Executive Engineer Panchayat R&B Division BOTAD
Construction of Library Hall at Village Rangpar Ta. Botad Dist. Botad
345961
Nivida 14 Fourth Attempt
Open
Civil Works - Buildings
Works
Botad
5 documents required · 0 mandatory · 5 optional
₹900
Executive Engineer Panchayat Road and Building Division,BOTAD
₹6,000
17 Sept 2026
17 Sept 2026
17 Sept 2026
29 Sept 2026
17 Sept 2026
Name of Work :- Construction of Library Hall at Village Rangpar Ta. Botad Dist. Botad
Memorandum showing items of works to be carried out
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
1 20.250 Cum Excavation for foundation upto 1.5 122.94 Rupees One One
M depth including sorting out and Hundred Twenty Cubic
stacking of useful materials and Two and Paise metre
disposing of the excavated stuff Ninety Four only
2 3.670 Cum Providing and laying cement 3805.29 Rupees Three One
concrete 1:2:4 and curing complete Thousand Eight Cubic
excluding the cost of form work in Hundred Five and metre
(A) Foundation and plinth. (up to 10 Paise Twenty
3 3.960 Cum Brick work using common burnt 4214.33 Rupees Four One
clay building bricks having crushing Thousand Two Cubic
strength not less than 35 kg./Sq.Cm. Hundred Fourteen metre
in foundation and plinth in Cement and Paise Thirty
Mortar 1:6 (1- Cement : 6 -fine
sand)(B) Conventional
4 4.050 Cum Providing and laying controlled C.C. 4118.65 Rupees Four One
M-200 and curing complete Thousand One Cubic
excluding the cost of formwork and Hundred Eighteen metre
reinforcement for reinforced and Paise Sixty
concrete work in (A) foundation
footing Base of column and mass
5 2.990 Cum Provinding and laying controlled 8954.34 Rupees Eight One
C.C. M-200 and curing complete Thousand Nine Cubic
including the cost of formwork but Hundred Fifty metre
excluding cost of reinforcement for Four and Paise
Thirty Four only
reinforced concrete work in column
6 2.740 Cum Provinding and laying controlled 7664.59 Rupees Seven One
C.C. M-200 and curing complete Thousand Six Cubic
including cost of form work but Hundred Sixty metre
excluding cost of reinforcement for Four and Paise
Fifty Nine only
reinforced concrete work in Beam.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
7 13.710 Cum Filling available excavated earth 136.92 Rupees One One
(excluding rock) in trenches, plinth, Hundred Thirty Cubic
sides of foundation etc. in layer not Six and Paise metre
exceeding 20 cm. In depth Ninety Two only
consolidating each deposited layer
by raming and watering.
8 10.850 Cum Brick work using common burnt 4255.31 Rupees Four One
clay building bricks having crushing Thousand Two Cubic
strength not less than 35 Kg./Smt. In Hundred Fifty metre
super structure above plinth level Five and Paise
Thirty One only
upto floor two level in cement
mortar 1:6 (1 cement :6 fine sand)
(B) Conventional
9 0.390 Cum Providing and laying controlled 11432.95 Rupees Eleven One
cement concrete M-200 for R.C.C Thousand Four Cubic
LINTEL including the cost of Hundred Thirty metre
formwork with curing etc. complete Two and Paise
excluding the cost of reinforcement up Ninety Five only
to floor all level
10 0.460 Cum Providing and Laying cement concrete 4152.59 Rupees Four One
1:3:6 (1-Cement , 3:- Coarse sand : 6- Thousand One Cubic
Crushed stone aggregate 20 mm Hundred Fifty metre
nominal size ) and curing Complete Two and Paise
including cost of formwork in (A) Fifty Nine only
wall caps / Coping.
11 0.330 Cum Providing and laying controlled 6477.36 Rupees Six One
cement concrete M-200 and curing Thousand Four Cubic
complete including the cost of Hundred Seventy metre
formwork but excluding the cost of Seven and Paise
reinforcement for R.C.C work in Thirty Six only
CHHAJJA including finishing the
exposed surface to give smooth &
even surface centering and formwork
& curing complete.
12 3.000 Cum Providng and laying controlled 8703.08 Rupees Eight One
cement concrete M-200 and curing Thousand Seven Cubic
complete including the cosr of form Hundred Three metre
work but excluding the cost of rein and Paise Eight
forcement for R.C.C work in Slab
up to floor all level.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
13 1095.690 Kg Providng thermo mechanically 77.29 Rupees One
treated bars FE 500D bar Seventy Seven Kilogram
reinforcement for R.C.C. work and Paise Twenty
including bending binding and Eight only
placing in position etc. complete for
all floor level.
14 12.320 Cum Filling in foundation and plinth with 301.78 Rupees Three One
murrum or selecred soil in layer of Hundred One and Cubic
20 cm.thickness including watering Paise Seventy metre
ramming and consolidation ane etc. Eight only
15 5.400 Sqm Providing and fixing Alluminium 4040.00 Rupees Four One
windows having three track section Thousand Forty Squere
92 mm x 31.55 mm ,shutter section and Paise Zero metre
40 mm x 18 mm mounted on only
bearing to slide on track colour
anodized in 20 micron in approved
shade including 5 mm clear plate
glass, PVC track gasket, EPDM
rubber gasket on glass of weather
tightening along with locks, handle
including sealing gap with marble
surfaces with silicon sealants
making it water proof in al manner
etc. comp. as per architect's details
at all floor levels.(powder coated)
16 2.100 Sqm Providing and fixing 35 mm thick 3327.85 Rupees Three One
panelled ,glazed or panelled and Thousand Three Squere
glazed shutters, for Doors windows Hundred Twenty metre
and clearstory windows including Seven and Paise
Eighty Five only
black enamelled M.S. But hinges
with necessary screws. (A) Plywood
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
17 135.000 Kg Providing and fixing M.S. Grills of required 207.86 Rupees Two One
pattern to wooden frames of windows etc. Hundred Seven Kilogram
with M.S. flats at required spacing and and Paise Eighty
frame alround ,square or round bars with Six only
round headed bolts and nuts or by screws
(A)Plain Grill.Providing fusion bonded
Epoxy coating not less than 175 micron
thickness and up to 300 micron to
reinforcement bars as per IS-13620-
1993/ASTM-775 M including testing of
coating at plant and all taxes (A) 10mm to
18 110.540 Sqm 20mm thick sand faced cement 342.41 Rupees Three One
plaster on wall up to height Hundred Forty Squere
10meters above ground level Two and Paise metre
consisting of 12mm thick backing Forty One only
coat of C.M. 1:3 (1 cement : 3 sand)
and 8mm thick finishing coat of
C.M. 1:1 (1 cement : 1 sand) etc.
19 24.530 Sqm Providing 15 mm thick cement 222.66 Rupees Two One
plaster in single coat on Rough/ Hundred Twenty Squere
(Similar) Side of Single or half brick Two and Paise metre
wall for interior plastering up to Sixty Six only
two floor and finished even and
smooth in cement mortar 1:4 (1
cement : 4 sand) (A) up to all floor
20 76.470 Sqm Providing 15 mm thick cement 222.66 Rupees Two One
plaster in single coat on Rough / Hundred Twenty Squere
(Similiar) side of single or half brick Two and Paise metre
walls for interior plastering up to Sixty Six only
floor two level and finished even
and smooth in (ii) cement mortar 1:4
(1 cement : 4 sand) including of neat
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
21 23.210 Sqm Providing and laying 24" x 24" 1264.41 Rupees One One
vitrified 8MM thick tile flooring Thousand Two Squere
over 20MM (average) base of Hundred Sixty metre
cement mortar 1:6 (1- Cement : 6- Four and Paise
Coarse Sand) on new surface or
fixing on existing flooring by adhe-
sive material including
dismentalling of existing flooring
and jointed with colour cement
slurry including finished with flush
pointing and cleaning the surface
etc. complete. For Light shade
22 6.260 Sqm Providing and laying Kota stone 1090.70 Rupees One One
slab Flooring over 20 mm (average) Thousand Ninety Squere
base of cement mortar 1:6 (1- and Paise Seventy metre
Cement, 2- Coarse sand ) or L.M. only
1:1.5 (1- Lime Putty : 1.5- Coarse
Sand ) laid and jointed with gray
cement slurry including rubbing and
polishing complete (A) Marbale
23 110.540 Sqm Finishing wall with weather proof 120.26 Rupees One One
exterior emulsion paint on wall Hundred Twenty Squere
surface(two coats) to give an and Paise Twenty metre
required shape even shade after Six only
thoroughly brushing the surface to
remove all dirt, and remains of loose
powdered materials etc complete
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
24 24.530 Sqm Wall painting (two coats) with 165.99 Rupees One One
plastic emulsion paint of approved Hundred Sixty Squere
brand and manufacture on Five and Paise metre
undecorated wall surface to give an Ninety Nine only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered
smooth.Extra over item 57 for every
subsequent coat of wall painting
with plastic emulsion pain of
approved brand. Applying two
coats of Birla (white cement based)
or Asian (acrylic lapy- putty) or
equivalent & two coats of primer of
approved brand and manufacture on
new wall surface to give an even
shade including thoroughly brushing
the surface free from mortar
dropping and other foreign matter
and sand papered smooth.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
25 76.470 Sqm Wall painting (two coats) with 171.52 Rupees One One
plastic emulsion paint of approved Hundred Seventy Squere
brand and manufacture on One and Paise metre
undecorated wall surface to give an Fifty Two only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered
smooth.Extra over item 57 for every
subsequent coat of wall painting
with plastic emulsion pain of
approved brand.Extra over item
for painting with plastic emulsion
paint of approved brand on ceilings
and sloping roofs. Applying two
coats of Birla (white cement based)
or Asian (acrylic lapy- putty) or
equivalent & two coats of primer of
approved brand and manufacture on
new wall surface to give an even
shade including thoroughly brushing
the surface free from mortar
dropping and other foreign matter
and sand papered smooth.
26 1.200 Rm providing and fixing the PVC pipe 606.00 Rupees Six One
rain water out let pipe of I.S.I mark Hundred Six and Running
finolex with necessesary bend plug,
jali ,clamps, etc. complete 75 mm
27 22.430 Sqm Providing and laying broken 779.70 Rupees Seven One
china mosaic flooring for Hundred Seventy Squere
terrace using 12 mm to 20 mm Nine and Paise metre
broken pieces of glazed tiles to be Seventy only
laid over cement mortar 1:3 to plain
or slope and to be tempered to
bring mortar creme out upto
surface using white cement
including rounding off junctions and
extending them upto 15 cm along
the wall,clearing with water and
oxalic acid etc. as directed.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
28 200.000 Kg Providing and FixingM.S. Grills of 199.64 Rupees One One
required pattern to wooden frames Hundred Ninety Kilogram
of pipe / agle etc. including priming Nine and Paise
coat of approved primer and two Sixty Four only
coats of oil painting etc. complete
ordinary grill.
29 15.000 Point Point wiring for Light / Fan/ Bell/ 336.63 Rupees Three One
Primary Point with 2-1.5 sq. mm Hundred Thirty Point
and earthwire of 1.5 sq. mm (green) Six and Paise
both are of ISI marked 1.1 kv grade Sixty Three only
FRLS PVC insulated multistrand
copper wires, in following type of
pipe to be erected concealed in
/flushed on wall/ceiling , complete
with 6A Tissino Type ISI marked
flush type switch / bell push and
accessories erected on Metal / PVC
Box covered with 3 mm thick
PC(Polycarbonet) /Acrylic sheet.
with necessary Lamp holder/ceiling
rose / H.D.Connector as directed.
(a) with medium class Rigid PVC
pipe and accessories
30 5.000 Point Point wiring for looped PLUG with 153.02 Rupees One One
tissino type single pole ISI marked Hundred Fifty Point
Switch and Socket erected with Three and Paise
necessary connections erected on Two only
wooden /Metal/ PVC Box covered
with 3 mm thick PC(Polycarbonet)
/Acrylic sheet for open / concealed
wiring for following size. [B] For
31 40.000 Rm Rigid PVC Pipe 3/4" size. 23.46 Rupees One
Twenty Three Running
and Paise Forty metre
32 40.000 No Supplying and erecting 132.61 Rupees One One
XLPE(IS:7098)(I)-88 ISI Hundred Thirty Number
unarmoured copper cable 1.1 KV Two and Paise
grade to be erected as directed of Sixty One only
following size. (E) 3 core 2.5 Sq.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
33 1.000 No Approved make Double Pole Plastic 153.02 Rupees One One
Switch and fuse 250V., 30A Hundred Fifty Number
confirming to IS erected on Polished Three and Paise
wooden block as directed. Two only
34 2.000 No Supplying and erecting Fan Hook of 51.01 Rupees Fifty One
10 mm M.S. Round bar grouted in One and Paise Number
RCC slab with Making the site as One only
35 2.000 No Providing and erecting Approved 1734.17 Rupees One One
make Ceiling fan with double ball Thousand Seven Number
bearing ISI mark with condenser Hundred Thirty
A.C. 23OV.50 c/s.1200 mm. sweep Four and Paise
complete, canopy and 30 cms. down
rod erected on existing hook or
clamp with 24/0.2 , 3 core flexible
wire with earthing. [Make shall be
approved by Engineer in charge]
36 1.000 No Pipe type earthing having 150 438.64 Rupees Four One
cms.long and 2.5 cms. dia. Hundred Thirty Number
galvanised iron pipe with coupling Eight and Paise
and buch buried in specially Sixty Four only
prepared earth pit complete with
necessary 8 SWG earth wire.
37 5.000 No Providing and Fixing Power saver CFL
lamp direct holder fitting 5-W Hundred Fifty Number
Three and Paise
38 2.000 No SHREE HARIOM ALUMUNIUM 7575.00 Rupees Seven One
Modular Table with Particle Board Thousand Five Number
Table Top and Metal Under structure Hundred Seventy
SHREE HARIOM ALUMUNIUM Five and Paise
39 10.000 No Unbranded--Sagar Enterprises Legs 3030.02 Rupees Three One
Office Chair Non-revolving and non- Thousand Thirty Number
tilting chair with armrest Unbranded and Paise Two
Manufactured by: SAGAR only
ENTERPRISES (CHAIR) Product
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words.
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Five Lakh Seventy Three Thousand One Hundred Four and Paise Forty Four Total Rs.
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent (
Should be written in figures and words ) of the estimated rate mentioned above. Amount of My \
Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3 Test Schedule.pdf
8 Cement.pdf
BOQ Rangpar Library.pdf
SBD Ranpar Library.pdf
SPECIFICATION_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .