| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.5 CrAccepted-AOC | ₹66.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹77.3 CrRejected-Finance PREMISES NO 5 30 5 N C SENGUPTA SARANI GROUND FLOOR MALL ROAD KOLKATA WEST BENGAL INDIA 700 080 | KOLKATA | KOLKATA | WEST BENGAL | 700080 | ₹77.3 Cr | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹79 CrRejected-Finance | ₹79 Cr | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹92.7 CrRejected-Finance | ₹92.7 Cr | L4 | Rejected-Finance Other than L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical adverse remark in WLR |
Tender Value
₹68 Cr
EMD Value
₹15 L
Closing Date
4 May 2022, 6:00 pmClosed
Chief Engineer Navy Visakhapatnam
Chief Engineer Navy Zone Station Road Visakhapatnam Pin 530004
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF CERTAIN INFRASTRUCTURE WORKS UNDER GE(P)(N) VISAKHAPATNAM
2021_MES_480716_1
CA No CE(Navy)/VIZ/Token of 2021-22
Open Tender
Civil Works
720 days
Visakhapatnam
as per NIT
8 documents required · 8 mandatory
₹3,000
Garrison Engineer Project Navy No 01
₹15 L
Yes
Chief Engineer Navy Visakhapatnam zone
13 Jun 2022
9 Oct 2021
6 May 2022
9 Oct 2021
4 May 2022
20 Apr 2022
9 Nov 2021
Amount
Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col. 5 siginifies this fact only.
Engineering Procurement and Constructrion (EPC) of certain infratructure for Armament of IAC at NAD Visakhapatnam (SITE 1) , complete all as specified and directed.
Engineering Procurement and Constructrion (EPC) of Project-D Training Infrastructure at MO Visakhapatnam (SITE 2) , complete all as specified and directed.
Maintenance of arboriculture in site 1 i.e. infrastructure for Armament of IAC at NAD including watering and fertilization of all the grass/plants/trees by weeding, hosing, saucer melding once in every 15 days, planting new plants/grass in place of dead plants/grass of same species and height with out any extra cost to the department and as directed complete for the maintenance period of ONE YEAR from the completion date of project complete all as specified and directed. Note : Rate quoted shall be deemed to include for all labour, materials, tools and plants and one gardener per site, regular watering using sprinklers, including supply and spreading/spraying organic manure, chemical fertilizer, pesticides to the required extent complete all as specified and directed.
Maintenance of arboriculture in site 2 i.e. Project - D Training Infrastructure at MO including watering and fertilization of all the grass/plants/trees by weeding, hosing, saucer melding once in every 15 days, planting new plants/grass in place of dead plants/grass of same species and height with out any extra cost to the department and as directed complete for the maintenance period of ONE YEAR from the completion date of project complete all as specified and directed. Note : Rate quoted shall be deemed to include for all labour, materials, tools and plants and one gardener per site, regular watering using sprinklers, including supply and spreading/spraying organic manure, chemical fertilizer, pesticides to the required extent complete all as specified and directed.
Outsourcing for operation of central AC plant of Torpedo Workshop Building as provided under this contract after successful completion of Phase-II testing (i.e. during first year of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem for 03 shifts of 08 hours each in a day to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) separately in each shift of 08 hours all as directed by Engineer-in charge
Outsourcing for operation of central AC plant of Torpedo Workshop Building as provided under this contract second year after successful completion of Phase-II testing (i.e. during second year of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem for 03 shifts of 08 hours each in a day to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) separately in each shift of 08 hours all as directed by Engineer-in charge
Outsourcing for operation of central AC plant of Special Storehouse Building as provided under this contract after successful completion of Phase-II testing (i.e. during first year of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem for 03 shifts of 08 hours each in a day to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) separately in each shift of 08 hours all as directed by Engineer-in charge
Outsourcing for operation of central AC plant of Special Storehouse Building as provided under this contract second year after successful completion of Phase-II testing (i.e. during second year of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem for 03 shifts of 08 hours each in a day to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) separately in each shift of 08 hours all as directed by Engineer-in charge
Comprehensive maintenance of central AC plant of Torpedo Workshop Building as provided under this contract and outsourcing of central AC Plant of Torpedo workshop building for Third Year after successful completion of Phase-II testing (i.e. first year after successful completion of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem on daily basis to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) all as directed by Engineer-in charge
Comprehensive maintenance of central AC plant of Torpedo Workshop Building as provided under this contract and outsourcing of central AC Plant of Torpedo workshop building for Fourth Year after successful completion of Phase-II testing (i.e. second year after successful completion of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem on daily basis to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) all as directed by Engineer-in charge
Comprehensive maintenance of central AC plant of Torpedo WorkshopBuilding as provided under this contract and outsourcing of central AC Plant of Torpedo workshop building for Fifth Year after successful completion of Phase-II testing (i.e. third year after successful completion of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem on daily basis to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) all as directed by Engineer-in charge
Comprehensive maintenance of central AC plant of Special Storehouse Building as provided under this contract and outsourcing of central AC Plant of Torpedo workshop building for Third Year after successful completion of Phase-II testing (i.e. first year after successful completion of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem on daily basis to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) all as directed by Engineer-in charge
Comprehensive maintenance of central AC plant of Special Storehouse Building as provided under this contract and outsourcing of central AC Plant of Torpedo workshop building for Fourth Year after successful completion of Phase-II testing (i.e. second year after successful completion of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem on daily basis to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) all as directed by Engineer-in charge
Comprehensive maintenance of central AC plant of Special Storehouse Building as provided under this contract and outsourcing of central AC Plant of Torpedo workshop building for Fifth Year after successful completion of Phase-II testing (i.e. third year after successful completion of defect liability period) complete including cooling towers, AHUs, Electrical Control Panels and pumps and connected equipment in complete AC sytem on daily basis to ensure smooth and trouble free operation of plant to the entire satisfaction of users/department by providing services of one skilled technician of AC & Refrigeration (ITI qualified with 2-3 years relevant experience) all as directed by Engineer-in charge
(vi) Periodical cleaning of cooling tower and AHU filters shall be the contractor's responsibility. (vii) Room temperature and humidity display unit/instrument shall be provided at plant room for continuous monitoring. (viii) On completion of outsourcing of services for operation of central AC plant and comprehensive maintenance of central AC plant, the contractor shall carryout the complete system and controls functional tests before handing over of the plant to department or his successor in presence of user and Engineer-in-charge. If any components/spares are foound defective or unserviceable, the contractor shall replace the same at his own cost. A certificate to this effect and tests carried out duly signed by contractor, user and Engineer-in-charge shall be submitted before claiming the final bill.
Comprehensive maintenance of Electrically Operated cargo/good lift of capacity 2000 kg to serve G+02 upper floors in Torpedo Workshop building as provided under this contract during 1st year after completion of defect liability period all as specified and directed
Comprehensive maintenance of 02 No Electrically Operated cargo/good lift of capacity 3000 kg to serve G+02 upper floors in Special Storehouse building as provided under this contract during 1st year after completion of defect liability period all as specified and directed
Comprehensive maintenance of Electrically Operated cargo/good lift of capacity 2000 kg to serve G+02 upper floors in Torpedo Workshop building as provided under this contract during second year after completion of defect liability period and after completion of first year Comprehensive Maintenance.
Comprehensive maintenance of 02 No Electrically Operated cargo/good lift of capacity 3000 kg to serve G+02 upper floors in Special Storehouse building as provided under this contract during second year after completion of defect liability period and after completion of first year Comprehensive Maintenance.
Comprehensive maintenance of Electrically Operated cargo/good lift of capacity 2000 kg to serve G+02 upper floors in Torpedo Workshop building as provided under this contract during third year after completion of defect liability period and after completion of second year Comprehensive Maintenance.
Comprehensive maintenance of 02 No Electrically Operated cargo/good lift of capacity 3000 kg to serve G+02 upper floors in Special Storehouse building as provided under this contract during during third year after completion of defect liability period and after completion of second year Comprehensive Maintenance.
Note for SL No: 15 to 20 :- (i) Comprehensive maintenance consists of preventive and breakdown services including replacement of material and labour for major/minor spare parts and consumables like topping of Oils/grease/door rollers/relays/door belts/gate lock contacts and hardware like bolts and nuts including load testing of lift for satisfactory performance once in a year complete and rate quoted by the tenderer includes for the above Lifts. (ii) Preventive maintenance consists of carrying out routine check by skilled personnel as specified in Particular specifications and as directed by Engineer-in-Charge and lubricating to all moving parts, topping parts, topping up of oils as per Lubrication Chart including Material and labour for all consumable and major/minor spare parts. (iii) Breakdown maintenance consists of attending to the faults that may occur and carrying out necessary repairs to electrical, control circuits and mechanical components including materials & labour for all minor & major spare parts and consumables of the lift that may occur during the operation.
PUSHKARRAJ CONSTRUCTION PRIVATE LIMITED
Som Projects Pvt Ltd
SVC PROJECTS PVT. LTD
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid