Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAdmitted-Finance KADAKAMPALLI HOUSE PERINGALA MULAKUZHA CHENGANNUR ALAPPUZHA DISTRICT 689505 | ALAPPUZHA | KERALA | 689505 | L1 | Admitted-Finance | |
| 2 | L2₹43.9 L+₹21,575.80 (0.49%)Admitted-Finance ERA 114 TC 36 819 PERUMTHANNI ERAVIPEROOR VALLAKADAVU POST THIRUVANANTHAPURAM 695008 | THIRUVANANTHAPURAM | KERALA | 695008 | L2 | Admitted-Finance | |
| 3 | L3₹45.9 L+₹2.2 L (4.97%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rohas Ventures Pvt Ltd L2 | HONEYCOMB CONSTRUCTIONS L3 | BIJU. K.K L1 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORK | ||||||
| 1.01SITE CLEARANCE | ||||||
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 176 | sqm | 18 ₹3,168 Lowest | 20 ₹3,520 | 18 ₹3,168 Lowest |
| 1.03EARTH WORK AND EXCAVATION | ||||||
| 1.04 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 127.22 | cum | 359 ₹45,671.26 Lowest | 360 ₹45,798.48 | 359 ₹45,671.26 Lowest |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m | 101.77 | cum | 318 ₹32,364.13 Lowest | 340 ₹34,603.16 | 318 ₹32,364.13 Lowest |
| 1.06 | Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 32.94 | cum | 729 ₹24,014.72 Lowest | 760 ₹25,035.92 | 729 ₹24,014.72 Lowest |
| 1.07PCC | ||||||
| 1.08 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 20.54 | cum | 7,932 ₹1,62,939.14 Lowest | 8,300 ₹1,70,498.6 | 7,932 ₹1,62,939.14 Lowest |
| 1.09RCC | ||||||
Tender Value
₹44.0 L
EMD Value
₹50,000
Closing Date
2 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Vice President
HLL LIFECARE LIMITED Hi-Care Division Corporate Head Office, Poojappura. P. O,Thiruvananthapuram 695012, Kerala
Construction of New Building for Janakeeya Arogya Kendra Main Centre Karthikappally at Alappuzha District,
2026_HCDPS_881038_1
HLL/CMO/HCD/JAK/KPLY/ALP/26-27
Open Tender
Civil Works - Buildings
Item Rate
Karthikappally, Alappuzha District
Please refer Tender documents.
19 documents required · 19 mandatory
₹2,950
₹50,000
17 Nov 2026
19 Oct 2026
3 Nov 2026
19 Oct 2026
2 Nov 2026
19 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | - | - |
| - | SITE CLEARANCE | - | - | - | - |
| - | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 176 | sqm | - | - |
| - | EARTH WORK AND EXCAVATION | - | - | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 127.22 | cum | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m | 101.77 | cum | - | - |
| - | Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 32.94 | cum | - | - |
| - | PCC | - | - | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 20.54 | cum | - | - |
| - | RCC | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TEDOKTPLY.pdf
Tender Documents • 2.93 MB
BOQ_1498571.xls
BOQ • 0.42 MB
DATEXTENSION.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .