Executive Engineer Nadiad Irrigation Division Nadiad
Constructing New Box type Barrel in Place of Existing VRB @ 22600 On Matar Branch Canal.(Pij to Dabhan)
292936
Tender Notice No. 26 of 2025-2026
Open
Civil - All
Kheda
6 documents required · 5 mandatory · 1 optional
₹2,400
Executive Engineer Nadiad Irrigation Division Nadiad
₹83,000
2 Apr 2026
2 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
BILL OF QUANTITIES
Name of CONSTRUCTING NEW BOX TYPE BARREL IN PLACE OF EXISTING VRB @ 22600' ON MATAR
BRANCH CANAL (PIJ TO DABHAN)
Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft & hard
murrum etc. in dry condition including depositing
the excavated stuff in uniform layers in banks or as
1 and where directed etc. complete for lead upto 500 CUM 1076 107.80
m and all lift. (BY MACHINERY) - Including
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
2 directed with all lead & lift etc complete Without CUM 183 3346.00
Dewatering and excluding cost of steel
reinforcement. (A) For Foundation concrete /
General purpose(a) C. C. Nominal Mix, M-10 and
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
3a dewatering and excluding the cost of steel CUM 536 4190.00
reinforcement.(A) For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.(a) Concrete
grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
3b dewatering and excluding the cost of steel CUM 111 4651.00
reinforcement.(A) For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping etc.(e) Concrete grade M-25 and
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
3c dewatering and excluding the cost of steel CUM 152 5642.00
reinforcement.(E) For Column / Beam / Solid Slab
of Road Bridge / Barrel / Cutoff wall / Approch
Slab etc.(q) Concrete grade M-25 and MSA-20 mm
BILL OF QUANTITIES
Name of CONSTRUCTING NEW BOX TYPE BARREL IN PLACE OF EXISTING VRB @ 22600' ON MATAR
BRANCH CANAL (PIJ TO DABHAN)
Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
3d directed with all lead & lift etc complete without CUM 29 5481.00
dewatering and excluding the cost of steel
reinforcement.(D) For Kerb / Wearing coat.(n)
Concrete grade M-25 and MSA -10 to 20mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
3e directed with all lead & lift etc complete without CUM 5 8023.00
dewatering and excluding the cost of steel
reinforcement.(F) For Perapet wall of Road Bridge
/ Structure.(t) Concrete grade M-25 and MSA -10
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
3f directed with all lead & lift etc complete without CUM 17.04 4811.00
dewatering and excluding the cost of steel
reinforcement.(B) For Key Wall(i) Concrete grade M-
20 and MSA 20 mm
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
4 necessary, hooking etc. complete as per drawing for MT 30.2 82019.00
all lead and lifts. TMT / CRS (FE 500D)
Providing and fixing in position pre-moulded
asphalt or bitumen cork board of approved quality
and specifications as per design and drawing.
Providing and fixing in position P.V.C. heavy duty
water stops in barrels, troughs and wing walls with
25 mm wide expansion joint as shown in drawing
including filling the joints with asphalt pad or
6 bitumen cork board of approved quality. (Asphalt meter 26 587.70
pad or bitumen cork board will be paid
seperatly)225 mm WIDE P.V.C. WATER STOP
Providing and filling the polysulphide joint sealent
of the approved make in the expansion and
7 contraction joints in the c.c. lining including meter 36 181.20
clearing the joints with air water jet.
Providing and fixing 110 mm diameter P.V.C..Pipe
8 (6 kgf / sqcm) Water spout with necessary iron meter 11 369.20
gratting as per design
Back filling the foundation trenches around the
structures etc with selected excavated stuff
including watering, ramming, compacting etc.
complete. (By Machinery)
BILL OF QUANTITIES
Name of CONSTRUCTING NEW BOX TYPE BARREL IN PLACE OF EXISTING VRB @ 22600' ON MATAR
BRANCH CANAL (PIJ TO DABHAN)
Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing and fixing in position 1.80 m high above
finished ground level canal data boards of standard
size 1.20m x 0.90m with M.S. angle 40mm x 40mm
x 6mm with 3mm thick iron plate in 1:5:10
10 proportion concrete block size 40cm x 40cm x 75 No 2 3103.00
cm including painting existing data on the board
etc. complete as directed.
Wall Painting (two Coats) with plastic emulsion
paint of approved brand & manufacture on
undecorated wall surface to give an even shade
11 including throughly brushing the surface free from sqmt 89 78.90
mortar dropping & other foreign matter & sand
papered smooth .
Earth work in embankment using selected soil, soft
& hard murrum excavated from approved borrow
area / village tanks etc. Including conveying,
spreading in uniform layers, breaking clods and
12 dressing to the designed canal section etc. with lead CUM 1680 91.75
upto 1.500 km and all lift.(For canals having
capacity beyond 300 Cusec) ( By Machinery )
Compaction for making embankment for canal by
laying in regular layers of 15 cm in thickness
including breaking clods to 25 mm size incl. light
rolling by suitable rollers with slight watering to
13 facilitate rolling and dressing the side slopes etc. CUM 1680 27.70
Providing and laying plain/reinforced cement
concrete lining of M 15 (MSA 20 mm) in bed, side
slopes and curvature including batching, mixing,
transporting, placing, vibrating, smooth finishing,
14 curing including dewatering where sqmt 143 808.90
required.(Manually with Conventional Mixer)20 cm
thick lining in slope - with water curing
Dismantling the R.C.C. work and disposing off the
stuff including stacking of the useful materials etc.
15 complete as directed.Heavy Reinforcement ( Main CUM 92.5 2021.60
bar above 16 mm. dia. )
Dismantling the R.C.C. work and disposing off the
stuff including stacking of the useful materials etc.
complete as directed.Light Reinforcement ( Main bar
upto 16 mm. dia. )
Dismantling the existing brick masonry including
sorting out and stacking the useful material and
removing the debries and making good the damages
etc. complete as directed. In Cement Mortar
BILL OF QUANTITIES
Name of CONSTRUCTING NEW BOX TYPE BARREL IN PLACE OF EXISTING VRB @ 22600' ON MATAR
BRANCH CANAL (PIJ TO DABHAN)
Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing temporary all weather and fair weather
diversion suitable for traffic during the construction
period of the structure including providing
necessary drain diversion and all safty measures Jobwor
including red lamps/ signals at night for traffic etc. k
Rs. Eighty Two Lac Fifty Eight Thousand Eighty Two & Eighty Nine Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs. ______
Net Tender amount Rs. ______________ Net Tender amount Rs.
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: MIS102010/17/K-1
Dated 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Signature of contractor. Deputy Executive Engineer
Matar Irrigation Sub Division
Divisional Accountant Exectutive Engineer
Nadiad Irrigation Division Nadiad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Front Page.pdf
2 Notice inviting online tender.pdf
3 SBD Book.pdf
4 BOQ.pdf
5 Cement Requirement.pdf
6 Steel Requirement.pdf
7 Prise Escalation.pdf
8 Other Specification.pdf
9 Item Wise Specification.pdf
10 Tender Notice No.26 of 2025-26.pdf
Download all tender documents and submit your bid