SE, RED, Circle-Azamgarh.
OFFICE OF THE SUPERINTENDING ENGINEER, RURAL ENGINEERING DEPARTMENT, CIRCLE-AZAMGARH. Address- 2nd FLOOR, MANDALEEY VIKAS BHAWAN, SIDHARI-AZAMGARH, PINCODE-276001
Construction work of Transit Hostel for Gazetted Officers next to the canteen located in District Azamgarh Police Line.
2026_REDUP_1157558_1
54/RED/Cir Aza/Tender/26-27/dt 16.04.2026
Open Tender
Civil Works - Buildings
180 days
Azamgarh
Please Refer tender documents.
4 documents required · 4 mandatory
₹4,314
₹3.2 L
SE, RED, Circle-Azamgarh.
6 Jun 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
6 Jun 2026 - 22 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 538.16 | CUM | 180.06 | ₹96,901.09 |
| 2 | Filling of earth in plinth in 20cm layer including leveling, dressing and watering and also including of supply of earth including carted loading & unloading as per direction of Engineer incharge.. | 52.45 | CUM | 484.55 | ₹25,414.65 |
| 3 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 53.31 | CUM | 1,469.05 | ₹78,315.06 |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :2 coarse sand :48 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 0.71 | CUM | 5,449.75 | ₹3,869.32 |
| 5 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 84.84 | CUM | 4,712.03 | ₹3,99,768.63 |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 346.57 | SQM | 214.47 | ₹74,328.87 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum 5.33.1.1 | 96.1 | CUM | 6,574.67 | ₹6,31,825.79 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
Concrete of M25 grade with minimum cement content of 330 kg /cum 5.33.2.1 | 182.34 | CUM | 6,820.68 | ₹12,43,682.79 |
| 9 | Add for using extra cement in the items of design mix over and above the specified cement content therein. DSR-5.35 | 107.27 | QTL | 507.38 | ₹54,426.65 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:1:6 (1 cement : 6 sand) | 116.04 | CUM | 4,933.55 | ₹5,72,489.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
GazettedOfficersTransitHostelSBD.pdf
Tender Documents • 11.32 MB
BOQ_2169135.xls
BOQ • 0.44 MB