| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-Finance SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹6.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.3 LAccepted-Finance THANIMOLAL HOUSE MEENANGADI WAYANAD | MEENANGADI | WAYANAD | KERALA | ₹8.3 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Akhil Paul L2 | AA AND S CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Investigation | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 5,600 | sqm | 10 ₹56,000 | 2 ₹11,200 |
| 1.00 | OD48512/2025-2026:Conducting topographic survey in banks of river for taking cross sections at suitable intervals and preparing contour maps showing 2 m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale (plan, cross sections, longitudinal sections etc), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of soft copies CD/DVD, 5 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (out turn 3 hect/day) | 15 | Hectare | 4,000 ₹60,000 | 6,000 ₹90,000 |
| 1.00 | OD48513/2025-2026:Conducting topographic survey in river for taking cross sections at suitable intervals and preparing contour maps showing 2 m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale (plan, cross sections, longitudinal sections etc), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of soft copies CD/DVD, 5 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (out turn 6 hect/day) | 6 | Hectare | 4,000 ₹24,000 | 6,000 ₹36,000 |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 2 | set | 15,798 ₹31,596 | 28,000 ₹56,000 |
| 1.00 | 56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc. | 20 | Day | 2,087 ₹41,740 | 100 ₹2,000 |
| 1.01 | 56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required) | 60 | sqm | 698 ₹41,880 | 500 ₹30,000 |
| 1.01 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 10 | Bore Holes | 3,000 ₹30,000 | 3,000 ₹30,000 |
| 1.01 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 80 | metre | 923 ₹73,840 | 769 ₹61,520 |
| 1.01 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 80 | metre | 900 ₹72,000 | 770 ₹61,600 |
Tender Value
₹9.0 L
EMD Value
₹22,418
Closing Date
27 Feb 2026, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer Irrigation Subdivision Alappuzha
GENERAL Investigation Estimate Construction of Neendakara and Karumanchery bridge in ward no 1 Kodamthuruth Panchayath of Aroor LAC General Civil Work
2026_Irrig_838407_1
IRR/IA/TR/421/2022_5_1_1/1
Open Tender
Civil Works - Others
90 days
Kodamthuruth panchayath
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,980
Yes
₹22,418
Yes
13 Mar 2026
20 Feb 2026
3 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Investigation
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD48512/2025-2026:Conducting topographic survey in banks of river for taking cross sections at suitable intervals and preparing contour maps showing 2 m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale (plan, cross sections, longitudinal sections etc), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of soft copies CD/DVD, 5 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (out turn 3 hect/day)
OD48513/2025-2026:Conducting topographic survey in river for taking cross sections at suitable intervals and preparing contour maps showing 2 m interval contours using Total station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale (plan, cross sections, longitudinal sections etc), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of soft copies CD/DVD, 5 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (out turn 6 hect/day)
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.c.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.b:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1412405.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.41 MB
BOQ_1412405.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid