| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.7 LAdmitted-Finance | -11.21% | ₹24.7 L | L1 | Admitted-Finance |
Tender Value
₹27.8 L
EMD Value
₹55,660
Closing Date
20 Aug 2026, 6:00 pmClosed
EE PWD DIV SULTANPUR
EE PWD DIV SULTANPUR
GSB road construction work from Surela Khedli Ghata road towards Sarola
2026_CEPWD_583511_1
EE PWD DIV SULTANPUR NITNO-27/2026-27
Open Tender
Civil Works
Percentage
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV SULTANPUR
₹55,660
Yes
24 Aug 2026
13 Aug 2026
21 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 0.88 | Hectare | - | - |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 9,012.53 | Cum | - | - |
| 3 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge | 937.5 | Cum | 1 | ₹936.56 |
| 4 | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading II Material | 2,318.75 | Cum | - | - |
| 5 | Excavation for Structures Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 98.81 | Cum | - | - |
| 6 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | 97.71 | Cum | - | - |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C grade M 20 | 99.39 | Cum | - | - |
| 8 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | 1.2 | Tonne | - | - |
| 9 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 1000 mm dia | 22.5 | Rmt | - | - |
| 10 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 300 mm dia | 30 | Rmt | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
Tendernotice_2.pdf
PDF • 1.39 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1036457.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .