Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC GODHUR KUSUNDA DHANBAD DHANBAD DHANBAD 828116 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828116 | ₹2.4 Cr Quoted ₹2.0 Cr | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹2.3 Cr+₹24.3 L (11.9%)Rejected-Finance | ₹2.3 Cr+₹24.3 L (11.9%) | 2 | Rejected-Finance L2 bidder |
| 3 | 3₹2.6 Cr+₹51.1 L (24.9%)Rejected-Finance | ₹2.6 Cr+₹51.1 L (24.9%) | 3 | Rejected-Finance L3 bidder |
Tender Value
₹2.8 Cr
EMD Value
₹3.5 L
Closing Date
26 Nov 2022, 5:00 pmClosed
General Manager, Bastacolla
Office of the General Manager Bastacolla Area
Construction of PQC Coal Transportation Road from 13/14 No Coal Dump to 06 No Coal Dump at Kuya under Bastacolla Area
2022_BCCL_262326_1
BCCL/BA/ACE/ENIT/2022-23/20 Date 15.11.2022
Open Tender
Civil Works - Roads
Item Rate
150 days
Bastacolla Area
Refer to NIT
7 documents required · 7 mandatory
₹3.5 L
25 Jul 2024
15 Nov 2022
28 Nov 2022
15 Nov 2022
26 Nov 2022
15 Nov 2022
15 Nov 2022 - 21 Nov 2022
Amount
Item desription
Construction of Embankment with Material obtained from Borrowpits: Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of Subgrade : Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 : By vibratory roller
By Mix in place method: Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of Shoulders A.) Earthen Shoulders
Surface Drains in Soil Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres).
Total impact of GST for the purpose of CTC
GOUTAM CONSTRUCTION
East India Construction Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .