| 1 | L1₹40.1 CrAccepted-AOC | ₹40.1 Cr Quoted ₹41.2 Cr | L1 | Accepted-AOC This is L1 |
| 2 | L2₹41.3 CrRejected-Finance | ₹41.3 Cr | L2 | Rejected-Finance Rejected due to higher rate quoted. |
| 3 | L3₹41.5 CrRejected-Finance | ₹41.5 Cr | L3 | Rejected-Finance Rejected due to higher rate quoted. |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
16 Mar 2021, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Bahraich-Shrawasti Circle, PWD, Bahraich
Widening and Strengthing of Nanpara Shankarpur Lalpur Huzoorpur Road (MDR) Ch 65 to 86(100) Under Rajya Yojna in Financial Year 20-21 (Lok Sabha Bahraich_Kaiserganj)
2021_CEDPW_562504_1
327/8 Kam/e_tendering/2020-21 Dated 02-02-2021
Open Tender
Civil Works
450 days
Bahraich
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,154
₹50 L
Yes
Bahraich
16 Apr 2021
2 Mar 2021
17 Mar 2021
2 Mar 2021
16 Mar 2021
2 Mar 2021
4 Mar 2021
Excavation for road work in soil with hydaulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirement of lines grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Technical Specification clause 301.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per clause 305
Supply and Laying Local Sand filling including all labour T&P etc complete
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per clause 305
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate of Kabrai Quarry to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per clause 406
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate of Kabrai Quarry conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per clause 602
Stab. Wet Mix Macadam (with 3.50% emulsion and 1% OPC cement) Providing, laying, spreading and compacting graded stone aggregate of Kabrai Quarry to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver. as per clause 406.
Providing and applying tack coat with V.G. 10 bitumen using pressure distributor at the rate of 0.30 kg per sqm on prepared bituminous surface treated with primer. as per clause 503
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of Kabrai Quarry of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects as per clause 509.
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per clause 305
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per clause 304
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per clause 2100 12.4.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications as per clause 2504.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications as per clause 1300
Brick work with 150 class brick and 1:3 cement and coarse sand in super structure including cost of all labour materias, and T&P etc. required for proper completion of the work as per s.i. no.(307 (a)+309).
Providing laying & jointing of 900mm dia NP-3 Hume pipe including cost of pipe, callers and jointing with cement concrete 1:2:4 and spun yarn complete with all labour, materials ,T&P etc. as per direction of E/I.
Providing laying & jointing of 600mm dia NP-3 Hume pipe including cost of pipe, callers and jointing with cement concrete 1:2:4 and spun yarn complete with all labour, materials ,T&P etc. as per direction of E/I.
Plain/Reinforced Cement Concrete M-15 in Open Foundation complete as per Drawing and Technical Specifications. as per clause 1500, 1700 & 2100 case II
C.C. Work in Foundation with cement approved coarse sand and 2cm gauge stone ballast in the proportion of and also including supply of all materials, labour and T&P etc complete. (RCC Grade M-25) as per clause 1500, 1700 & 2100 case II
Furnishing and Placing Reinforced/ Prestressed cement concrete M-25 for Bed Block in super-structure as per drawing and Technical Specification as per clause 1500, 1700 & 2100
Furnishing and Placing Reinforced/ Prestressed cement concrete M-25 For Slab in super-structure as per drawing and Technical Specification as per clause 1500, 1700 & 2100
Furnishing and Placing Reinforced/ Prestressed cement concrete M-25 For Bearing Coat in super-structure as per drawing and Technical Specification as per clause 1500, 1700 & 2100
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification as per clause 1600.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications as per clause 1300/2200.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per clause 1300/2200.
Supply and laying one layer tarfelt in junction oe wall & slab including necessary overlap, giving a coat of mastic paint bellow the tarfelt and including supply of all material, labour and T&P etc complete. As per S.I.No.(544+545)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications as per clause 2706/2200.
Dewatring of surface/ground water including operational & running charges of diesel pump set complete.
Supply of local sand under foundation and floor including all material, labour and T&P etc complete
12m Bouring lowering and extraction including cost of all material, labour T&P and also including 90% depreciation value etc. required for proper completion of work.
P/L of 25-60 Kg stone boulder in U/S and D/S for protection of floor including cost of material labour T&P etc complete. as per clause 2504.
Providing and construction one span service road to reach Island Location one pier to another pier. (3x18Mtr. Well Foundation) as per clause 1200.
Providing and constructing Temporary Island 10m Dia for Construction of well foundation for 6.0m Dia well. (3x18Mtr. Well Foundation)
Providing and laying Cutting adge of mild Steel Weighing 40 Kg Per Meter for well foundation complete as per drawing and technical Specification (3x18Mtr. Well Foundation) as per clause 1200 & 1900.
Plain/Reinforced cement concrete , in well foundation,complete, as per drawing and technical Specification in well curb M-25 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2100
Plain/Reinforced cement concrete , in well foundation,complete, as per drawing and technical Specification.well Steining M-25 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2100
Plain/Reinforced cement concrete , in well foundation,complete, as per drawing and technical Specification, falls steining M-25 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2100
Plain/Reinforced cement concrete , in well foundation,complete, as per drawing and technical. Bottom Plugging M-25 Bottom Plug Con. to be placed using tremie pipe (Note: 10% extra cement added for under water Conc.) (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2100
Plain/Reinforced Cement Conc. In well foundation Complete as per drawing and technical. A. Intermediate Plugging Conc. To be placed using tremie pipe (Note: 10 % extra cement added for Under water Conce.) Under water Conce.) (3x18Mtr. Well Foundation)
Plain/Reinforced cement concrete , in well foundation,complete, as per drawing and technical. E- well cap M-30 (3x18Mtr. Well Foundation)
Sinking of 5.0 m.external diameter well through all typsof starts Nomly clayey soil and rock as shown against each case complete as per drawing and technical spec.depth of sinking is reckoned from bed level 0 to 3 Mtr. (3x18Mtr. Well Foundation) Section 1200 case I
Sinking of 5.0 m.external diameter well through all typsof starts Nomly clayey soil and rock as shown against each case complete as per drawing and technical spec.depth of sinking is reckoned from bed level 4 to 10 Mtr. (3x18Mtr. Well Foundation) Section 1200 case II
Sinking of 5.0 m.external diameter well through all typsof starts Nomly clayey soil and rock as shown against each case complete as per drawing and technical spec.depth of sinking is reckoned from bed level 11 to 13 Mtr. (3x18Mtr. Well Foundation) Section 1200 case III
Supplaying,fiting and placing uncoted HYSD bar reinforcement in foundation complete as per draw, and tech.spec, (3x18Mtr. Well Foundation) as per clause 1600.
Sand filing in wells complete as per drawing and technical Specifications. (3x18Mtr. Well Foundation) as per clause 1207.
Plain/Reinforced Cement concrete, in sub structure,complete as per drawing and technical. A) pier RCC Grade M-30 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2200.
Plain/Reinforced Cement concrete, in sub structure,complete as per drawing and technical. B) aboutment column RCC Grade M-30 (3x18Mtr. Well Foundation)
Plain/Reinforced Cement cone, in sub structure,compl.as per drawing and technical. C) aboutment Top beam RCC Grade M-30 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2200.
Plain/Reinforced Cement cone, in sub structure,complete as per drawing and technical. D) pier cap RCC Grade M-30 (3x18Mtr. Well Foundation)
Plain/Reinforced Cement cone, in sub structure,complete as per drawing and technical. E) back wall/ Wing wall RCC Grade M-30 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2200.
Plain/Reinforced Cement cone, in sub structure,compl.as per drawing and technical. F) Bearing pedestal RCC Grade M-30 (3x18Mtr. Well Foundation) as per clause 1500, 1700 & 2200.
Supplaying, fiting and placing uncoted HYSD bar reinforcement in found comp.as per draw,and tech.spec, a) pier (3x18Mtr. Well Foundation) as per clause 1600.
Supplaying, fiting and Fixing in position true to line and level elastomeric bearing conforming to be as per IRC 83 part II section IX Clause 2005 of MoRT & H Specification compl. as per. Drawing and technical. (3x18Mtr. Well Foundation)
Furnishing and placing Cement concrete M-40 grade including reinforcement in super structure complete as per drawing and technical specification. A) pre stressed beam M-40 (3x18Mtr. Well Foundation) as per clause 1500, 1600 & 1700
Furnishing and placing Cement concrete including reinforcement in super structure complete as per drawing and technical specification. B) Deck slab & Cross Beam M-40 Grade (3x18Mtr. Well Foundation)
Furnishing and placing Cement concrete wearing coat M-30 Grade including reinforcement in super structure complete as per drawing and technical specification. (3x18Mtr. Well Foundation) as per clause 2702.
PCC M-15 Grade levelingcourse below approch slab complete as per drawing and technical specification . B) PCC Grade M-15 (3x18Mtr. Well Foundation)
RCC approch slab including reinforcement and formwork complete as per drawing and technical specification. 1)RCC Grade M-30 (3x18Mtr. Well Foundation) as per clause 1500, 1600 & 1700
Construction of RCC railing of M 30 grade in -situ with 20mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500,centre to centre spacing between vertical post not to exceed 2000 mm leaving adequate space (3x18Mtr. Well Foundation) as per clause 2703, 1500, 1600, 1700
Supplying fitting and placing HYSD bar reinforcement.in Super Strcture complete as per drawing and technical specifications. (3x18Mtr. Well Foundation)
Drainage Spouts complete as per drawing and technical specification. (3x18Mtr. Well Foundation)
Elastomeric Slab seal expension joint providing and laying of elastoric slab seal joint catering to right of skew (less than 20 Deg.) Moderately curved with Maximum horizontal Movement up to 50mm complete as per drawing and standerd specification to be installed by the Manufacture / Supplier or. their authorize representative ensuring compliance to the Manufacture's instruction for installation and claues2606 of MoRT & H spcification . (3x18Mtr. Well Foundation)
Painting on cocrete surface Providing and applying 2 coats of water based paint to unplasterd concrete sureface ofter cleaning the sureface of dirt ,dus,oil,grease etc. efflorescence and applaying paint @ 1lter for 2 sqm. (3x18Mtr. Well Foundation)
M/s Chopra Traders
JAI SHAKTI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid