Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.0 LAccepted-AOC | ₹88.0 L | L1 | Accepted-AOC L1 Bidder admitted |
| 2 | L2₹93.7 L+₹5.7 L (6.51%)Rejected-AOC | ₹93.7 L+₹5.7 L (6.51%) | L2 | Rejected-AOC L2 Bidder rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified as per Contract conditions |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified as per Contract conditions |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified as per Contract conditions |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
16 Jan 2024, 4:00 pmClosed
CHIEF ENGINEER KSHB
Chief Engineer Kerala State Housing Board Santhinagar, Thiruvananthapuram
-Medical Gas Pipeline System works for the Development of Government Taluk Hospital Thuravur at Alappuzha District..
2023_KSHB_632343_1
2023_CE_KSHB_28(Ele)
Open Tender
Electrical Works
Item Rate
60 days
Taluk Hospital Thuravur at Alappuzha District..
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,195
₹50,000
17 Oct 2024
16 Dec 2023
19 Jan 2024
16 Dec 2023
16 Jan 2024
16 Dec 2023
Amount
PIPING DESIGN
od149830/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.15 mm
od149831/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.22 mm
od149832/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.28 mm
od149833/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.35 mm
od149834/2023_2024 : Supply, Instllation, testing and commissioning of following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.54 mm
od149835/2023_2024 : Supply, Instllation, testing and commissioning of following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.76 mm
od149837/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.5 Gas - O2, Air 4, N2O, Air 7, CO2 and 1 Vac
od149838/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.3 Gas - O2, Air 4, N2O and 1 Vac
od149839/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.2 Gas - O2, Air 4 and 1 Vac
od149840/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.1 Gas - O2 and 1 Vac
od149843/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - VAC
od149844/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - N2O
od149845/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - MA7
od149846/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - MA4
od149847/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - co2
od149848/2023_2024 : Supply, Instllation, testing and commissioning of following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - AGSS
od149856/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.VAC
od149857/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.MA4
od149858/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.MA7
od149859/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.CO2
od149860/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.AGSS
od149861/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.Theater Vacuum Units
od149862/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.O2
od149863/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.N2O
od149864/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.Ward Vacuum Units
od149877/2023_2024 : Supply, Installation, testing, and commissioning of Master Plant Alarm Panel (post source), BMS compatible with all accessories required for complete installation.
od149878/2023_2024 : Supply, Installation, testing, and commissioning of Oxygen Flowmeters with humidifier bottles.
od149995/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 76mm
od149996/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 54mm
od149997/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers and straight couplings joining the pipes by flux less silver brazing method for copper to copper on wall / ceiling by using suitable and strong enough supports, as per requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008.42 mm
od149998/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 35mm
od149999/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 28mm
od150000/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 22mm
od150001/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 15mm
od150002/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 12 mm
od150456/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - O2
OXYGEN SUPPLY
od149880/2023_2024 : Supply, Installation, testing, and commissioning of Emergency Oxygen Manifold of capacity 1 Banks X 6 Cylinders complete with tailpipes, NRV, relief valve, fixing chain etc.
od149881/2023_2024 : Supply, Installation, testing and commissioning of Emergency Oxygen Supply System with flow regulator: Supply, Installation, testing, and commissioning of Emergency Oxygen manifold complete with middle frame cylinder. Emergency Oxygen Supply System as per technical specifications. Should comply with the standards of ISO 7396/HTM 02-01
od149882/2023_2024 : Supply, Installation, testing, and commissioning of Oxygen Manifold of capacity 2 X 6 Cylinders complete with tailpipes, NRV, relief valve, fixing chain, etc.
od149883/2023_2024 : Supply, Installation, testing, and commissioning of Fully Automatic Main Oxygen supply system: Supply, Installation, testing, and commissioning of Fully Automatic gas control panel with a flow capacity of 1332 LPM at 5 bar regulating/Supply pressure. Should have the connectivity of the Cylinder service and liquid oxygen plant. (As per technical specification Standard: ISO 7396 / HTM 02-01).
N2O SUPPLY
od149888/2023_2024 : Supply, Installation, testing, and commissioning of Emergency Nitrous Oxide Manifold of capacity 1 Banks X 2 Cylinders complete with tailpipes, NRV, Relife valve, fixing chain, etc.
od149889/2023_2024 : Supply, Installation, testing and commissioning of Emergency N20 Supply System with flow regulator: Supply, Installation, testing, and commissioning of Emergency Oxygen manifold complete with middle frame cylinder. Emergency Oxygen Supply System as per technical specifications. Should comply the standards of ISO 7396/HTM 02-01
od149890/2023_2024 : Supply, Installation, testing, and commissioning of Nitrous Oxide Manifold of capacity 2 Banks X 2 Cylinders complete with tailpipes, NRV, relief valve, fixing chain etc.
od149891/2023_2024 : Supply, Installation, testing, and Commissioning of Nitrous Oxide Fully Automatic gas control panel: This should meet the minimum flow of 583 LPM and complies with iso 7396/HTM 02-01.
CO 2 SUPPLY
od149933/2023_2024 : Supply, Installation, testing and commissioning of Emergency Co2 Supply System with flow regulator: Supply, Installation, testing and commissioning of Emergency Oxygen manifold complete with middle frame cylinder. Emergency Oxygen Supply System as per technical specifications. Should comply the standards of ISO 7396/HTM 02-01.
od149934/2023_2024 : Supply, Installation, testing, and commissioning of Carbon Dioxide Manifold of capacity 2 Banks X 1 Cylinders complete with tailpipes, NRV, relief valve, fixing chain, etc.
od149935/2023_2024 : Supply, Installation, testing and commissioning of Carbon Dioxide Fully Automatic gas control panel: Should meet the minimum flow of 583 LPM and complies with iso 7396/HTM 02-01.
od151138/2023_2024 : Supply, Installation, testing, and commissioning of Emergency Carbon Dioxide Manifold of capacity 1 Banks X 1 Cylinder complete with tailpipes, NRV, Relife valve, fixing chain, etc.
MEDICAL AIR PLANT
od149943/2023_2024 : Supply, Installation, testing, and commissioning of 2 sets of Medical Grade Air purification systems as per the technical specification and air quality according to European pharmacopea.Full System should be in accordance with HTM 02-01 /ISO 7396 standard.
od149944/2023_2024 : Supply, Installation, testing, and commissioning of Air receiving tank of capacity 1000 Lit including drain valve and valves required with all accessories required for complete installation as per the technical specification.
od149945/2023_2024 : Supply, Installation, testing, and commissioning of Compressed air plant system, lubricated air cooled, fixed speed rotary screw compressor complete with 10 HP Motor, maximum working pressure of 10 Bar with all accessories required for complete installation as per the technical specification.
MEDICAL VACCUM PLANT
od149946/2023_2024 : Supply installation testing and commissioning of Bed Head Horizontal Wall Panel: Supply installation testing and commissioning of 1500mm Horizontal Bed Head Panel with European CE certificate for ICU Category.
od149947/2023_2024 : Supply installation testing and commissioning of Bed Head Horizontal Wall Panel: Supply installation testing and commissioning of 1000mm Horizontal Bed Head Panel with European CE certificate for Wards.
od149948/2023_2024 : Supply installation testing and commissioning of Bed Head Horizontal Wall Panel: Supply installation testing and commissioning of continuous Horizontal Bed Head Panel with a European CE certificate.
od149949/2023_2024 : Supply, Installation, testing and commissioning of the electrical control panel for 2 X Compressors & 2 vacuum plants with complete accessories as mentioned in technical specifications.
od149950/2023_2024 : Supply, Installation, testing, and commissioning of 1 set of double bacteria filter units + 1 secretion trap as per technical specification.
od149951/2023_2024 : Supply, Installation, testing, and commissioning of Vaccum tank of capacity 1500 Lit including valves required with all accessories required for complete installation as per the technical specification.
od149952/2023_2024 : Supply, Installation, testing, and commissioning of Air Vacuum Pump system, double cylinder, single stage, Air-cooled type, suitably mounted on M.S. Channel base frame to delivery by 3 Phase (AC), 440 Volts, TEFC Electric Motor complete with V-Belt gaurd & DOL starter, 1000 RPM speed, 55 C.F.M. Piston displacement, Max Vaccum referred to 30" barometer with closed intake 29" 65 HG, Moor capacity 7.5 HP with all accessories required for complete installation as per the technical specification.
Blaze Systems and Services
Arasan Gas Solutions
Pulse Medi Tech
HOSTECH PROJECT MANAGEMENT CONSULTANTS PRIVATE LIMITED
Bidder Name
Blaze Systems and Services
Arasan Gas Solutions
Hitech Med Gas Solutions
Pulse Medi Tech
HOSTECH PROJECT MANAGEMENT CONSULTANTS PRIVATE LIMITED
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_957911.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .