Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,000Accepted-Finance PLOT NO 12 DARYA GANJ DR P P MITTAL HARBANS SINGH STREET 110001 NORTH DELHI 110002 INDIA | NEW DELHI | DELHI | 110001 | L1 | Accepted-Finance Eligible Bidder | |
| 2 | L2₹1.0 L+₹1,400 (1.41%)Accepted-Finance C 938 9TH FLOOR TOWER NO 10 RIVER HEIGHTS RAJNAGAR EXTENSION GHAZIABAD UTTAR PRADESH 201017 | GHAZIABAD | UTTAR PRADESH | 201017 | L2 | Accepted-Finance Eligible Bidder | |
| 3 | L3₹1.2 L+₹19,000 (19.2%)Accepted-Finance | L3 | Accepted-Finance Eligible Bidder | |
| 4 | L4₹1.5 L+₹51,000 (51.5%)Accepted-Finance | L4 | Accepted-Finance Eligible Bidder | |
| 5 | L5₹1.6 L+₹56,000 (56.6%)Accepted-Finance NOT FOUND | L5 | Accepted-Finance Eligible Bidder |
Tender Value
Refer Docs
Closing Date
19 Oct 2020, 3:00 pmClosed
Maj Nagesh Prashar
Maj Nagesh Prashar GE (AF) Sirsa PIN 125055
Job order for Energy Audit of sub stations and transformers at AF Stn Sirsa
2020_MES_381423_1
3000/Q/31/2020-21
Open Tender
Miscellaneous Services
Works
60 days
GE (AF) Sirsa
As per NIT and Tender Documents
2 documents required · 2 mandatory
₹0
Exempted
16 Nov 2020
28 Sept 2020
20 Oct 2020
28 Sept 2020
19 Oct 2020
5 Oct 2020
28 Sept 2020 - 5 Oct 2020
Amount
Checking of Electrical System Network, it should cover substations, Sub Station equipments, AC Plants, Pump Houses, Reactive Power Compensation, Power Factor improvement in metering etc. Transformers (48 Nos): The audit scope should include study of 48 transformers with Ring Main units and Vacuum Circuit Breakers located at Air Force permises, their loading pattern, reconfiguration, renetworking, load balancing, losses and efficiency and possible suggestion to improve efficiency and life based on life cycle cost. Electrical motors & pumps (above 10HP): The operation of Electric motors/pumps should be studied using appropriate instrumentation support to assess the loading pattern, power factor, flow operating efficiency and other operational parameters. This should also include detailed study of the mechanical power transmission system to evolve suitable recommendations wherever feasible for energy efficiency improvements. Study of cooling towers associated with central AC plants. This should include detailed study of the operational performance of the cooling towers through measurements of temperature difference, air/water flow rate to enable evaluate specific performance parameters like approach, efficiency etc. Study of lighting system of Hangers and Blast Pens: A comprehensive study of the entire lighting system covering the light source (Lamps), luminiares (Reflectors etc), and the gears (ballsts) should be taken up. Besides this the illumination levels required viz-a-viz available should also be studied. Study of air conditioning & refrigeration system: The study should involve name plate details comparison with analysis of various parameters like co-efficient of performance, tonnage delivered, effectiveness of the ducting etc of the air conditioning systems. Also the study should include the performance evalution of the allied system. Green energy options and feasibility study. Energy management policy and strategy. The reports would highlight the energy conservation opportunities (ECO's) which are practically feasible in the plant along with the investments required and list of suppliers for installation of energy efficient equipments.
Energy Solution Company
GTD POWER SYSTEMS PVT LTD
Elion Technologies and Consulting Pvt Ltd
shiv shanker enterprises
Greenserve Energy Management solutions
HSE Integrio Pvt. Ltd.
De Calorie Energy consultant LLP
EKI Energy Services Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .