| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.6 LAccepted-Finance 1103 ARUNACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 11000 | 11000 | ₹32.6 L | L1 | Accepted-Finance Quoted lowest amount. |
| 2 | L2₹38.4 LRejected-Finance | ₹38.4 L | L2 | Rejected-Finance Quoted higher amount than L1. |
| 3 | L3₹38.5 LRejected-Finance B 3 KRISHNA PARK SOCIETY SAI CHOKDI MANJALPUR VADODARA 390011 | VADODARA | GUJARAT | 390011 | ₹38.5 L | L3 | Rejected-Finance Quoted higher amount than L1. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified because required documents not submitted as per ATC. |
| 5 | Rejected-Technical 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | - | - | Rejected-Technical Technically disqualified because required documents not submitted as per ATC. |
| Sl No | Description | Qty | Unit | sovereign enterprise L1 | OM SAI INFRASTRUCTURE L3 | ABHUJI PANAJI VANZARA L2 |
|---|---|---|---|---|---|---|
| 1.00Execution of work under following items | ||||||
| 1.01 | Towards the carefully dismantling/removing the damaged/broken Stone members manually means including stacking of serviceable and disposal of unserviceable material within 50 meters lead and lift up to 10 meters as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 6.25 | Cu.mt. | 2,250 ₹14,062.50 | 3,000 ₹18,750 | 3,000 ₹18,750 |
| 1.02 | Towards the carefully removing the old brick work from the stone structure and cleaning the surface including disposal of rubbish to the dumping ground within 50 meters lead and lift up to 10 meters as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 4.5 | Cu.mt. | 5,000 ₹22,500 | 5,000 ₹22,500 | 5,000 ₹22,500 |
| 1.03 | Towards the carefully removing the old plaster or tiles or both from the stone structure and cleaning the surface 3 including disposal of rubbish to the dumping ground within 50 meters lead as per the direction of Site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 60.33 | Sq.mt. | 898 ₹54,176.34 | 1,100 ₹66,363 | 1,100 ₹66,363 |
| 1.04 | Towards the Coursed rubble masonry (first sort) with hard stone in foundation and plinth with: Cement mortar 1:6 (1 cement: 6 coarse sand) below the 5.00 mts. from the ground level including carrage of the materials with lead up to 30 meters and lift up to 20 meters approx. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 16.31 | Cu.mt. | 11,500 ₹1.9 L | 12,500 ₹2.0 L | 12,500 ₹2.0 L |
| 1.05 | Towards the Stone work ashlar sunk or molded or ornamental design or sunk, ornamental design and molded as per existing design style and texture up to floor five level in lime sand surkhi mortar 1:1:1 (1) Lime: 1 sand: 1 Surkhi )and fixing of SS clamp including pointing with white lime sand surkhi mortar 1:1:1 5 (Lime :1 sand: I Surkhi) with an admixture of pigment matching the stone shade including carrage of the materials with lead & lift up to 30 meters approx etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 1.82 | Cu.mt. | 1,20,000 ₹2.2 L | 1,22,180 ₹2.2 L | 1,20,179 ₹2.2 L |
| 1.06 | Towards the Stone work in changing architectural member like pillar, lintel etc as per existing design style and texture in lime sand surkhi mortar 1:1:1 (1 Lime:1 sand: 1 Surkhi )and fixing of SS clamp including pointing with white lime sand surkhi mortar 1:1:1 (1 Lime:1 sand: 1 Surkhi) with an admixture of pigment matching the stone shade after removing the old one including carriage of the materials with lead & lift up to 30 meters approx. etc. all complete as per the direction of the site-in-charge (Including all the materials & labour charges etc. complete as direction by site in charge) | 4.43 | Cu.mt. | 1,10,100 ₹4.9 L | 1,15,900 ₹5.1 L | 1,25,000 ₹5.5 L |
| 1.07 | Towards the steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position. And applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (make should be approved before execution of work) including carrage of the materials with lead & lift up to 30 meters approx etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 2,672.7 | Kg | 220 ₹5.9 L | 250 ₹6.7 L | 250 ₹6.7 L |
| 1.08 | Towards providing and fixing double scaffolding system. (cup lock type) on the exterior side of building/structure, up to 25 meter height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 meter center to center, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc., wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note: - (1) The elevation area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. (Including all the materials & labour charges etc. complete as direction by site in charge) | 270 | Sq.mt. | 350 ₹94,500 | 398 ₹1.1 L | 398 ₹1.1 L |
| 1.09 | Towards provision for providing support of wooden (teakwood quality column) section 250mmX250mm up to 3 m height and fixing wooden plank 50mmX250mm up to 1 m length at top & bottom of column at stone members during changing the damaged stone members including all complete as per the direction of site-in-charge. (all wooden members will be hand over to the department after completion of the work) including carriage of the materials with lead & lift up to 30 meters approx. etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 10 | EACH | 74,000 ₹7.4 L | 80,750 ₹8.1 L | 76,821 ₹7.7 L |
Tender Value
₹32.4 L
EMD Value
₹81,061
Closing Date
23 Apr 2026, 2:00 pmClosed
Superintending Archaeologist
Superintending Archaeologist, Puratattva Bhavan, Nr Central Library, Mandvi, Vadodara
Towards the carefully dismantling/removing the damaged/broken Stone members,old brick work from the stone structure and cleaning the surface, old plaster or tiles or both from the stone structure and cleaning the surface, etc. as mentioned in boQ.
2026_ASI_904376_1
97/MBS/AHD/2025-26-C-13
Open Tender
Civil Works
180 days
Asarva, Ahmedabad
Please refer tender documents.
8 documents required · 8 mandatory
₹0
₹81,061
Yes
4 May 2026
2 Apr 2026
24 Apr 2026
2 Apr 2026
23 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Execution of work under following items | ||||||
| 1.01 | Towards the carefully dismantling/removing the damaged/broken Stone members manually means including stacking of serviceable and disposal of unserviceable material within 50 meters lead and lift up to 10 meters as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 6.25 | Cu.mt. | 2,239.23 | ₹13,995.19 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Towards the carefully removing the old brick work from the stone structure and cleaning the surface including disposal of rubbish to the dumping ground within 50 meters lead and lift up to 10 meters as per direction of Engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 4.5 | Cu.mt. | 4,521.02 | ₹20,344.59 | BI01010001010000000000000515BI0100001114 |
| 1.03 | Towards the carefully removing the old plaster or tiles or both from the stone structure and cleaning the surface 3 including disposal of rubbish to the dumping ground within 50 meters lead as per the direction of Site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 60.33 | Sq.mt. | 875.74 | ₹52,833.39 | BI01010001010000000000000515BI0100001115 |
| 1.04 | Towards the Coursed rubble masonry (first sort) with hard stone in foundation and plinth with: Cement mortar 1:6 (1 cement: 6 coarse sand) below the 5.00 mts. from the ground level including carrage of the materials with lead up to 30 meters and lift up to 20 meters approx. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 16.31 | Cu.mt. | 11,340.62 | ₹1,84,965.51 | BI01010001010000000000000515BI0100001116 |
| 1.05 | Towards the Stone work ashlar sunk or molded or ornamental design or sunk, ornamental design and molded as per existing design style and texture up to floor five level in lime sand surkhi mortar 1:1:1 (1) Lime: 1 sand: 1 Surkhi )and fixing of SS clamp including pointing with white lime sand surkhi mortar 1:1:1 5 (Lime :1 sand: I Surkhi) with an admixture of pigment matching the stone shade including carrage of the materials with lead & lift up to 30 meters approx etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 1.82 | Cu.mt. | 1,14,166.89 | ₹2,07,783.74 | BI01010001010000000000000515BI0100001117 |
| 1.06 | Towards the Stone work in changing architectural member like pillar, lintel etc as per existing design style and texture in lime sand surkhi mortar 1:1:1 (1 Lime:1 sand: 1 Surkhi )and fixing of SS clamp including pointing with white lime sand surkhi mortar 1:1:1 (1 Lime:1 sand: 1 Surkhi) with an admixture of pigment matching the stone shade after removing the old one including carriage of the materials with lead & lift up to 30 meters approx. etc. all complete as per the direction of the site-in-charge (Including all the materials & labour charges etc. complete as direction by site in charge) | 4.43 | Cu.mt. | 1,04,673.5 | ₹4,63,703.61 | BI01010001010000000000000515BI0100001118 |
| 1.07 | Towards the steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position. And applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (make should be approved before execution of work) including carrage of the materials with lead & lift up to 30 meters approx etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 2,672.7 | Kg | 190.86 | ₹5,10,111.52 | BI01010001010000000000000515BI0100001119 |
| 1.08 | Towards providing and fixing double scaffolding system. (cup lock type) on the exterior side of building/structure, up to 25 meter height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 meter center to center, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc., wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note: - (1) The elevation area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. (Including all the materials & labour charges etc. complete as direction by site in charge) | 270 | Sq.mt. | 374.04 | ₹1,00,990.8 | BI01010001010000000000000515BI0100001120 |
| 1.09 | Towards provision for providing support of wooden (teakwood quality column) section 250mmX250mm up to 3 m height and fixing wooden plank 50mmX250mm up to 1 m length at top & bottom of column at stone members during changing the damaged stone members including all complete as per the direction of site-in-charge. (all wooden members will be hand over to the department after completion of the work) including carriage of the materials with lead & lift up to 30 meters approx. etc. all complete as per the direction of the site-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 10 | EACH | 75,917.82 | ₹7,59,178.2 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.49 MB
matabhawani.pdf
Tender Documents • 3.47 MB
BOQ_950569.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid