Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.8 L
Closing Date
7 Dec 2021, 4:00 pmClosed
Executive Engineer Electric Division Sopore
Electric Division Sopore
Augmentation of 100 KV Sub Station at Puj Mohalla Sultanpora by way of replace of old 100 KV to new 250 KVA Distribution Transformer Under MPLAD
2021_PDD_145394_2
88-EMDS Dated 28-10-2021
Open Tender
Electrical Works
Turn-key
30 days
Sopore
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Executive Engineer Electric Division Sopore
Exempted
10 Dec 2021
13 Nov 2021
9 Dec 2021
13 Nov 2021
7 Dec 2021
15 Nov 2021
13 Nov 2021 - 15 Nov 2021
Amount
Supply, Instiallation, testing, commissioning and Transportation of New 250KVA 11/0.433kV, 3-phase Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, (Copper wound) , and with LV Cable Box having detachable Gland plate (with 1 year warranty period)
Transportation with loading and unloading of old 100 KV transformer from site to Divisional Store Sopore.
Supply, Installation, Testing and Commissioning of gaples surge arrestor, 9KV, LA with polymer / Procilocian Station type (as per REC / DDUGJY standars)
Supply, Installation, Testing and Commissioning of 1.1 KV Grade PVC-Insulators Standed Conductor FRLS type 300mmsq Cable. (as per REC / DDUGJY standars)
M/s AHMADULLA AND SONS
SAHIBA ELECTRICALS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .