Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹15,680
Closing Date
4 Aug 2026, 6:00 pm
Executive Engineer
Office of the Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_317280_8
33 REW Samba of 2026-27, Dated 22.07.2026
Open Tender
Civil Works
Percentage
45 days
Bari Brahmana
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹15,680
22 Jul 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
4 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 23.11 | cum | 479.3 | ₹11,076.62 |
| 2 | Providing in position cement concrete of specified grade excluding the c/o centring and shuttering ( all work upto plinth level ), 1:5:10( 1: cement 6: coarse sand : 12Crushed stone aggregate 40mm nominal size, | 4.22 | cum | 4,826.5 | ₹20,367.83 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size, | 19.05 | cum | 5,733.6 | ₹1,09,225.08 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.93 | Cum | 7,788.4 | ₹38,396.81 |
| 5 | Reinforced cement conc. Work in beams,suspendedfloors, roofs having slope upto 15 degree,landing balconies,shelves,chajjas,lintels,bands,plain window sills,staircases and spiral stair cases upto floor five level excluding cost of centring shuttering,finishing and reinforcement.(1:1.5:3) | 6.24 | Cum | 9,821.85 | ₹61,288.34 |
| 6 | Reinforcement for R.C.C work including straightening,cutting,bending,placing in position and binding all complete. | 10.05 | qtl | 12,320 | ₹1,23,816 |
| 7 | Centring and shuttering including strutting, propping etc. and removal of form work for:-a) Foundation, footings, bases of columns. | 66.82 | sqm | 286.35 | ₹19,133.91 |
| 8 | soffit of slab | 30.1 | sqm | 718.2 | ₹21,617.82 |
| 9 | Edges of slab | 23.78 | Rmt | 262.2 | ₹6,235.12 |
| 10 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted | 18.49 | cum | 218.4 | ₹4,038.22 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_1039313.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].