Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹33.3 LAccepted-AOC | ₹33.3 L | L3 | Accepted-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 787 Dated 29-10-2025 |
| 2 | L1₹33.1 LRejected-Finance | ₹33.1 L | L1 | Rejected-Finance Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 782 Dated 29-10-2025 |
| 3 | L2₹33.3 LRejected-AOC | ₹33.3 L | L2 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 787 Dated 29-10-2025 |
| 4 | L3₹33.3 LRejected-AOC | ₹33.3 L | L3 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 787 Dated 29-10-2025 |
| 5 | L3₹33.3 LRejected-AOC | ₹33.3 L | L3 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 787 Dated 29-10-2025 |
| Sl No | Description | Qty | Unit | M/S Amol Constructions L2 | ER Gemin Yomso L3 | M/S K.P.ENTERPRISE L3 | M/S ARG L4 | M/S B M Enterprise L3 | M/s Dura Enterprise L3 | M/S M K Bosing Traders L1 | M/s Tintin Enterprise L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SH : - Deep Boring. | |||||||||||
| 1.01 | Drilling 8" dia bore by processing DTH cum ODEX 6" casing system Rig in boulder formation and during the casing pipe through the boulder and hard rock and cutting small size boulder a man key hammering. This item includes cost of hire of machinary & fuel etc. wages of operation tools and plants welding the casing pipe required making arrangement of initial required i/c disposalnof spoils etc. from soil/boulder formation, sample should be collected at every merers depth or where there is a change of strata in sample bores with the distinguishing mark properly as directed (for boulder formation)(85.00 M depth)
(a) 85.00 M Depth | 85 | Mtr | 10,000 ₹8.5 L | 16,350 ₹13.9 L | 10,460 ₹8.9 L | 11,000 ₹9.3 L | 11,000 ₹9.3 L | 10,460 ₹8.9 L | 11,850 ₹10.1 L | 16,350 ₹13.9 L |
| 1.02 | Providing and supplying including installation of following materials i/c loading, unloading , carriage etc.. complete supply & lowering of 3 HP Submersible pump and fitting with clamp, safty, cable, MS clamp made of MS flat & I.T Panel board capacity to run the pump etc. placing at suitable position etc. complete. | 1 | Job | 2,00,000 ₹2 L | 52,500 ₹52,500 | 2,50,000 ₹2.5 L | 60,000 ₹60,000 | 3,12,500 ₹3.1 L | 2,50,000 ₹2.5 L | 56,900 ₹56,900 | 52,500 ₹52,500 |
| 2.00SH : - Construction of elevated reservior. | |||||||||||
| 2.01 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and
watering and then disposing of all surplus soil as directed within a lead of 50m. | 25.63 | Cum | 360 ₹9,226.80 | 320 ₹8,201.60 | 350 ₹8,970.50 | 355 ₹9,098.65 | 353 ₹9,047.39 | 350 ₹8,970.50 | 377.71 ₹9,680.71 | 320 ₹8,201.60 |
| 2.02 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 13 | Cum | 6,000 ₹78,000 | 5,320 ₹69,160 | 5,020 ₹65,260 | 5,938.3 ₹77,197.90 | 5,938 ₹77,194 | 5,020 ₹65,260 | 6,353.98 ₹82,601.74 | 5,320 ₹69,160 |
| 2.03 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 15 | Cum | 9,000 ₹1.4 L | 7,948 ₹1.2 L | 9,020 ₹1.4 L | 8,848.9 ₹1.3 L | 8,849 ₹1.3 L | 9,020 ₹1.4 L | 9,468.32 ₹1.4 L | 7,948 ₹1.2 L |
| 2.04 | Reinforcement of RCC Work i/c bending binding and placing in position complete.
(b) Cold twisted bars. | 110 | Kg | 110 ₹12,100 | 105 ₹11,550 | 100 ₹11,000 | 108.9 ₹11,979 | 110 ₹12,100 | 100 ₹11,000 | 116.52 ₹12,817.20 | 105 ₹11,550 |
| 2.05 | Wrought Iron and Mild Steel Welded Work (Wrought iron and mild steel welded work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately) | 9.55 | Qtl. | 11,745 ₹1.1 L | 10,487 ₹1.0 L | 11,000 ₹1.1 L | 11,745 ₹1.1 L | 11,745 ₹1.1 L | 11,000 ₹1.1 L | 13,441.66 ₹1.3 L | 10,487 ₹1.0 L |
| 2.06 | Applying priming coat with ready mixed primer of approved brand and manufacture on steel work. | 50.49 | Sqm | 60 ₹3,029.40 | 59 ₹2,978.91 | 55 ₹2,776.95 | 59 ₹2,978.91 | 66 ₹3,332.34 | 55 ₹2,776.95 | 70.62 ₹3,565.60 | 59 ₹2,978.91 |
Updated dates
Tender Value
₹37 L
EMD Value
₹37,000
Closing Date
23 Oct 2025, 10:00 amClosed
Executive Engineer, Pasighat Municipal Council
Executive Engineer, Pasighat Municipal Council, Pasighat, PO.PS-Pasighat District East Siang, Arunachal Pradesh, PIN-791102
Augmentation of water supply at Burial cum Cremation ground 21-mile Jarku area Pasighat, East Siang, Arunachal Pradesh (SH - Construction elevated reservoir, deep boring, distribution lines and allied)
2025_PMC_2809_1
PMC/EE /XV-FC-22/2021-22/12
Open Tender
Civil Works
182 days
21-Mile Jarku area Pasighat
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,000
EE PMC Pasighat
₹37,000
30 Oct 2025
14 Oct 2025
23 Oct 2025
14 Oct 2025
23 Oct 2025
14 Oct 2025
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_3003.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TenderDoc.pdf
Tender Documents • 1.69 MB
BOQ_3003.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid