| 1 | 1₹2.7 CrAccepted-AOC CHIEF ENGINEER DRAINAGE CUM MINING AND GEOLOGY 2 | ₹2.7 Cr | 1 | Accepted-AOC lowest bid |
| 2 | 2₹2.8 Cr+₹16.4 L (6.13%)Rejected-AOC | ₹2.8 Cr+₹16.4 L (6.13%) | 2 | Rejected-AOC higher bid |
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
25 Mar 2024, 5:00 pmClosed
XEN BML CANAL AND GROUND WATER DIV PTA
XEN BML CANAL AND GROUND WATER DIV PTA
Concrete lining of Gobindgarh Distributary RD 42000- 58000 by using M-15 concrete including of pucca structure.
2024_WR_119158_1
91/2023-24
Open Tender
Civil Works - Canal
Item Rate
90 days
LUDHIANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹5.5 L
XEN BML CANAL AND GROUND WATER DIV PTA
11 Jun 2024
1 Mar 2024
26 Mar 2024
1 Mar 2024
25 Mar 2024
1 Mar 2024
11 Mar 2024
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge exceeding 1.5 cumecs but upto 4.5 cumecs
Earthwork Excavation from canal using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m (As per CSR item no. 6.19) (Cutting)
Excavation of soil using hydralic Excavator and hydralic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and Leads Disposal/carraige from 0 upto 450m
Excavation of soil using hydralic Excavator and hydralic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and Leads Disposal/carraige additional beyond 450m upto 1km
Excavation of soil using hydralic Excavator and hydralic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and Leads Disposal/carraige additional beyond 1km upto 7km
Extra for laying earth/fly ash as per specifications for compaction in 20 cm layers and dressing,watering, rolling as per specifications for compaction.
Dressingof new Earth work
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :(a ) 0 to 1.5m depth
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick- Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Dressing side slopes and preparation of sub grade for linning
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Lining)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For coping)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Sleeper)
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction Joint with special impervious hot pour 12.5mm wide.
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
Dag belling single Kassi stroke minimum 7.5 cm depth.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Ordinary soil, Manual Means, Depth up to 3m.
Cement concrete 1:2:4 (M15) With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type.
Plain/Reinforced cement concrete M25 in sub-structure With Batching Plant, Transit Mixer and Concrete Pump complete as per drawing and Technical Specifications.
Supplying Fitting and placing HYSD bar reiforcement in sub structure complete as per drawing and technical specification.
Plain/Reinforced cement concrete grade M30 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRT&H Specifications
PCC M15 Grade levelling course below approach slab complete as per drawing and MoRT&H MoRT&H specification clause 2700
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)
Furnishing and placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical specification € RCC/PSC Grade M-40 using batching plant trasit mixer and concrete pump (a) For Solid slab Super-Structure including centering and Shuttering (i) Height upto 5m
Dismantling of prestressed / RCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
Dismantling of brick work in cement sand mortar / lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
plain cement concrete 1:3:6 nominal mix in Foundation with crused stone aggregate 40mm nominal size mechancicaly mixed placed in foundation and compacted by vibration including curing for 14 day
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in super structure.
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
T AND G CONSTRUCTION CO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .