Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC | ₹10.0 L | 1 | Accepted-AOC work completed |
| 2 | 2₹10.0 L+₹2,432 (0.24%)Rejected-Finance VILLAGE BANDLI PO KANDO BHATNOL TEHSIL SHILLAI DISTRICT SIRMOUR HP | BANDLI | SIRMOUR | HIMACHAL PRADESH | ₹10.0 L+₹2,432 (0.24%) | 2 | Rejected-Finance Not Lowest |
| 3 | 3₹10.0 L+₹4,934 (0.50%)Rejected-Finance | ₹10.0 L+₹4,934 (0.50%) | 3 | Rejected-Finance Not Lowest |
| 4 | 4₹10.0 L+₹7,992 (0.80%)Rejected-Finance | ₹10.0 L+₹7,992 (0.80%) | 4 | Rejected-Finance Not Lowest |
| 5 | 5₹10.1 L+₹11,467 (1.15%)Rejected-Finance VILLAGE BALOH PO NANWAN TEHSIL GHUMARWIN DISTT BILASPUR H P | ₹10.1 L+₹11,467 (1.15%) | 5 | Rejected-Finance Not Lowest |
Tender Value
₹9.5 L
EMD Value
₹19,070
Closing Date
12 Oct 2022, 5:00 pmClosed
EE Shillai
Executive Engineer HP PWD Division Shillai
Construction of link road from Shillai Naya Gatamandwach sundrari to Chanpurdhar km. 0/0 to 8/0(SH-C/o formation cutting 5/7 Mtrs. Wide road in km. 0/0 to 1/375)
2022_PWD_66093_6
TA-12233-12332dt-29-9-2022
Open Tender
Civil Works - Roads
Item Rate
60 days
Shillai
please refer to tender notice
10 documents required · 10 mandatory
₹350
₹19,070
30 Jan 2025
6 Oct 2022
13 Oct 2022
6 Oct 2022
12 Oct 2022
6 Oct 2022
Amount
Excavation in earthwork in hilly area in all heights and depths, in all kind of soils by manual / mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock chiselling, wedging out of rock ( where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines, grades, width camber and super elevation levels cutting and trimming of side slopes and level as show in the drawing and as directed by Engineer-in-Charge at site according to the MORD Technical Specification Clause 302,1603 and 1603.2 and sorting out useful materials and stacking, the same in all leads and lifts in acquired width of road and transportation of un useful material for filling in road ways, camber, embankments for grade improvements and disposal of all material to required width of the road or on approved dumping site through all modes of transportation including head load or animal transport or mechanical means along with its leveling fine dressing and carriage of machineries, materials , tools, equipments and safety measures incidentals necessary to complete the work by mechanical means and labour, if required all useful materials such as stone, shingle aggregate and slates etcetera. Shall be sort out stacked and measured. Recovery at the rate of Rs. 170/-(Rupees one hundred seventy) per cubic meter shall be effected from the bill, for the quantity actually measured or 291.65 (Two hundred ninety one point six five) cubic meter on pro rata basis whichever is more. Any loss to the private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases.
CHATTER SINGH
SHUBHAM
AMAR SINGH SHARMA
rattan singh
ravinder singh
DHARAM SINGH
sanjay chauhan
RAM LAL
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .