| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 CrAccepted-AOC | ₹15.6 Cr | L1 | Accepted-AOC Since L1 and technocommercially accepted |
| 2 | L2₹23.8 CrRejected-Finance 6 3 252 1 7 B 3RD FLOOR PRAKASH LIGHTS BUILDING BANJARA HILLS ERRAMANZIL HYDERABAD TELANGANA 500034 | HYDERABAD | TELANGANA | 500034 | ₹23.8 Cr | L2 | Rejected-Finance REJECTED SINCE NOT L1 |
| 3 | L3₹44.1 CrRejected-Finance 92 C 203 PHASE VII FOCAL POINT LUDHIANA PUNJAB 141001 UDYAM PB 12 0017710 | LUDHIANA | PUNJAB | 141001 | ₹44.1 Cr | L3 | Rejected-Finance REJECTED SINCE NOT L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non compliant bid rejected. hence this Bidder is not evaluated further. Non compliance to Scope of supply ( EandI) Non accepting the Loading and penalty criteria.Submitted old tender TQ,bidder has not withdrawn Technical/Commercial deviation. |
Tender Value
Refer Docs
EMD Value
₹20.5 L
Closing Date
28 Jun 2019, 3:00 pmClosed
RAVINDER PAL SINGH LAMBA
PRAJ TOWER 274 AND 275 BHUMKAR CHOWK HINJEWADI ROAD, PUNE 411057
MILL-BIOMASS SIZE REDUCTION SYSTEM
2019_REFHQ_96858_1
MILL - S-17047/4/CII/MR/1003
Open Tender
Mechanical - All
180 days
PANIPAT
AS PER RFQ
6 documents required · 6 mandatory
₹20.5 L
Yes
PRAJ TOWER, PUNE
24 Jan 2020
8 May 2019
1 Jul 2019
8 May 2019
28 Jun 2019
31 May 2019
8 May 2019 - 16 May 2019
20 May 2019
Supply of MILL [Biomass size reduction system] - Design , Engineering , supply , mandatory services , Performance guarantee test (at shop/site) , Inspection (Including third party) , Commissioning and 1 year mandatory spares for normal operation, as per MR no. S-17047-4-BSM-9101 .
Transportation from Vendors work/ shop to site (FOT) for Item mentioned in 1.00 above
Supervision of erection, testing & commissioning as per MR no. S-17047-4-BSM-9101 for Item mentioned in 1.00 above.
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Customer training as per MR no. S-17047-4-BSM-9101 for Item mentioned in 1.00 above.
Hazop & SIL study participation as per MR no. S-17047-4-BSM-9101 for Item mentioned in 1.00 above.
Description of Work / Item(s)
Supply of MILL [Biomass size reduction system] - Design , Engineering , supply , mandatory services , Performance guarantee test (at site/shop) , Inspection (Including third party) , Commissioning and 1 year mandatory spares for normal operation, as per MR no. S-17047-4-BSM-9101.
Ocean freight charges for Transportation from FOB Seaport of Exit to Port of entry in India for Item mentioned in 1.00 above
Supervision of erection, testing & commissioning as per MR no. S-17047-4-BSM-9101 for Item mentioned in 1.00 above.
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Customer training as per MR no. S-17047-4-BSM-9101 for Item mentioned in 1.00 above.
Hazop & SIL study participation as per MR no. S-17047-4-BSM-9101 for Item mentioned in 1.00 above.
Description of Work / Item(s)
Spares
Description of Work / Item(s)
Spares
Description of Work / Item(s)
Cost Component
Direct Material Cost
Direct Labour Cost
Factory Overhead
BHS-Sonthofen India Private Limited
IDEA HOLDING LIMITED
BHS-Sonthofen India Private Limited
chemical Systems Technologies (I) Pvt. Ltd.
BHS-Sonthofen India Private Limited
IDEA HOLDING LIMITED
chemical Systems Technologies (I) Pvt. Ltd.
IDEA HOLDING LIMITED
chemical Systems Technologies (I) Pvt. Ltd.
IDEA HOLDING LIMITED
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Description of Work / Item(s)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid