| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.3 L+₹40,753 (5.15%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
₹8.6 L
EMD Value
₹21,449
Closing Date
15 Nov 2023, 6:55 pmClosed
AEE - WSSD - AVK
ASSISTANT EXECUTIVE ENGINEER, WATER SUPPLY SUB-DIVISION, ARUVIKKARA
Jal Jeevan Mission TWSS JJM Aruvikkara Panchayath Providing additional 5 MLD to AVK Pt. Urgent reconstruction of damaged portion of 72 MLD Wash Water channel near the culvert and river bank.
2023_KWA_618625_1
05/2023-24/WSSD-AVK
Open Tender
Civil Works - Others
Item Rate
120 days
ARUVIKKARA
Refer tender conditions.
4 documents required · 4 mandatory
₹1,895
Yes
₹21,449
Yes
29 Nov 2023
3 Nov 2023
17 Nov 2023
3 Nov 2023
15 Nov 2023
3 Nov 2023
Amount
working charges
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
100.52.S.1:Sub Data for providing Earth filled cement bags including cutting of the Earth, filling, conveying and placing in position.
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.23.4.13:Laying 500mm. A. C. pressure pipes class 25 kg/cm2 after conveying within initial lead carefully lowering into trenches placing in position ready for jointing, lighting, watching and providing caution boards etc., complete (excluding cost of pipe).
ARUN A
Bidder Name
K.K.Chandra sekharan Nair
ARUN A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_928623.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .