe the rules and conditions specified
in the enclosed works contract booklet of the GSECL, which are not modified hereunder. To keep
harmonious industrial relations amongst contract labours is the sole responsibility of the contractor.
Any breach of the same will be viewed seriously.
12. Before starting the work, the contractor should contact Industrial Relation Officer/ Labour Welfare
Officer/ AS for all formalities and obtaining the gate passes of all contract labourers and for other
13. The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed
two years of services for each worker for the liabilities of the gratuity( * applicable to ARC/BRC
works contract only)
14. The Company reserves the right to terminate this rate contract at any time during contract period
without giving notice of termination of any reasons thereof.
15. The Company will be entitled to deduct directly from the bills, to be paid to the contractor any sum of
sums payable by the contractor and which sum/sums the GSECL is required to pay as a principal
employer on account of Contractor default in respect of all liabilities referred to in above clauses.
16. Nothing in the contract document stated shall anywise constitutes any workman/ employees of the
contractor or any sub contractor as or to be workman employees of the owner or place obligationary
liability in respect of any such workman/ employee upon the GSECL.
17. Office Correspondence will be carried out in English and if at any time to facilitate the contractor,
Gujarati Translation may be furnished if deemed fit the English version will be the contract one the
same only will held good for legal matter.
18. Contractor will be responsible and liable to pay difference in wages if any and or observe the revised
service conditions that may be awarded by the honorable Industrial Tribunal effective from the dated
directed in the award.
19. Rate quoted are firm and hence no price escalation or labor escalation will be applicable towards
execution of work.
20. In case of delay in execution of work the penalty as Cl. No. 3 of Tender and contract for work will be
21. Party shall have to provide at their own the required personal protective equipments of standard
make (ISI approved) to their staff during work execution and it will be your responsibility to see that
the same are by your staff while at work.
Follow the following procedure at each milestone for the execution of works contract.
(a) On Commencement of Contractual Work:
(1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual
work awarded. Contractor shall have to apply for the gate passes in triplicate in a prescribed
application form which is to be available from Security Section for the entry of workmen in the
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(2) Such application shall have to be proceeding for the approval of Factory Manager. After obtaining
approval of Competent Authority, contractor shall have to prepare the Gate Passes and obtain the
signature of Factory Manager.
(3) If Labours are required to be engaged in Emergency during Public Holiday , Contractors Can apply
for Temporary Gate-Pass for the period of only three days with recommendation of respective
EE/SE and the same shall have to be regularized after following the procedure of Gate Pass
applications on the office working day from HR Department. It is to note that No Temporary Gate-
Pass shall be issued for the work other than acute emergency to carry out the work in power station
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee Compensation
Act, 1923 prior to commencement of work.
(5) The Contractor who intend to engaged More than 50 labours to Carry out the awarded contractual
work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 / Form No. VI under
the Interstate Migrant worker (employment regulation) rule 1979 as applicable is to be obtained from
HR Department for the purpose of obtaining Labour License from the Licensing Authority.
(b) During Contractual Work under the progress:
1) Bill Recording Officer of User department shall have to ensure as to whether contractor has
engaged minimum number of contract workmen per day as per the terms of work order.
2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by them,
on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably situated
in the premises of KHEP area in case of ARC /BRC works Contract. The Contractor shall supply
copy of Bank Statement duly stamped by the Concerned Bank as a token of proof towards payment
of Wages to HR Department. In Case of Non ARC/ BRC works contract, it is also advisable the
same practice to be adopted by the contractor. All Contractors has to comply & maintain statutory
documents / registers at site under the provision of labour laws & EPF Act
(c) Submission of Statutory documents to ensure the compliances:
The contractor shall have to submit following statutory documents (in triplicate) under the labour laws
and EPF to the EIC for passing the RA bills and for ensuring the compliances of provision of
labour laws and EPF Act.
Copy of attendance register – with name & address of establishment, name of work and site (duly
signed & stamp by contractor) – Form XVI.
Copy of wage payment sheet – with signature of workmen, duly signed & stamped by contractor
Copy of bank statement of wage payment (duly signed & stamped by concern bank)
Copy of PF challan along with ECR statement.
Copy of gate pass permission (duly signed by authorities)
Copy of valid W.C. policy
Copy of valid labour license (if applicable)
Form No. XIII – Register of workers employed by contractor.
RA Bill shall not be processed without receipt of above mentioned documents (in triplicate) by
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GENERAL CONDITIONS OF CONTRACT
1. The contractor shall at their own expense make all necessary provision for housing water
supply and sanitary arrangement for their employee as well as for works and shall pay direct to
the authorities concerned all rates and taxes.
2. The contractor shall make their own arrangements for the necessary approach road, for
transport of their materials and be responsible for the Compensation on account of damage to
crop on Corporations’ property.
3. All the royalty charges octroi other duties will be paid by the contractor and no extra could be
claimed on this account.
4. The organization will supply articles at the place and rates mentioned in schedule ‘A’ of Tender
In case of the materials issued either through or with the recommendation of this organization
it will be absolutely necessary for the contractor to maintain a correct and honest record of the
daily consumption of the said materials/with inside particular reference to the work during the
The Engineer-in-charge of this department or his authorized agent shall have the right to
inspect and check the stores containing these materials and the account for these materials
shall be presented for inspection whenever asked for by them. Every facility shall be afforded
by the contractors for all these inspections Engineer-in-charge will supply the materials in any
quantity as deemed fit.
5. Godown of sheds hired or constructed for storage of controlled materials and more/ particularly
of cement shall be such as would prevent the materials from getting damages in any way.
6. It will be absolutely incumbent o the contractors to have on the site of work only such of the
materials as have been dully passed by the Engineer-in-charge Materials that have been
rejected must on no account be allowed to remain on the side and in spite of written order to do
so any such rejected material is on the site beyond a period of 48 hours, notice the Engineer-in-
charge shall have the right to remove it at the risk and cost of the contractor and even destroy
7. It must be distinctly understood that the conditions of the contract and of claims in respect of
extra work will not be allowed, unless the works to which they relate is clearly without the spirit
and meaning of the specifications or unless such work are ordered in writing by the Engineer-
in-charge and claimed for in specified manner.
8. On completion of the work, the site shall be cleared by the contractors within the stipulated
period, and ground brought to original state and they shall not be entitled for any extra claim on
9. General specification of the latest edition of the P.W.D. Hand Book volume I & II shall also
10. When cement is obtained through or with the recommendation or issued by the Corporation it
should be understood that the contractors will have to be very careful regarding the handling of
the cement bag so as to preserve their serviceability and quality.
11. DAMAGE CAUSES TO WORKS: The work whether fully constructed or not, and all materials,
machinery plant tools, temporary building and other things connected there shall be at the risk
and in the sole charge of the contractor until the works have been delivered, completed to the
Engineer- in-charge and certificate from him to that effect obtained until such delivery the
contractor shall at their own cost take all the precautions reasonably necessary to keep all the
aforesaid works materials machinery, plant, tools, temporary building and other things
connected with the work, free from any loss or damage and in the event to the same or any part
there of being lost or damage shall from with within possible speed, reinstate and make good
such loss or damage at contractor’s own cost.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
12. Supply of controlled articles will be invariably recommended after the actual requirements have
been carefully scrutinized. In the event of any such materials remaining in surplus in charge of
the contract, on account of some modifications either in the design or changes in construction
or any other reason will be returned to the department.
13. There will be generally no objection on the component parts of the works being given over to
responsible sub contractors but it must be borne in mind that this department would under no
circumstances recognize these sub contractors and responsibility of executing the work in
accordance with the condition of the contract will entirely rest on the main contractors. The
main contractors will therefore always have the very responsible member preferably a technical
hand, present on the works with power to sign all work order issued on the site of work and to
take requisite actions in the interest of very efficient execution of works.
14. With a view to ensure rapid progress on the works purchaser may store at work sites certain
quantities of the materials such as cement etc. and it will be incumbent on the tender to
purchase these materials, at the rates mentioned in schedule ‘A’ of tender form for supply of
necessary articles, all necessary help will be tendered but in must be clearly understood that
the purchases does not accepted and responsibility for the delay that may be cause in their
supply on account of circumstances beyond the purchaser’s control.
15. The Engineer-in-charge will fix the hours of work and no work shall be executed beyond that
period during night time or in absence of the Engineer-in-charge or his authorized agent. The
box measures shall be filled only in the presence of the Engineer-in-charge or his authorized
16. Contractor will be asked to present the sample of materials and the approved sampled will be
preserved at the site of work and no change in the approved sample will be allowed without the
written permission of the Engineer-in-charge.
17. If any work is not executed according to the specifications and the directions of the Engineer-in-
charge the same will be rejected or reduced rate will be allowed as deemed fit by the Engineer-
18. Contract will have to communicate the name of his authorized agent who shall be presentation
the works and shall be authorized to sign the materials requisitions receive instruction given
verbally, or on the order book on behalf of the contractor.
19. The materials issued to the contractor as per schedule ‘A’ of the tender shall not be removed
from the work and all surplus material at the end of the works which is considered serviceable
shall be returned to the organization even the unserviceable material shall be removed only
with the prior permission to the E.E. in writing.
20. The contractor will have to sign the conditions of the contract and execute the agreement, send
the list of previous works executed solvency certificates and pay up the security deposits, failing
to that the tender will be rejected and earnest money deposit will be forfeited. The value of the
stamp paper and stamp duty charges shall be borne by the contactor.
21. The contractor must arrange for all transport of materials weighting of material issued at
department stores and all such cost include in the rates of schedule ‘B’ with the loss or above
percentage quoted by the contractor for finished work.
22. The competent authorities can delete to any items in the schedule ‘B’ of the tender order if they
fill that the items is not essential to be executed.
23. A schedule of quantities is included in the tender document it shall definitely understood that
the Corporation does not accept any responsibility for the correctness or complication of this
schedules and this schedule is liable to alterations by commissions, deduction or additions at
the description of the Addl.Chief Engineer of as set forth in conditions of contract specific
percentage less or above shall be quoted by the contractor below the total amount of schedule
percentage less or above shall be quoted by the contractor below the total amount of schedule
‘B’. The tender documents shall be written legibly and free from grouser, over written on
conversion of figures correction where unavoidable shall be made by crossing out initialing
dating and rewriting both in figures and in words in case of my discrepancy in figures the price
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
quoted in words shall prevail.
24. This notice to tenders shall form a part of the contract.
25. The entire work is to be completed within the stipulated time limit from the date of work order.
The contractor will not be eligible for any extra for the idle period of work or waiting period that
may be required to suit other considerations and no claim for compensation on account of such
will be considered. However in case or delay due to circumstances beyond the control
contractor either in date of commencement or due to waiting during construction extension time
may be considered for completion of work.
26. In case contractor is unable to account for full quantity of materials issued to him from the
department stores, recovery will be effected from him at cost rates or market rates prevailing at
the time of issue whichever is higher, plus 15% to cover Corporation’s departmental supervision
charges for all material unaccounted for.
27. Scrap from reinforcement (bars below 1.25 M lengths) not be accepted back and the contractor
will be authorized to remove it from the site after completion of works and rendering of accounts
with written permission of Engineer in charge not below the rank of Executive Engineer.
The corporation will not be responsible for any delay in supply of controlled materials such as
M.S. Reinforcement Bars cement etc. however it will hand over to see that there in no delay of
Due consideration will be given in granting extension of time for completion of the work if
found necessary on account of delay supply of materials. No claim for compensation or for
damages for extension in time shall be entertained in this account.
All materials inquired by the contractor shall be drawn from the stores by requisition given in
writing by the contractor at least one week before the requirement of work. The recoveries will
be affected in running payment for all material issued up to the date of measurements for the
particular bill or the quantities used in the works measured at the description of the Executive
Engineer in charge of work.
28. The contractor shall keep one full time qualified Civil engineer at site who shall be fully
authorized to receive and comply with such instructions as given by the Executive Engineer.
The names of such Engineer with his qualification and experience shall be intimated by the
contractor. The E.E. shall have the right to demand the removal of any technical person. Skilled
or unskilled work men who in his opinion are considered to cause bad workmanship in the
execution of work or to cause indiscipline.
29. Bill shall be submitted by the contractor monthly on or before the date fixed by the E.E., for all
works executed in the previous months.
30. SUPPLY OF WATER AND ELECTRICITY: If possible water for construction purpose only may
be supplied by the Corporation at one point as decided by the Engineer & recovery for water
charges shall be effected at two percent of cost of time as executed in which the water
supplied by the Corporation is used as certified by the Engineer in charge Electric supply is
required the contractor shall be given Free of cost by GSECL. (Applicable to CIVIL WORKS
31. Should this tender be accepted I/We have agreed to abide by and full fill all the terms and
provision of ‘Tender and Contract of works’ as applicable and in default there to forfeit and pay
to the Corporation the some of money due.
32. The work will have to be carried out in co ordination with other Agencies on the same site on
account of this in case the contractor has to stop or delay his works for same time he will not
claim anything extra only Corporation may consider to give suitable extension in time limit if
necessary on such account.
33. Any disputes arising out of the contract if not settled mutually, than the same shall be settle by
Gujarat Public Work Arbitration Tribunal act-1992.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
The following are the major obligations to be filled by the Contractors as per the Contract Lab our (R&A)
Act 1970 and rule mentioned there under:
1. License to be obtained before starting the work where number of contract laborers in 50 (fifty) or
2. Payment to contract laborers has to be made in presence of IRO/LWO. Wages rates for contract
laborers are applicable as per the terms and conditions of the license. The contractor shall have to
pay wages to workers as notified by Government of Gujarat., from time to time
3. Contractor shall have to maintain the muster roll and wages register in respect of his contract labour.
4. Contractor is required to issue employment card, wages slip and attendance card to their laborers.
5. The Contractor has to maintain the register No.13 containing details of contract labour employed by
6. Earned Leave register/card as per the Factories Act. and Rules.
7. Other registers required under contract labour Rules and the Factories Act and Rules.
8. Contractor shall have to obtain insurance policy in respect of the contract labour engaged by him to
cover them under Workmen’s Compensation Act.
9. To send half yearly return to licensing officer as per Rule 82 (1) as per scheduled time.
10. Before starting the work as per the contract awarded to him, he should make arrangement tender
into the agreement in the prescribed format on the stamp paper as applicable before fulfilling the
above requirement the contractor is instructed not to start the work. There responsibility will be on
his head in case he fails.
11. Contractor should posses separate P.F. code on their firm, name otherwise their offer may not be
12. The contractor shall have to pay wages as may be revised from time to time and as may be declare
by Gujarat Government.
The Contractor are informed to adhere to the rules and regulations applicable to them, particularly in
respect of the laborers engaged by them, the contractor not fulfilling the obligations will not be allowed
or continue with work/not be held qualified to carry out the work At KHEP,GSECL..
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Sub: “Work of various underwater services including underwater videography & photography of TRC
area, trash racks of upstream & downstream, draft tube tunnel and NDT (UT) inspection of
penstock gate at KHEP.”
SR.NO DESCRIPTION QTY UNIT RATE AMOUNT
Underwater videography & photography of TRC
area & trash racks of upstream & downstream of
2 Underwater videography & photography of draft 01 Job
tube tunnel of Unit.1
3 Underwater NDT(UT) inspection with videography 01 Job
& photography of penstock gate of Unit.1
Ex-Works(Excluding GST) Total Rs
Total Value in Rs
(In Word: Rupees + G.S.T. extra as per Govt. rules)
1. The Payment shall be made for Actual Work done only probably on RA bill basis.
2. The rates are excusive of GST. GST at prevailing rate, if applicable will be paid by GSECL extra after
confirmation in GSTR 2A.
3. Applicable taxes towards forfeiting of EMD, Security Deposit and charging of penalty including liquidated
damages in accordance with the T & C of the contract shall be in the scope of contractor/supplier.
4. GSECL GSTIN NO: 24AAACG6864F1ZO.
5. GSECL PAN NO: AAACG6864F.
6. YOURS GST NO:
7. YOUR PAN NO:
8. TDS ON GST: As per the notification no.51/2018 Dtd: 13.09.2018 provision related to TDS on GST shall
be applicable w.e.f 01.10.2018.Hence TDS @ 2% shall be deducted on contract value.
Addl. Chief Engineer (G)
Signature of Contractor
NOTE: THE SCHEDULE-B IS ONLY FOR VIEWING NOT TO QUOTE THE PRICES. ONLY HSN/SAC
CODE ANDGST RATE ARE TO BE MENTIONED IN ABOVE SCHEDULE- B
CONTRACTOR MUST HAVE TO QUOTE ONLY IN ON LINE E-TENDER.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
BANK ACCOUNT NUMBER
TYPE OF ACCOUNT
BRANCH NAME & ADDRESS
CONTACT NUMBER OF THE BRANCH
Bidder has to fill all the details as above as the same is mandatory
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Gate Pass Procedure
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GENERAL SAFETY RULES / NORMS TO BE OBSERVED BY THE CONTRACTORS.
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety Rules.
Concern principle contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged, if
any, by them for the work contract awarded to them. Prior to commencement of the work, Contractor
shall have to submit a written assurance on their letterhead to the concerned Sectional Head /
Engineer-in-charge that they have thoroughly gone through these Rules, have educated their
employees / workers of their sub contractor and will strictly observe the said Rules while execution of
work under work contract awarded to them. They will have to indemnify the company for any loss or
damage / accident / injury to the company’s property / employee or employee of their own in default of
non - observing these rules.
1. Contractor sho uld issue photo gate p ass f or their workers f rom GSECL Factor y
Manag er as per G ujarat Factories rules, 1963 & det ails shall be f ille d up in
GSECL gat e pass f ormat as per Aad har card /Election car d id proof & to f ollo w
the g ate pa ss issue procedure through concern department EE & SE, Security Officer,
LWO/IRO/DGM, Factory Medical Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
2. In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
3. Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat
Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor
workers before commencement of work & examination responsibility shall be taken by contractor
as well as concerned Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory Medical Officer after
every six (06) months of contractor with their contractor workers. Contractor shall be fulfilled all
health requirements before commencement of work. After completion of medical examination in
form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker gate pass
procedure format.
4. Contract worker gate pass will issue after completion of safety induction 3D animation movie &
Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
5. As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue
PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving
license, Electrical contractor license, Electrical trade qualifications, Safety induction training,
SOP, supervisor qualifications etc. After fulfillment of all Safety compliances, Safety Officer/Dy.
Safety Officer shall be signed in Contract worker Gate pass procedure format.
6. Work Contract shall be completed by principle contractor/agency/person who is awarded the
work order. Subletting of contract shall be allowed only if prior approval of Power station chief
before execution of work. Contractor/agency shall be submitted the entire subletting contract
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
documents with gate pass application through concern department EE & SE, LWO/DGM, Safety
Officer/Dy.Safety Officer & Factory Manager.
7. Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
8. Valid Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass by
agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical
License photocopy shall be checked by Concerned HOD of Electrical Department/Electrical
Safety Officer/Dy.Safety Officer/ Safety Officer/Factory Manager.
9. As per nature of job/work, Qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I)+3 years experiences or ITI + 10 years) shall be engaged by contract
agency & qualification certificate with experience certificate shall be submitted to concern
EE/SE/LWO/IRO/DGM/ Dy.Safety Officer /Safety Officer/Factory Manager at the time of apply
10. As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the
work on electrical lines and Apparatus, Contract person/worker possesses a certificate of
competency or electrical work permit, issued by the Appropriate Government. That means,
Electrical trade Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma
(Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted to concern
EE/SE/LWO/IRO/AS, Dy.Safety Officer/ Safety Officer/Factory Manager at the time of apply for
photo gate pass procedure.
11. As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7
round the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor
(BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by
contractor during dangerous operations/dangerous works as well as day to day dangerous
activities, safety supervision, tool box talk, Safety awareness programme, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
12. License of driver shall be submitted with gate pass issue application as per nature of vehicles &
to follow the Motor vehicle Act,1988,the Central Motor Vehicles (Amendment) Rules,2016 as
well as Gujarat Motor Vehicles rules,1989 & driver license shall be checked every day by
security shift in charge before entry in the Factory premises.
13. SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person
as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP
will review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
14. It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective
Equipments / Safety Gadgets suitable to give sufficient protection against hazards involved in
their work / job to their staff, as per the job requirement and insist / enforce their workers to put
on the same while at works.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
The ongoing work is liable to be stopped at any time if your contract workers/staffs found
working without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI
approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it
will check by concern section HOD & Dy.Safety Officer /Safety Officer at the time of gate pass
Industrial Safety Helmet For protection of head against falling objects or during fall of
person from height. Yellow Colour helmet is used for contract
worker with agency logo.
Safety Goggles/welding For protection of eyes against flying particles / dust, chemical
goggles/chemical splash goggles splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical
splash, spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high noise
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged objects,
proximity suit/FR Boiler Suit heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged
objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged
Oil/Chemical/water/heat/ Electrical objects, heat, hot metals/objects, electricity etc..
resistance etc.
Safety Belt(full body hardness with For fall prevention while working at heights or in depth, working in
double lanyard & shock absorber) vessel or in confined space.
/ Rope / Life line / Fall arrestor
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Respirator Protection against toxic chemical fumes / gases/vapors/dust etc.
with full face mask type
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen, etc
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of confine space
(LEL,O2,CO,H2S,SO2, etc) & Major fire
Automatic voltage detector To check the present voltage or induction voltage of electrical
equipments/ bus/switch gears from 01 (one) feet distance before
starting the any electrical work .
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Auto darkening welding helmet The new auto darkening welding helmet combines legendary
(EN 379 & EN 175 Level-B) with Speed glass quality and auto darkening technology with an
PAPR as per EN 12941:1998, innovative wide-view grinding visor to give welders an all-in-one
class TH2 and AS/NZS 1716 solution for more flexibility, precision, and efficiency. Respiratory
System is a combined face and breathing protection device, for
increased comfort and safety in welding. The unit is equipped
with a particle filter which removes particles from the air. The unit
provides a constant airflow independent of filter combinations and
clogging. The unit can also be equipped with a gas filter (for
example A1B1E1). The unit supplies air to the head top via the
connecting breathing tube. The airflow creates a slight positive
pressure which together with the sealing to the face prevents
particles and other contaminants from entering the head top.
1) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by party/agency/contractor to
their contractor workers as per nature of job and allotment of PPE list shall be submitted to Safety
Officer, on his letter head as per below mentioned format by Contractor before commencement of work
through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement
Time limit for work order:
Sr.no. Name Designation Name of Name of IS Make Qty Unit Date Receiving
of Section PPE :Code of of signature
workers under no. of PPE issue
2) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
3) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
4) During the work execution, one trained & competent supervisor of agency should always remain
present at work site. Concern JE/DE of GSECL shall be supervised the contract work as per
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
5) Approved NABL laboratory calibration certificates of electrical/ mechanical/ Civil/C&I/
Environment survey/ Chemical etc measuring /testing equipments/instruments which are used
during contract work shall be submitted before starting the work & shall be checked by concern
JE/DE/EE before starting work & it’s record shall be maintained in concern section.
6) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
7) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk &it’s control measure (mentioned in HIRA) before
starting the job work and records shall be maintained for each & every job works.
8) Display Safety instructions shall be strictly followed by all workers who are working in factory
9) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by contractor &
contractor workers from Concern EE/Chief Chemist before starting of chemical handling work.
10) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel,
sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents ,is or may be a source of danger before starting the work each & every
days or after interval/recess. Contractor supervisor shall be informed to concerned HOD
regarding any unsafe conditions.
11) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc are to be strictly followed by all workers who are working in factory premises.
12) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all
the inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in
fire prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments &
fire extinguishing media / material like sand / water buckets or other appropriate equipment at
13) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be
used. For taking care of the persons working inside the confined space / vessel, a supervisor /
person capable to keep continuous watch on person(s) working inside, assist them in case of
emergency or arrange to get immediate outside help, shall remain present at entry point. Use full
body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers
etc shall remain available near entry point or the entry point shall be cordoned by a barricaded
tape with a cautionary notice. After completion of the works, all the lids / covers / grills / grits
opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of
the work and leave the work place in safe condition in all respect, so as to prevent accident to
fellow workers.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
14) The contractor shall see that he / his persons do not work on or block (by stacking material,
spare parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles /
staircases / ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on
which there is traffic movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost
necessary to carry out work in such area with blocking of passage, prior permission of
Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare the
area as “UNSAFE”, cordon it using barricading tape & display suitable caution notice or keep a
person to restrict / divert the traffic on this route through other safe passage.
15) The contractor shall see that he / his persons do not work on or block (by stacking material,
spare parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles /
staircases / ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on
which there is traffic movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost necessary to carry
out work in such area with blocking of passage, prior permission of Competent Authority or the
Engineer-In-Charge shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon it
using barricading tape & display suitable caution notice or keep a person to restrict / divert the
traffic on this route through other safe passage.
16) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like
welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is
found safe to use. Do not use defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor’s Mains Board on which it is compulsory
to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably
be earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be
used shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it
is necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for three
phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate
capacity & safe to use.All electrical & mechanical equipments / tools-tackles viz. welding
machine, cutting machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be
used during work execution shall be of standard make & bear ISI certification mark on it. The
consumables like welding electrodes, grinding wheels / discs etc which has specific prescribed
life span shall not be used in any case if its expiry date is over.
17) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall
be submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits
shall be checked by JE/DE before commencement of Electrical work.
18) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it
shall be checked and used only if found safe to use. Also, ensure that these are tested,
examined & certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat
Factories Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior to
lifting the weight. Valid Test certificate of all Lifting machines used by Contractor to be
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
submitted to Dy.Safety Officer/ Safety Officer before commencement of work through
concerned EE/SE.
19) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard & Fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
20) Contractor or their employee shall not interfere in day-to-day routine plant activities / works
except the work assigned to them, shall not loiter in the areas other than their work jurisdiction,
as well as shall not temper / operate / touch the machineries/equipments/auxiliaries with which
they are not concerned. Also, the contractor shall strictly instruct their staff for not to sit or take
rest at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous &
prone to accident.
21) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen,
Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2etc shall be handled safely taking due care.
To handle / shift such cylinders a special trolley /cage meant for it must be used but in no case it
should be rolled.
22) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated
area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on
each vehicle by party/agency and it will check by shift security in charge before entry of vehicles
in the factory premises.
23) No women or young person shall be employed or permitted to work in Lead-compound area like
battery room etc. as per schedule VI of GFR
24) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories act
25) In all risky job, before start the work, contractor should obtain General Safety Work Permit
through concerned section from Shift –in-charge well in advance.
26) In case of noticing smoke or fire during their work execution, they shall make immediate efforts
to extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station
Fire Officer or Emergency Control room no which is displayed at prominent place of factory like
Main Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All
security gates, Occupational Health Centre.
27) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No.
21&ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as
per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be
filled up by concern department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured
person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety Officer/Safety
Officer/Electrical Safety Officer then after injured person may allow for work.
28) For any incident occurred but have no injury to any persons should also reported as per GSECL
format and informed to Dy.Safety Officer/Safety Officer as Near Miss Incident.
29) Safety penalty shall be imposed against Offences by contract workers: If any contract
worker worked in a factory contravenes any provision of Factories act or any rules or orders
made there under, imposing any duty or liability on workers, contractor/agency shall be
punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
(v) Operate Portable power tool without ELCB Rs.1000/-per equipment
(vi) Work without qualified Supervisor as per nature of job like Rs.1000/-per day
mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles (like Rs.2000/- per equipment
C.P.Bs., Hook chooks, winch, forklift, mobile crane, EOT
crane etc) & its attachments (like D-shackles, slings, U-
clamps, Eye bolts or any fixtures) in Form No.10 of Gujarat
Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working at Rs.3000/-per person
Height work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
Safety Penalty is to be imposed directly by individual Dy. Safety Officer/Safety Officer/Electrical
Safety Officer and Factory Manager/Occupier against violation of statutory requirements and
penalty will be recovered through RA bill. Photograph/CCTV camera footage is to be put up with
penalty note by imposed individual officer.
30) Party will damage any fire equipments or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up by
31) All the relevant labour and industrial laws shall also be followed compulsorily.
32) Af ter completion of work, cotton waste, g rease, oil, unused materia l, welding rod
pieces, scrap etc. are to be remove d b y contractor and scrap shall be depos ited
to scrap yard of Main Store.
33) For performance evaluation of contractor, safety factors of work accident, fire incident & near
miss accident will be considered. Steps can be taken to review the job assignment up to
cancellation for negligence.
34) Over & above these, contractor shall have to follow all the safety requirements /rules &
regulations / norms and legal provisions laid down in various statutes. Particularly the provisions
of The Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The
Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor shall also
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
obey the rules / regulations / instructions of the local Competent Authority for safety & health
35) The above rules shall be scrupulously followed and where required, Contractor /contractor
workers may contact to the Dy.Safety Officer/Safety Officer/Electrical Safety Officer in case of
any ambiguity or needs further guidance in this regard.
Addl. Chief Engineer (G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
(IN GUJARATI LANGUAGE)
U]HZFT :8[8 .,[[S8=L;L8L SF[[5F[Z[XG ,LP
SMg8=FS8ZMV[ 5F/JFGF ;,FDlTGF lGIDF[ o
GLR[ H6FJ[, ;,FDlTGF ;FDFgI lGIDMG]\4 NZ[S SMg8=FS8ZMV[ R]:T56[ 5F,G SZJFG]\ ZC[X[P T[DGF JS"
SMg8=FS8 C[9/ SFI" SZTL NZ[S V[Hg;L q SFDNFZMG[ ;NZC]\ lGIDMYL ;\5}6"56[ JFS[O SZJFGL VG[ SFI" NZdIFG
VF lGIDMG]\ 5F,G SZFJJFGL HJFANFZL H[ T[ SMg8=FS8ZGL ZC[X[P p5ZF\T4 NZ[S SMg8=FS8Z[ T[DG]\ SFI" RF,] SZTF\
5C[,F ;\AlWT lJEFULI J0F q .HG[ZMG[ AF\C[WZL VF5JFGL ZC[X[ S[ T[D6[ GLR[ H6FJ[, “;]Z1FFG[ ,UTF\
;FDFgI lGIDM” AZFAZ JF\R[, K[4 T[DG[ D/[, JS" SMg8=FS8G]\ SFI" SZTL q SZFJTL JBT[ ;NZC]\ lGIDMG]\
;\5}6"56[ 5F,G SZX[ VG[ VFD SZJFDF\ lGQO/ UI[YL S[ p<,\WG SZJFYL HF[ lGUDGL SM.56
DF,vlD,STG[ G]SXFG YX[ VYJF TM T[DGF q SM5M"Z[XGGF SM.56 :8FOG[ .HF q VS:DFT G0X[ TM T[GL ;\5}6"
HJFANFZL T[DGL 5MTFGL ZC[X[P H[GL T[VMV[ BF+L VF5JFGL ZC[X[P
s!f NZ[S SFI" SFDG[ VG]~5 IF[uI ,FISFT WZFJTL VG]EJL4 VYJF H[ T[ SFI" DF8[ BF; TF,LD V5FI[,
DF6;F[G[ H SFD 5Z ,[JF q ZFBJF H[YL VS:DFTF[ GF AGFJ G AG[P U[.85F; JUZGF DF6;MG[ SFD
5Z ,[JF GCLP NZ[S SFDNFZMGL H~ZL lJUTM H[D S[ ;ZGFD]\4 OMG G\P GHLSGF ZL,[8LJGF GFD4 JU[Z[4
PP ZHL:8ZDF\ ZFBJL H[ VS:DFT ;DI[ DNN~5 AG[P SFD NZdIFG ;F.8 5Z C\D[XF IMuI ,FISFT
WZFJTM ;1FD ;]5ZJF.hZ ZFBJFGM ZC[X[P
sZf EIHGS 5NFYF["4DXLGZL TYF lJ:TFZ S[ H[GF p5Z R[TJ6L NXF"J[, CF[I VYJF D}S[, CF[I tIF\ VYJF
TG[F 5Z SFD SZTF 5C[,F ;5\ }6" ;,FDlTGF 5U,F\ ,[JF V[G [ H~ZL c,F.G S,LIZc VYJF c5ZDL8 8]
JS" c ;A\\lWT ;[SXGDF\YL VYJF T[DGF åFZF ;1FD VlWSFZL 5F;[YL D[/JL ,[JL VG[ tIFZAFN H SFD
s#f J[<0L \U 4U[;4S8L \U VYJF VgI CF[8JS" HF[As S[ H[DF\ :5FS" UZDL lJP5[NF YFIf SZTF\ 5C[,F SFDGL
HuIFGL VFH]AFH] SF[. VFU 5S0L ,[ T[J] D8LZLI, 50[, CF[I TF[ B;[0L GFBJ] VG[q VYJF -F\SL N[J]\4
8]\SDF\ VFJF SFIF[" åFZF VFU G ,FU[ T[ DF8[GF ;\5}6" ;,FDlTGF 5U,F\ ,[JF p5ZF[ST 5|SFZGF
CF[8JS"vHF[A RF,] SZTF\ 5C[,F ;\A\lWT ;[SXGq0L5F8"D[g8 G[ HF6 SZJL VG[ cCF[8JS " 5ZDL8c VYJF
c5ZDL8 8] JS" c;1FD VlWSFZL 5F;[YL D[/JL ,[JL p5ZF\T VFJF SFI " NZdIFG VFU lGI\+6GF ;FWGF[
H[JF S[ VluGXFDS I\+F[4 Z[TLGL AF,NLVF[4 5F6LGL AF,NLVF[ lJU[Z[ CFHZ ZFBJFP VFUGL
XSITFVF[ JWFZ[ 50TL H6FI TF[ OFIZ ;[SXGG[ VUFpYL H HF6 SZJL S[ H[YL IF[uI 5U,F\ ,. XSFI
VG[ OFIZ JF[R ZFBL XSFIP
s$f SF[.56 SgOF.g0 :5[; s;F\S0L HuIF A\W HuIF VYJF TF[ T[JL HuIF S[ HIF\ CJFGL VJZHJZ GlCJT CF[I
VYJF TNG G CF[If GL V\NZ T[DH J[;<;GL V\NZ SFD SZJF HJF DF8[GL H~ZL cSgOF.g0 :5[[;qJ[[;<; V[[g8=L=
5ZDL8 c VYJF 5ZDL8 8] JS" ;\,uG BFTF TZOYL D[/JL ,[JL VG[ tIFZAFN V\NZ HJ] TYF SFD RF,] SZJ]\P
5ZDL8 JUZ V\NZ HJ]\ GCLPVFJL SgOF.g0 :5[;qJ[;<;GL V\NZ SFD SZTF DF6;F[G]\ wIFG ZFBJF ACFZ V[S
DF6;G[ VJxI ZFBJF[ H[ V\NZ SFI" SZTF DF6;F[G]\ ;TT ACFZYL wIFG ZFB[ VG[ .DZHg;LDF\ T[DGL DNN[
VFJ[4 DNN SZ[ VYJF DNN DF8[ jIJ:YF SZ[P V\NZ ZC[,F SFDNFZ[ O]], AM0L ;[[O8L A[<8 AF\\WLG[ H SFD SZJ]\P]\P
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
AM.,Z S[ 8F\\SL S[ SgOF.g0 :5[;[;qJ[;[;<;GL V\N\NZ ,F.8L \U\U DF8[ Z$ JM<8GM UF0" JF/M C[g0 ,[d5 ZFBJMP
U8Z4 8[=gR VYJF VFJL SF[. HuIFV[ -F\S6] BF[,L V\NZ SFD SZFJTL JBT[ T[GL VFH]AFH] VJZvHJZ SZTF
VgI SFDNFZ[qDF6;F[G[ R[TJJF DF8[ SF[. DF6; ZFBJF[ VYJF TF[ T[ lJ:TFZGL VFH]AFH] NF[ZL AF\WL ,F, S50]\
VYJF R[TJ6LGL GF[8L; ,UFJL G[ VgI 8=FOLSG[ R[TJJF[P
s5f %,Fg8DF\ HJFGF Z:TFVF[4 ;L0LVF[4NFNZ4,LO845[;[H S[ VgI U[UJ[h VG[ Z:TFVF[ S[ H[GF p5Z DF6;F[GL
VJZvHJZ ZC[TL CF[I VYJF .DZHg;LDF\ VJZvHJZGL XSITFVF[ CF[I T[GF p5Z SF[. SFD G SZJ]\ VYJF
T[GL p5Z VgI 5|SFZG]\ D8LZLI<; :5[Z5F8";4 8]<;8[S<;4 .SJL5D[g8; lJPD}SL Z:TFVF[ a,F[S G SZJF[P VFJL
HuIF 5Z SFD SZJ]\ VlGJFI" CF[I TF[ ;1FD VlWSFZLGL VYJF H[ T[ ;LJL, BFTFGF .HG[ZGL 5ZJFGUL
D[/jIF AFN SFD 5Z HJ]\ q SZJ]\ P VlGJFI" ;\HF[UF[DF\4 VFJL HuIFVF[ 5Z SFD SZTF\ 5C[,F T[ lJ:TFZG[ NF[ZL
T[DH ,F, S50]\ TYF GF[8L; D}SL HuIFG[ VJZ HJZ DF8[ V;,FDT HFC[Z SZJL VYJF V[S DF6; pEF[ ZFBL
VJZvHJZ V8SFJL N[JLq0FIJ8" SZJLP
s&f SF[.56 JLH/LYL RF,TF I\+s5FJZ VF[5Z[8[0 .SJL5D[g8 VYJF C[g08]<;f H[JF S[ J[<0L\U DXLG4 C[g0
U|F.g0L\U DXLG4 C[g00=L,L\U DXLG JU[Z[ p5IF[UDF\ ,[TF 5C[,F JF5ZL XSFI T[D K[ S[D T[ T5F;J]\ VG[
JF5ZJF DF8[ ;,FDT H6FI TF[ H T[GF[ p5IF[U SZJF[P BF[8SF. UI[, AU0L UI[, VYJF AZFAZ DZFDT G
YI[,F ;FWGF[ JF5ZJF GCLP p5ZF[ST ;FWGF[ åFZF .,[S8=LS XF[S G ,FU[ VYJF :5FS"4XF[8" ;ZSL8 lJU[Z[ G YFI
T[ DF8[ VFJF ;FWGF[G[ VYL"\U D/L ZC[ T[ BF; H~ZL K[P VFJF ;FWGF[ DF8[GF[ JFIZs5FJZ SM0"f ;F\WF JUZGF
;/\U VG[ 5]ZTL 1FDTFGF[ JF5ZJF[ S[ H[DF\ VYL"U JFIZ 56 CF[JF[ H~ZL K[P T[YL ;L\U, O[|.H DF8[ #s+6f
VG[ Y|Ls#f O|[.H DF8[ s5F\RfJFIZJF/F[ IF[uI S[5[;L8LGF[ H SF[0" JF5ZJF[ T[DH %,U4ZL;[%8[S,;45LG4CF[<0Z
lJU[Z[ ;FZL CF,TDF\ TYF IF[uI 1FDTFJF/F CF[I TF[ H JF5ZJFP 5FJZ SG[SXG HFT[ G SZTF\ .,[v ;[S;G
DFZOT[ 5FJZ ;%,F. ,[JFGM ZC[X[P
JS"VM0"Z D]HAG]\ SFI" SZFJJF DF8[ H~ZL NZ[S .,[S8=LS, TYF DLS[GLS, ;FWGM q p5SZ6M H[JF S[ J[<0L\U
DXLG4 S8L\U DXLG4 U|F.g0Z4 0=L,4 R[.G 5],L a,MS4 C]S R]S TYF VgI ;FWGM lJP VF.PV[;PVF.P
5|DF6LT H JF5ZJFGF ZC[X[P p5ZF\T4 V[JF ;FWGM S[ H[G[ RMSS; ;DI DIF"NFDF\ JF5ZJFGF CMI NFPTP
U|F.g0L\U JL, q 0L:S4 J[<0L\U .,[S8=M0 lJPGL V[S:5FIZL TFZLB HTL ZCL CMI TM T[ JF5ZJF GCL\P
s*f SF[g8=FS8ZF[V[ SFD NZlDIFG4 SFI"GF HF[BDM ;FD[ 5ZT]\ Z1F6 VF5L XS[ T[JF :8Fg00" AGFJ8GF
sVF.PV[;PVF.P 5|DF6LTf :JZ1F6FtDS ;[O8LGF ;FWGM T[DGF :8FOG[ 5]ZF 5F0JFGF\ ZC[X[ VG[ SD"RFZL q
SFDNFZ T[ ;FWG JF5ZLG[ SFI" SZ[ T[ wIFG ZFBJFGL HJFANFZL 9[SNFZGL ZC[X[P VFJF ;FWGF[GF p5IF[U lJGF
SFD SZJ]\ GCLP H]NF H]NF SFI"DF\qSFI" :Y/F[ p5Z JF5ZJF DF8[GF ;,FDlTGF ;FWGF[GL IFNL GLR[ D]HA K[P
;,FDlTGL ;FWGF[GL IFNL o
s!f;[[O8L C[[<D[8 o DFYFGF ;\Z1F6 DF8[
sZf;[[O8L UF[[U<; o VFB\ GF Z1F6 DF8 [
s#fO[.; ;L<0 o RC[ZFGF Z1F6 DF8[
s$f.IZ %,UqDO; o SFGGF Z1F6 DF8[
s5fV[5|F[G o XZLZGF Z1F6 DF8[
s&fC[g0 u,F[h o CFYGF 5|F[8[SXG DF8[
s*f ;[O8L X]h o 5UGF ;\Z1F6 DF8[
s(f;[[O8L A[[<8 o p\RF. 5Z SFD SZTL JBT[ 50L G HJFI T [ DF8[
s)f0:8 Z[[:5LZ[[8Z o 0:8JF/F lJ:TFZDF\ SFD SZTL JBT[
s!_f S[DLS, SF8L"h Z[;L5LZ[8Z o W]DF0F ;FD[ ;\Z1F6 D[/JJF DF8[
s!!f S[GL:8Z U[; DF:S o U[; ;FD[ ;\Z1F6 D[/JJF DF8[
s!Zf V[Z ;%,FI Z[:5LZ[8Z o 5|F6JFI]GL T\UL CF[I tIFZ[
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
s(f JHG pRSJF DF8[GF ;FWGF[sJ[.8 ,LO8L\U 8]<; q 8[S<;f GF[ T[DH T[GL ;FY[ ;\S/FI[, J:T]VF[ H[JL S[ OLSR;"4
:,L\"U4I]vS<F[d54VF. AF[<8 lJU[Z[GF[ p5IF[U SZTF 5C[,F ;,FDT K[ S[D T[ T5F;L BF+L SZL ,[JL p5ZF\T
JHG pRSTF 5C[,F T[ OLS; SZJ]\PVFJF ;FWGM NZ JZ;[ O[S8ZL V[S8 5|DF6[ 8[:8 SZFJLG[ ;8L"OF.0 SZ[, CMJ]
s)f p\RF. 5Z SFD SZJF DF8[GF DF\R0Fs:S[OF[<0L \Uf 5]ZTF DF5 TYF S[5[;L8L GF AF\WJF\P SF[.56 p\RF.GF :8=SRZ
p5Z SFD SZTL JBT[ ;[O8L A[<8GF[ p5IF[U SZJF[P
s!_f h[ZL TYF W0FSF ;FY[ ;/UL p9[ T[JF U[;GF AF8,FVF[sH[JF S[ VF[S;LHG4V[;L8L,LG4CF.0=F[HG4 V[DF[GLIF4
S,F[ZLG4 SFA"G 0FIF[S;F.0 ;L,Lg0Z lJU[Z[f G[ BF; SF/HL ,.G[ ;,FDT ZLT[ B;[0JF VF DF8[ BF; 8=F[,LGF[
p5IF[U SZJF[P VFJF U[; ;L,Lg0ZF[ ;FY[ SFD SZTF\ 5C[,F VG[ NZdIFG BF; ;,FDlTGF 5U,F\ ,[JFP U[;
;L,Lg0ZMG[ HDLG 5Z 3;0JF GCL
s!!f SFI" 5]~ SIF" 5KL SFDGL HuIFV[YL SF[8GJ[:84A/[, VF[.,qU|L;4J[<0L\U ZF[0GF 8]S0F4VgI GSFD] D8LZLI<;
VgI RLHJ:T]VF[ C8FJL ,[JL T[DH HuIF jIJl:YT VG[ ;FO SZLqSZFJL VF5JLP
s!Zf SF[.56 SFI" NZdIFG HF[ SF[. VS:DFT YFI TF[ T[GF[ ZL5F8" 5MTFGF ;[S;G DFZOT[ TFSLN[ SFDNFZ S<IF6
VlWSFZL q ;[O8L VMOL;ZG[ SZJF[P VF ZL5F[8" DF8[GF D]SZZ SZ[,F OF[D" G\PZ! DF\ EZJ]\P SFD SZTF\ VS:DFT
YI[, CMI 5Z\T] T[DF\ SM. .HF G Y. CMI T[JF AGFJGL ;[O8L VMOL;Z HF6 SZJFGL ZC[X[P
s!#f HMBDL CMI T[JF TDFD SFD DF8[ HGZ, ;[[O8L JS" 5ZDL8 ;\,uG BFTF DFZOT [ ;[O8L JEFU DF\YL 5]ZTF
;DI 5C[,FYL ,. ,[JL VG[ tIFZ AFN H SFD SZJ]\P
s!$f SMg8=FS8ZGF SFDGF 5ZOMZDg;DF\ YI[, VS:DFT qVFUGF AGFJ H[JL AFATMG[ wIFGDF\ ,[JFDF\ VFJX[P H~Z
50I[ SM5M"Z[XG VFJF V;]Z1FLT ZLT[ YTF\ SFD A\W SZFJL XSX[q SMg8=FS8 ZN SZL XSFX[P T[YL ;]Z1FF AFAT[ 5]Z[
5]ZL TS[NFZL ZFBJLP
s!5f SFI" NZlDIFG VFU S[ W]DF0M 5[NF YFI TM TFSLN[ A]hFJJF 5|ItG SZJM VG[ T]T"H OFIZ :8[XGDF\ HF6 SZJLP
s!&f p5ZMST lGIDM p5ZF\T ;]Z1FFG[ ,UTL ;ZSFZzL âFZF W0JFDF\ VFJ[, NZ[S SFINFSLI HF[UJF.VMG] \
T[VMV[ ;\5}6"56[ 5F,G SZJFG]\ ZC[X[P BF; SZLG[4 SFZBFGF WFZMv!)$( TYF U]PZFP SFZBFGF
lGIDv!)&#sK[<,F ;]WFZFVM ;lCTfDF\ SZJFDF\ VFJ[, NZ[S HF[UJF.VMG]\ R]:T56[ 5F,G SZJFG]\ ZC[X[P
p5ZF\T4 :YFlGS ;1FD VlWSFZL âFZF D]SZZ SZJFDF\ VFJ[, ;]Z1FFG[ ,UTF lGIDM q ;]RGM q 5wWlTVMG]\
5F,G SZJFG]\ ZC[X[P
s!*f p5ZF[ST lGIDF[G]\ R]:T56[ 5F,G SZJ]\P SF[.56 lGIDF[DF\ ;DH6 G 50[ VYJF DFU"NX"GGL H~Z H6FI TF[
;[O8L VMOL;ZGF[ ;\5S" ;FWJF[P
Addl. Chief Engineer (G)
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
FOLLOW GATE PASS PROCEDURE FOR CONTRACT WORKERS:
Step 1: Contractor must fill up the Application form for photo gate pass of Contractor & Contract workers which is
attached herewith. Full name of workers shall be mentioned as per id proof only.
Step 2: Contractor must attach aIl the documents as per list of documents which is mentioned in Application form
for photo gate pass.
Step 3: In case of emergency, temporary photo gate pass is to be issued by Security Officer only for three days
with prior permission of Factory Manager/Occupier only. More than three days, Permanent photo gate pass
procedure shall be completed by contract agency for their contract workers.
Step:4 Concern department Executive Engineer & Superintending Engineer must check /verify all relevant
documents as per work order & nature of work and list of documents as per application form for photo gate
pass and to sign in application form after documents verification and availability of PPEs and materials.
Step 5: Following mentioned documents must check/verify by Labour Welfare Officer (LWO) or HR Executive and
Industrial Relation Officer (IRO) of Power Station and then after sign in application for photo gate pass. Filled
Gate Pass Application Form and List of workers/Labours on party's letter head Copy of Work Order Copy of P. F.
Code No. Labour License IIMSW License Obtained for No. of Labours and validity thereof.
Guiarat BOCW registration in Form-II copy Insurance Policy as per subject of work order under the Workmen
Compensation Act,1923, Insurance Obtained for No. of Labours and validity thereof Contract agreements/
subletting work contract documents with competent authority approval copy Police verification copy of Id proof of
Aadhar card or Election voting card or driving license or Passport only GSECL 3D animation
Safety Induction movie showing attendance sheet copy
Step 6: After checking/verification of LWO & IRO, Certificate of Fitness of employment in hazardous process &
operations in form nO.33 of Gujarat Fadtories rules, 1963 shall be issue by GSECL Factory Medical Officer
for all contractor workers before commencement of work & examination responsibility shall be taken by
contractor as well as concerned Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form nO.32 as per GSECL Corporate Office guideline. Contractor
shall be fulfilled all health requirements before commencement of work. After completion of medical
examination in form no.32/33, GSECL Factory Medical Officer must be signed in application for photo gate
pass procedure format.
Step 7: Contract worker gate pass will be issued after completion of safety induction through 3D animation movie
& Training record is to be maintained in IMS/OHSAS training format by Training Centre / Efficiency Section.
Step 8: As per application for photo gate pass format, Electrical Safety Officer shall check /verify following
documents and then after sign in application format.
1. Electrical Contractor License, Form-I & Electrical trade person qualifications copy in Electrical work only
Qualification photocopy of Electric work Supervisor.
2. PPEs for Electrical work.
3. Safe Operating Procedure -SOP with JSA (Job Safety Analysis) signed documents for electrical work
4. Approved NABL laboratory calibration certificates of electrical measuring /testing equipment's /instruments if used.
Step 9: As per application for photo gate pass format, Safety Officer/Dy. Safety Officer shall check /verify following
documents and then after sign in application format.
1. List of Indian Standard or International Standard mark PPEs provided to contract worker in prescribe Format as per nature of hazardous
process and operations. Also check PPE undertaking of Contract Agency which submitted in work tender.
2. GSECL 3D animation Safety Induction movie showing attendance sheet copy
3. Safe Operating Procedure -SOP with JSA (Job Safety Analysis) signed documents
4. Qualification photocopy of work Supervisor, Safety supervisor, Safety Officer
5. Electrical Contractor License, Form-I & Electrical trade person qualifications copy in Electrical
6. Gujarat BOCW registration in Form-II copy if applicable
7. Form no.10: Prescribed for report of examination of the lifting machines like CPB, winch machine, wire rope
slings D-shackles, belt slings, chain slings, evebolts, polyester web/round slino etc of all capacities if used.
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
8. Driver license of LMW, Mobile crane, tractor, fork lift photo copy, RTO Fitness certificate in from no.33,
PUC certificate, Vehicle insurance policy, sparks arrestor if used.
9. Approved NABL laboratory calibration certificates of electrical/mechanical /Civil/C&II Environment survey/
Chemical etc. measuring /testing equipment's/instruments if used.
Step 10: Security Officer must check copy of Police Verification in resp~ttr6f each contract Workers and record
maintained in Security department.
Step 11: If any remarks put up by any officer, Security Officer will convey the remark details to Factory Manager &
Occupier and to take necessary action accordingly.
Step 12: Factory Manager of power station must check all documents as per GSECL gate pass issue policy and
to sign in application for photo gate pass.
Step 13: Security Officer shall maintain Gate pass issue record with application in Security department.
Step 14: photo gate pass shall be renewed after every three months. For easily understanding & implementing
work contract execution procedure in all GSECL power station, prescribe formats are attached herewith for ready
reference. Application Form for photo gate passes of Contractor & Contract workers.
GFR Form no.32: Health Register.
GFR Form no.33: Certificate of Fitness of employment in Hazardous process and operations.
Format for List of ISI/International Standard PPE provided to contract workers Format for Safety induction training
GFR Form no.1 0: Prescribed for report of examination of the lifting machines like CPB, winch machine, wire rope
slings D-shackles, belt sling.
Photo gate pass procedure must initiate by contractor before 10 days from actual execution of work at
GSECL Power Station
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
GUJARAT STATE ELECTRICITY CORPORATION LIMITEDAPPLICATION FORM FOR PHOTO GATE
PASSES OF CONTRACTOR & CONTRACT WORKERS
01 Name And Address Of The Firm
02 Name And Mobile No. Of The Contractor
& Site In-charge
03 Work Order No. & Date
04 Subject of Work
05 Name of Section
06 Duration/period of Work
07 Date of commencement
08 Contract agreements/ subletting work
contract documents with approval copy
09 Total No. of Workmen required for this work Local: Out State :
order (In Figure and words) is to be given on Male: Male:
letterhead of contractor Female: Female:
10 Labour License /IMSW License Obtained for
No. of Labours and validity thereof.
11 BOCW Registration No. and date
12 Insurance Obtained for No. of Labours and
validity thereof
13 Detail of P.F. Code No.
I, ……………………………………Prop./Manager/In-Charge of M/s. ……………………………….give assurance that
all the details related to labours as per the attached list herewith are true and also give assurance that none of the
labours are involved in any anti social activities or having criminal records. I am solely responsible if any dispute
will arise in future.
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber
For Office Use Only
Pass for the Work Order mentioned in the List attached herewith for the …………Nos. of Labours
for the period of ………………. to ……………………(03 months only).Documents are checked & verified as per
GSECL photo gate pass procedure.
Executive Engineer (MMD)
Superintending Engineer (KHEP)
Signature with Stamp Signature with Stamp
Labour welfare Officer/Industrial Relation Officer
Factory Medical Officer: to maintain record in form no.32 &
Electrical Safety Officer
Safety Officer/Dy. Safety Officer
Factory Manager/Occupier
To, Security Officer: To issue gate pass & maintain record of gate pass. If any remark put up by any
officer, it will convey to Factory Manager & Occupier. P.T.O
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Following details shall be provided by Contractor on his Company’s letter head
Work Order No.& Date:
Subject of Work:
No. of Labours:
Details of Contractor & Contract Labour
Sr. Full Name of Permanent Present Date of Employees PF Identification
No. Worker as per Address of Address of Birth / Code No. Mark on Body
id proof Worker Worker Age
LIST OF DOCUMENTS ARE ATTACHED WITH APPLICATION FOR PHOTO GATEPASSES
OF CONTRACTOR & CONTRACT WORKERS
Sr. Description of documents Attached
1 Copy of Work Order
2 Copy of P. F. Code No.
3 Insurance Policy as per subject of work order under the Workmen Compensation
4 Contract agreements/ subletting work contract documents with approval copy
5 Filled Gate Pass Application Form and List of Labours in 1 Copy.
6 Self-attested Copy of Id proof of Aadhar card or Election voting card or driving license or
7 List of Indian Standard or International Standard mark PPEs provided to contract worker
in prescribe Format as per nature of hazardous process and operations.
PPE undertaking of Contract Agency which submitted in work tender.
8 GSECL 3D animation Safety Induction movie showing attendance sheet copy
9 Final Safe Operating Procedure -SOP with JSA (Job Safety Analysis) signed documents
which submitted in work tender.
10 Qualification of work Supervisor, Safety supervisor, Safety Officer
11 Electrical Contractor License, Form-I& Electrical trade person qualifications copy in
Electrical work only which submitted in work tender.
12 Gujarat BOCW registration in Form-II copy if applicable
13 Form no.10: Prescribed for report of examination of the lifting machines like CPB, winch
machine, wire rope slings D-shackles, belt slings, chain slings, eyebolts, polyester
web/round sling etc of all capacities if used.
14 Driver license of LMW, Mobile crane, tractor, fork lift photo copy, RTO Fitness certificate
in from no.33, PUC certificate, Vehicle insurance policy, spark arrestor if used.
15 Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc. measuring /testing
equipment’s /instruments if used.
16 Copy of Police Verification in respect of each contract workers
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber Stamp
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
FORM -33 GUJARAT FACTORIES RULES-1963 A-409
(Prescribed under Rule-68-T and 102)
Certificate of Fitness of employment in Hazardous process and operation
(TO BE ISSUED BY FACTORY MEDICAL OFFICER)
1. Serial number in the Register of adult workers :
2. Name of the person examined :
3. Father’s Name :
6. Date of Birth if Available :
7. Name & Address of the Factory :
8. The worker is employed/proposed :
a. Hazardous process :
b. Dangerous operation :
I certify that I have personally examined the above named person whose identification
------------------- ---------------------------------and who is desirous of being employed in above
mentioned process/operation and that his/her, age, as nearly as can be ascertained
from my examination, is
In my opinion he/she is fit for employment in the said manufacturing process/operation.
In my opinion he/she is unfit for employment in the said manufacturing
process/operation for the reason --------------------------------------- She/he is referred for
further examination to Certifying Surgeon.
The serial number of previous certificate is-------------------------------------
Signature of left hand thumb Signature of the Factory
Medical Officer:
Impression of the person examined
Signature of contractor with seal
GUJARAT STATE ELECTRICITY
CORPORATION LIMITED
Kadana Hydro Electric Project, Diwada Colony, Taluka: Kadana,
Dist: Mahisagar –
E-mail: [email protected] Website: www.gsecl.in
Stamp of Factory
Medical officer with sign
(Prescribed under Rule 68-T and 102)
Health Register
1. Serial Number in the Register of adult Workers:
2. Name of worker:
4. Date of Birth:
1 Department work
2 Name of Hazardous process
3 Dangerous process/ operation
4 Nature of job or occupation
5 Raw materials, products or by-products
likely to be exposed to
6 Date of posting
7 Date of leaving/transfer to or transfer
8 Reason for discharge/ leaving or
Medical Examination and this results thereof
10 Signs and symptoms observed during
11 Nature of test & results thereof
12 Result Fit/Unfit
If declared unfit for work
13 Period of temporary withdrawal from
14 Reasons for such withdrawal
15 Date of declaring him unfit for that work
16 Date of issuing fitness certificate
17 Signature with date of the Factory
Medical officer/ the Certifying Surgeon
Note: 1. Separate page should be maintained for individual worker.
2. Fresh entry should be made for each examination.
Signature of contractor with seal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
MMD-Tender RFQ-72522.pdf
Revised Tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .