Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance KUJJU WEST MURPA SANJAY KUMAR PUBLIC HIGH SCHOOL MANDU DISTT RAMGARH JHARKHAND | MANDU | RAMGARH | JHARKHAND | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 LAdmitted-Finance | ₹2.0 L | L2 | Admitted-Finance |
| 3 | L3₹2.2 LAdmitted-Finance KATRASGARH BOKARO 828113 JHARKHAND INDIA | BOKARO | BOKARO | JHARKHAND | 828113 | ₹2.2 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SINHA SALES & SERVICES L2 | M/S OM ENGINEERING L3 | CHANDAN AUTO ELECTRICAL ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 2.00 | Steel work in built up sections framed work,including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer using structual steel etc as required in gratings,frames,guard bar,ladder,railings,brackets,gates and similar works | 1,553.98 | kg | 116.8 ₹1.8 L | 120 ₹1.9 L | 116.8 ₹1.8 L |
| 3.00Foundation Bolt making | ||||||
| 4.00 | A)industrials Gas DA | 2 | cumtr | 785 ₹1,570 | 900 ₹1,800 | 700 ₹1,400 |
| 5.00 | B) Oxygen Cylinder | 4 | cumtr | 325 ₹1,300 | 400 ₹1,600 | 300 ₹1,200 |
| 6.00 | C) Semi Skilled Manpower-2 x 2 shift x 2 days | 8 | nos | 632 ₹5,056 | 632 ₹5,056 | 632 ₹5,056 |
| 7.00 | D) Unskilled Manpower 2 x 2 shift x 2 days | 8 | nos | 546 ₹4,368 | 546 ₹4,368 | 546 ₹4,368 |
| 8.00 | E) HT Bolt size 100mm x 24mm x 10mm (length x dia x height),full thread 2mm pitch | 14 | nos | 180 ₹2,520 | 210 ₹2,940 | 160 ₹2,240 |
| 9.00 | CPOH@10% | 1 | L/S | 1,481.4 ₹1,481.40 | 20,224 ₹20,224 | 1,481.4 ₹1,481.40 |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | nos | - | - | - |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
22 Dec 2025, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Making and Fabrication of 02 nos of Base plate of 2000GPM Pump installed at mines of Karma Project Under Kuju Area.
2025_CCL_349340_1
GM (K)/EnM/eTender/25-26/165
Open Tender
Electrical and Maintenance Works
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹3,000
21 Jan 2026
12 Dec 2025
23 Dec 2025
12 Dec 2025
22 Dec 2025
12 Dec 2025
12 Dec 2025 - 19 Dec 2025
Steel work in built up sections framed work,including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer using structual steel etc as required in gratings,frames,guard bar,ladder,railings,brackets,gates and similar works
Foundation Bolt making
A)industrials Gas DA
B) Oxygen Cylinder
C) Semi Skilled Manpower-2 x 2 shift x 2 days
D) Unskilled Manpower 2 x 2 shift x 2 days
E) HT Bolt size 100mm x 24mm x 10mm (length x dia x height),full thread 2mm pitch
CPOH@10% (mailto:CPOH@10% 塹ᴻ䡿ⲯ嶂藄挧ꮥ)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_362075.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid