Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-AOC | 1 | Accepted-AOC ADMITTED | |
| 2 | Rejected-Technical 73 KOVILPATTI ROAD RAM SINGH NAGAR MANAPPARAI TRICHY DISTRICT | MANAPPARAI | TRICHY | TAMIL NADU | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | YESVEE ANANTH BUILD-CON PRIVATE LIMITED L2 | THILLAI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 140 | M3 | 220 ₹30,800 | 184.8 ₹25,872 Lowest |
| 2.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 20 | m3 | 6,000 ₹1,20,000 | 5,579.4 ₹1,11,588 Lowest |
| 3.00Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | |||||
| 3.10 | Drain | 533 | m2 | 500 ₹2,66,500 | 459.8 ₹2,45,073.4 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part M.Sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 62 | m3 | 7,500 ₹4,65,000 | 7,029.45 ₹4,35,825.9 Lowest |
| 5.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 66.6 | m2 | 200 ₹13,320 | 170 ₹11,322 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Sept 2025, 3:00 pmClosed
EXECUTIVE OFFIER
PONNAMPATTI TOWN PANCHAYAT
Construction of storm water drain at Ward No.12 Saibaba Nagar in Ponnampatti Town Panchayat at Trichy District
2025_DTP_602925_5
15th2025261st
Open Tender
Civil Works - Others
Works
PONNAMPATTI TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
28 Oct 2025
11 Sept 2025
19 Sept 2025
11 Sept 2025
19 Sept 2025
11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_720769.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .