Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 1 E S V SARANI SHYAM SUNDAR PARA P O RANAGHAT RANAGHAT 741201 | RANAGHAT | NADIA | WEST BENGAL | 741201 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 4 I A 2 MUKTAPUKUR ROAD BARRACKPORE KOLKATA 123 | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700123 | Admitted-Fee/PreQual/Technical |
Tender Value
₹23.5 L
EMD Value
₹46,949
Closing Date
17 Oct 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Krishnagar Division, Social Sector, P.W.Dte., Kanthalpota, Krishnagar, Nadia
Proposed Construction of Cycle Shed including connecting pathway infront of Sanskrit and Philosophy building, under RUSA Comp-3 University of Kalyani , Nadia
2026_WBPWD_5076328_1
WBPWD/SS/EE/KNG- 08(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
Haringhata
Please refer Tender documents.
6 documents required · 6 mandatory
₹46,949
Yes
27 Oct 2026
29 Sept 2026
27 Oct 2026
3 Oct 2026
17 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 61.92 | M3 | 198.61 | ₹12,297.93 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sidesof foundations etc. in layers not exceeding 20cm in depth, consolidatingeach deposited layer by ramming and watering, lead up to 50 and for all lift | 61.92 | M3 | 219.31 | ₹13,579.68 |
| 3 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete | 25.22 | M3 | 2,376.37 | ₹59,932.05 |
| 4 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete | 214.69 | M2 | 720.66 | ₹1,54,718.5 |
| 5 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from
natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.59 | M3 | 8,162.4 | ₹1,43,576.62 |
| 6 | Providing and laying in position specified grade of reinforced cementconcrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived fromnatural sources : 3 graded stone aggregate 20 mm nominalsize derived from natural sources) | 9.39 | M3 | 10,121.74 | ₹95,043.14 |
| 7 | Reinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.32 | M3 | 12,143.91 | ₹52,461.69 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.
Mild steel and Medium Tensile steel bars | 1,321.16 | Kg | 119.84 | ₹1,58,327.81 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level. | 678.24 | Kg | 119.84 | ₹81,280.28 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 80.82 | M2 | 438.8 | ₹35,463.82 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SPECIALTERMS.pdf
Tender Documents • 0.68 MB
WBF-2911.pdf
Tender Documents • 0.53 MB
BOQ_5169654.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .