Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.2 LAccepted-AOC AT BHATTI ROAD PO BIRAMITRAPUR DIST SUNDARGARH | SUNDARGARH | ODISHA | 754217 | ₹70.2 L | L1 | Accepted-AOC Qualified in the Lottery |
| 2 | L2₹70.2 LSame as L1Rejected-AOC | ₹70.2 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
| 3 | L2₹70.2 LSame as L1Rejected-AOC | ₹70.2 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
| 4 | L2₹70.2 LSame as L1Rejected-AOC AL NUAGAON GP BADAMBILA PO NAMAUZA PS AUL DIST KENDRAPARA PIN 754231 | KENDRAPARA | ODISHA | 754231 | ₹70.2 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
| 5 | L2₹70.2 LSame as L1Rejected-AOC AT UDUSU P O BISRA P S BISRA DIST SUNDARGARH PIN 770036 | BISRA | SUNDARGARH | ODISHA | 770036 | ₹70.2 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
Tender Value
₹70.3 L
EMD Value
₹70,400
Closing Date
19 Mar 2026, 5:00 pmClosed
Superintending Engineer Rourkela R and B Division
Office of Superintending Engineer Rourkela R and B division
Construction of RI office cum residence at Steel Township-1, Rourkela in the district of Sundargarh for the year 2025-26
2026_EICCL_126979_2
Bid id 30 of 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Rourkela
Please refer tender document
5 documents required · 5 mandatory
₹10,000
₹70,400
Yes
5 Aug 2026
9 Mar 2026
20 Mar 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work Part-I i) Ground Floor Earth work in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P,royalty etc. complete and as directed by the Engineer-in-charge. | - | Cubic Meters | 230.74 | - |
| 2 | i) Ground Floor Filling in foundation & plinth with sand in 22.5cm(9) thick layers including watering and ramming with all cost conveyance royalty, taxes of the materials and labour with T&P required for the work etc. complete or as directed by the Engineer-in-charge. | - | Cubic Meters | 534.96 | - |
| 3 | i) Ground Floor Plain Cement concrete (1:3:6) with 4cm size C.B, h.g metal of approved quality and from approved quary including hoisting,lowering, and laying in layers to 10cm(4) thick to required level, ramming,watering including all cost & conveyance of all materials and labour with T&P required for the work with all taxes and royalities complete in all respects and as directed by the EIC. | - | Cubic Meters | 6,766.42 | - |
| 4 | i) Ground Floor A) Foundation Fly ash bricks masonary in cement mortar (1:6) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. | 23.27 | Cubic Meters | 5,510.78 | ₹1,28,235.85 |
| 5 | i) Ground Floor B) Superstructure Fly ash bricks masonary in cement mortar (1:6) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. | - | Cubic Meters | 5,544.11 | - |
| 6 | ii) First Floor Fly ash bricks masonary in cement mortar (1:6) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. | 19.49 | Cubic Meters | 5,707.58 | ₹1,11,240.73 |
| 7 | iii) Second Floor Fly ash bricks masonary in cement mortar (1:6) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. | 13.3 | Cubic Meters | 5,832.19 | ₹77,568.13 |
| 8 | i) Ground Floor Fly ash bricks masonary in cement mortar (1:4) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. | 4.43 | Cubic Meters | 5,753.01 | ₹25,485.83 |
| 9 | i) First Floor Fly ash bricks masonary in cement mortar (1:4) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. | 5.24 | Cubic Meters | 5,918.57 | ₹31,013.31 |
| 10 | i) Ground Floor A) Columns and Beams i) Foundation R.C.C. work of M 20 grade with 20 mm down graded size chips. in all floor of approved quality and from approved quary including hoisting, lowering and laying in layers not exceeeding 15cm thick to the required level ,ramming,watering and curing etc. including all cost of material, labour, with T&P and taxes of materials etc. required for work and as per direction of EIC. | - | Cubic Meters | 6,880.35 | - |
stage.html
html • 0.13 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 0.24 MB
DTCN3002.pdf
Tender Documents • 6.91 MB
BOQ_584359.xls
BOQ • 1.04 MB
CorrigendumNew.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .