| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.1 LAccepted-Finance | 1 | Accepted-Finance OK | |
| 2 | 2₹14.1 L+₹6,796 (0.48%)Accepted-Finance GANGYAL JAMMU | 2 | Accepted-Finance OK | |
| 3 | 3₹14.1 L+₹7,911 (0.56%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 3 | Accepted-Finance OK | |
| 4 | 4₹14.2 L+₹13,584 (0.97%)Accepted-Finance BHAGWATI NAGAR JAMMU | 4 | Accepted-Finance OK |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
7 Jul 2022, 4:00 pmClosed
EXECUTIVE ENGINEER PHE DIVISION RAJOURI
OFFICE OF EXECUTIVE ENGINEER PHE DIVISION RAJOURI
Annual Rate Contract for repair/maintenance of Horizontal Centrifugal pumps Submersible Pumps and Induction/Submersible motors of different capacities with allied works installed at various pumping stations under Jal Shakti PHE Mechanical Division Ra
2022_PHE_174600_3
31 of 2022-23
Open Tender
Miscellaneous Works
Item Rate
365 days
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
MH 0215
₹25,000
Yes
20 Aug 2022
18 Jun 2022
8 Jul 2022
18 Jun 2022
7 Jul 2022
22 Jun 2022
Amount
Horizontal Centrifugal Pump RKB Make
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage)
Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impeller as per sample
Providing and fitting of C.I Impeller as per sample
Repairing of brass Impeller
Repairing of C.I Impeller
Fabrication & fitting of neck ring.
Fabrication & fitting of diffuser bush
Fabrication of Stainless steel gland bush
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plate
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of ball thrust bearing-7307
Replacement of ball thrust bearing-7308
Replacement of ball thrust bearing-7309
Providing and fitting of diffuser
Replacement of Roller bearing-N-307
Replacement of Roller bearing-N-308
Replacement of Roller bearing-N-309
Providing & Fitting of Oil seal
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop.
Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop.
Dismantling & fitting of Pump (Beyond 10 stage) at work Shop.
Horizontal Centrifugal Pump Mather & Platt Make
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage)
Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impellers as per sample
Providing and fitting of C.I Impellers as per sample
Repairing of brass Impellers
Repairing of C.I Impellers
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication of Stainless steel gland bushes
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing/Fitting of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of ball thrust bearing-6306
Replacement of Roller bearing-NU-306
Providing & Fitting of Oil seal
Fabrication & fitting of balancing plate
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop.
Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop.
Dismantling & fitting of Pump (Beyond 10 stage) at work Shop.
Horizontal Centrifugal Pump KSB Make
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage)
Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impellers as per sample
Providing and fitting of C.I Impellers as per sample
Repairing of brass Impellers
Repairing of C.I Impellers
Fabrication & fitting of neck ring.
Fabrication & fitting of body bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing/Fitting of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of ball thrust bearing-7309
Replacement of ball thrust bearing-7308
Providing & Fitting of Oil seal
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop.
Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop.
Dismantling & fitting of Pump (Beyond 10 stage) at work Shop.
Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (100 mm dia)
Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (125 mm dia)
Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (150 mm dia)
Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (175 mm dia)
Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (200 mm dia)
Horizontal Centrifugal Pump FNC Make
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage)
Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage)
Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impellers as per sample
Providing and fitting of C.I Impellers as per sample
Repairing of brass Impellers
Repairing of C.I Impellers
Fabrication & fitting of neck ring.
Fabrication & fitting of body bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of Roller bearing-N-204
Replacement of Roller bearing-N-205
Providing & Fitting of Oil seal
Fabrication & fitting of balancing plate
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop.
Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop.
Dismantling & fitting of Pump (Beyond 10 stage) at work Shop.
Submersible Pump {V-8}
Repairing of pump shaft by welding, turning, polishing & making of key ways
Fabrication / providing of pump shaft as per exact size & specification
Fabrication / providing of Impeller
Repairs to Impeller
Fabrication / providing of Neck Ring
Fabrication / providing of Body Bush
Fabrication / providing of Guide Bush
Fabrication / providing of Spacer Bush
Fabrication / providing of Cotter
Fabrication / providing of Coupling pulley with cotter for V-8 submersible pump
Fabrication / providing of Pump Body along with studs
Fabrication / providing of intermediate bowl body
Fabrication / providing of Suction Body
Fabrication / providing of NRV with adaptor for V8 pump
Fabrication / providing of flanged adaptor with threading at other end for V8 pump
Dismantling and fitting charges of V-8 submersible pump at work Shop
Submersible Pump {V-6}
Rep+B169:B191airing of pump shaft by welding, turning, polishing & making of key ways
Fabrication / providing of pump shaft as per exact size & specification (up to 5 stage)
Fabrication / providing of S.S. pump shaft as per exact size & specification (6 stage to 10 stage)
Fabrication / providing of pump shaft as per exact size & specification (11 stage to 15 stage)
Fabrication / providing of S.S. pump shaft as per exact size & specification (Beyond 20 stage)
Fabrication / providing of impeller
Providing/Fitting of V-6 plastic impeller
Repairs to Impeller
Fabrication / providing of Neck Ring
Fabrication / providing of Body Bush
Fabrication / providing of Guide Bush
Fabrication / providing of Spacer Bush
Fabrication / providing of Cotter
Fabrication / providing of Pump Body
Fabrication / providing of Suction Body
Fabrication / providing of Coupling pulley with cotter for V-6 Submersible motor
Fabrication / providing of intermediate bowl body
Dismantling and fitting charges of pump (up to 5 stage)
Dismantling and fitting charges of pump (6 stage to 10 stage) at work Shop
Dismantling and fitting charges of pump (11 stage to 15 stage) at work Shop
Dismantling and fitting charges of pump (Beyond 15 stage) at work Shop
Submersible Pump {V-4}
Repairing of pump shaft by welding, turning, polishing & making of key ways
Fabrication / providing of pump shaft as per exact size & specification
Fabrication / providing of impeller
Providing/Fitting of V-4 plastic impeller
Repairs to Impeller
Fabrication / providing of Neck Ring
Fabrication / providing of Body Bush
Fabrication / providing of Guide Bush
Fabrication / providing of Spacer Bush
Fabrication / providing of Cotter
Fabrication / providing of Coupling pulley with cotter
Fabrication / providing of Pump Body
Fabrication / providing of Suction Body
Dismantling and fitting charges of V-4 submersible pump at work Shop.
Miscelleanous
Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side
Fabrication & providinf of 65 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side
Fabrication & providing of MS Clamp 2½"
Fabrication & providing of MS Clamp 3"
Fabrication & providing of MS Clamp 4"
Fabrication & providing of MS Clamp 6"
Fabrication of Shling for holding of 05 Ton capacity Chain block for same load
Providing and Fabrication of GI column pipes of 100 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.
Providing and Fabrication of GI column pipes of 80 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.
Providing and Fabrication of GI column pipes of 65 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.
Providing and Fabrication of Top column pipe of 100 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size.
Providing and Fabrication of Top column pipe of 80 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size.
Fabrication of Top column pipe of 65 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size.
Fabrication of Foundation Bolts 21 No.welded with extended Steel and Chuck Nut
Fabrication of Foundation Bolts 24 No.welded with extended Steel and Chuck Nut
Fabrication of Foundation Bolts 27 No.welded with extended Steel and Chuck Nut
Fabrication of Foundation Bolts 32No.welded with extended Steel and Chuck Nut
Replacement by providing & fitting of bearing-7307 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing-7308 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing-7309 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing-6209 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing-6212 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing-6213 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing NU-204 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing NU-205 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing NU-206 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing NU-208 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing NU-308 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing NU-309 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing N- 6305 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6306-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6307-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6308-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6309-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6310-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6311-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6312-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing 6313-ZZ (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing - 6314 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing - 6315 (SKF/NBC/FAG/Reputed make)
Replacement by providing & fitting of bearing - 6316 (SKF/NBC/FAG/Reputed make)
Providing//Fitting Star Coupling Complete L-150 (Reputed Make)
Providing//Fitting Star Coupling Complete L-190 (Reputed Make)
Providing//Fitting Star Coupling Complete L-225 (Reputed Make)
Providing//Fitting Star Coupling Complete L-226 (Reputed Make)
Providing & fitting of 50 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 65 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 80 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 100 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 150 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 50 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 65 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 80 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 100 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing & fitting of 150 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make)
Providing of Gland Packing of assorted size 8mm, 10mm, 12mm (Champion/Reputed Make)
Providing of Rubber insertion Sheet (Reputed Make )
Providing of Nut Bolts of assorted size & length (19 no.,21 no.,24 no. 27 no. etc.)
Providing of Puncher Roll (Reputed Make)
Providing of Insulation Tape (Reputed Make)
Repairs to V-4 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges.
Repairs to V-6 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges.
Repairs to V-8 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set.Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges.
Repairs to V-4 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges.
Repairs to V-6 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges.
Repairs to V-8 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set.P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges.
Repair to submersible Motor (V-6) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repair to submersible Motor (V-8) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair to 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 20 HP to 50HP motor by way of replecement of bearing at DE end and assembling of motor.
Repair to 51 HP to 100HP motor by way of replecement of bearing at DE end and assembling of motor.
Repair to 20 HP to 50HP motor by way of replecement of bearing at NDE end and assembling of motor.
Repair to 51 HP to 100HP motor by way of replecement of bearing at NDE end and assembling of motor.
Repair to 20 HP to 50HP motor by way of replecement of bearing at DE and NDE end and assembling of motor.
Repair to 51 HP to 100HP motor by way of replecement of bearing at DE and NDE end and assembling of motor.
Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriage upto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle and carriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (Up to 7 stages) (Carriage on HL up to a lead of 0-500 mtr.)
Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriage upto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle and carriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (Up to 7 stages) (Carriage on HL up to a lead of 0-1000 mtr.)
Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriage upto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle and carriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (7 stage to 14 stage) (Carriage on HL up to a lead of 0-500 mtr.)
Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriage upto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle and carriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (7 stage to 14 stage) (Carriage on HL up to a lead of 0-1000 mtr.)
Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-4) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour.
Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour.
Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour.
Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour.
Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour.
Loading of damaged Submersible Motor (V6) from site of work by way of head load carriage to Mechanical Transport and carriage back to site of work after repairing and unloading at site.
Loading of damaged Submersible Motor (V8) from site of work by way of head load carriage to Mechanical Transport and carriage back to site of work after repairing and unloading at site.
HITECH MECHNICALS
G S ENGINEERING WORKS
BEE AAR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .