| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 CrAccepted-AOC | ₹24.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹25.6 CrRejected-Finance | ₹25.6 Cr | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | J and J ASSOCIATES L1 | Creators Constructions L2 |
|---|---|---|---|---|---|
| 1.00Site Development work - Site clearing works | |||||
| 1.01 | 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 9,830 | sqm | 10 ₹98,300 | 10 ₹98,300 |
| 1.02 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 9,830 | sqm | 19 ₹1.9 L | 20 ₹2.0 L |
| 1.03 | 2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 90 | each | 555 ₹49,950 | 577 ₹51,930 |
| 1.04 | 15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 35.31 | cum | 2,145 ₹75,750.67 | 2,228 ₹78,681.82 |
| 1.05 | 15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 17.26 | cum | 2,559 ₹44,170.90 | 2,659 ₹45,897 |
| 1.06 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 5,921 | cum | 265 ₹15.7 L | 275 ₹16.3 L |
| 2.00Retaining walls and RR Step Gallery | |||||
| 2.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 4,214.26 | cum | 265 ₹11.2 L | 275 ₹11.6 L |
| 2.02 | 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 970.35 | cum | 132 ₹1.3 L | 137 ₹1.3 L |
Tender Value
₹20.0 Cr
EMD Value
₹5 L
Closing Date
25 Apr 2025, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Site Development, Indoor Stadium, Swimming pool, Natural Football Turf, Maple wood, Hostel Building, Sump, Pump Room, Filter tank, storage tank, filtration, Flood lighting, Sprinkler system, Fire Protection, Substation, Septic tank, Electrification
2025_SKF_758291_1
03/SKF/CE/2025-26
Open Tender
Civil Works - Others
365 days
Kottayam
Please refer tender document
19 documents required · 19 mandatory
₹17,700
₹5 L
29 Oct 2025
3 Apr 2025
28 Apr 2025
3 Apr 2025
25 Apr 2025
3 Apr 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid