| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | ₹1.3 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | GeorgeVM L1 |
|---|---|---|---|---|
| 1.00Appendix A (Closing vents) | ||||
| 1.00 | OD12637/2025-2026:Conveying the shutter planks from the store to the cross bar and fixing in position etc. complete. | 1.98 | cum | 1,085 ₹2,148.30 |
| 1.00 | OD12696/2025-2026:Earthwork excavation in hard stiff clay conveying the same to V D with initial lead upto 5 to 6 km by boat and filling in between the shutters etc., complete. | 15.3 | cum | 1,251 ₹19,140.30 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 54 | cum | 235 ₹12,690 |
| 1.00 | OD12701/2025-2026:Labour charges for cleaning the grooves of vents | 8 | 1 nos | 1,472 ₹11,776 |
| 1.00 | 60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete | 690 | 1 cud m | 95 ₹65,550 |
| 1.01 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | 29.12 | sqm | 63 ₹1,834.56 |
| 2.00Appendix B (Opening vents) | ||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 15.3 | cum | 234 ₹3,580.20 |
| 2.00 | OD12703/2025-2026:Taking the shutters from the grooves of the vents conveying to the store shed after cleaning the shutter and stacking the same etc. complete as directed by the department officer at site. | 2.67 | cum | 1,629 ₹4,349.43 |
Tender Value
₹1.3 L
EMD Value
₹3,303
Closing Date
21 Oct 2025, 6:00 pmClosed
Assistant Executive Engineer Minor Irrigation Sub
Assistant Executive Engineer Minor Irrigation Subdivision Kannur, 670002
Annual maintenance of VCB cum bridge across Kanhirapuzha at Nittaramba in Maloor panchayath in Mattannur constituency, Kannur district for the year 2025-26-General Civil Work
2025_Irrig_804182_2
IRR/IA/EST/3970/2025_5_1_1
Open Tender
Civil Works - Others
Maloor panchayath
Please refer Tender documents.
13 documents required · 13 mandatory
₹555
Yes
₹3,303
Yes
4 Feb 2026
13 Oct 2025
23 Oct 2025
13 Oct 2025
21 Oct 2025
13 Oct 2025
Amount
Appendix A (Closing vents)
OD12637/2025-2026:Conveying the shutter planks from the store to the cross bar and fixing in position etc. complete.
OD12696/2025-2026:Earthwork excavation in hard stiff clay conveying the same to V D with initial lead upto 5 to 6 km by boat and filling in between the shutters etc., complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD12701/2025-2026:Labour charges for cleaning the grooves of vents
60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
Appendix B (Opening vents)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD12703/2025-2026:Taking the shutters from the grooves of the vents conveying to the store shed after cleaning the shutter and stacking the same etc. complete as directed by the department officer at site.
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
Bidder Name
GeorgeVM
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1349811.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1349811.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.63 MB
nit11.pdf
Other Document • 0.03 MB
epayment.pdf
Additional Documents • 0.01 MB
de_f.pdf
Additional Documents • 0.34 MB
Download all tender documents and submit your bid