Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC AT UPPER KULHI JHARIA P O JHARIA DIST DHANBAD | DHANBAD | DHANBAD | JHARKHAND | L1 | Accepted-AOC Awarded | |
| 2 | L2₹2.1 L+₹6,491.42 (3.25%)Rejected-Finance AT PHUSBUNGLOW PO BHAGA DIST DHANBAD 828301 | DHANBAD | DHANBAD | JHARKHAND | 828301 | L2 | Rejected-Finance due to higher rate quoted | |
| 3 | L3₹2.1 L+₹7,452.42 (3.73%)Rejected-Finance NEAR HANUMAN GARHI BANIAHIR JHARIA DHANBAD JHARKHAND 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | L3 | Rejected-Finance due to higher rate quoted |
Tender Value
₹1.9 L
EMD Value
₹2,401
Closing Date
28 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
INCHARGE AAW,KA
office of The GM, Kusunda Area
Repair work of Tata Hyva Reg.No-JH10AE-0310 of Area Auto workshop, Kusunda Area
2023_BCCL_291423_1
BCCL/KA-VI/TRPT/E-NIT/23-24/20
Open Tender
Miscellaneous Works
Item Rate
15 days
Area Auto Workshop, Godhur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,401
Yes
14 Nov 2023
17 Oct 2023
30 Oct 2023
17 Oct 2023
28 Oct 2023
17 Oct 2023
Amount
Reapir work of Tata Hyva
Jobs to be done: 1. Rear and front Spring leaf removing, recambering and fitting. 2. Rear and front spring leaf cutting & whole making.3. Rear and front spring leaf elding & grinding.4. Rear and front spring bell crank removing & fitting.5. Rear and front spring hanger removing and bolt changing, fitting. 6. Rear and front spring shakle removing and new shackle fitting.7. Rear spring bell crank (04 No) damage hole new making, welding, machining proper size & all bell crank, bush raimring, machining and fitting.8. Rear and front spring balance rod lever welding, making, repairing & bush raimring, fitting and achining.9. Complete Clutch assy. O/H, removing and fitting.10. Complete pressure plate, fly wheel assy., release bearing with hub etc dismantling and fitting.11. Clutch cylinder complete O/H and fitting.12. Clutch servo booster comp. removing and changing, fitting.13. Gear box comp. O/H and fitting.14. Gear box comp. dismantling, fitting at the Hyva also all accessories removing and fitting.15. Gear box main shaft welding and repairing.16. Gear box liver welding, repairing, making.17. Front bumper cutting, denting, welding, repairing, straightening and fitting with nut & bolt changing.18. Complete diesel pipe line removing, checking, repairing, cleaning, and broken pipe changing and fitting.19. Complete Radiator with cooler with hose & clamp removing, fitting & setting.20. Door glass with machine removing, changing and fitting.21. Door glass channel with Patti removing, changing & fitting.22. Steering pump removing, changing and fitting. Materials required: Rear spring bell crank bush 04 sets, Rear spring bell crank pin big size 06 No, Rear spring bell crank pin small size 06 No, Rear spring pin 08 No, Rear spring bush 08 No, Front spring pin 04 No, Front spring bush 04 No, Rear & front spring centre bolt 06 No, Rear & front spring quotter pin bolt 22 No, Rear & front spring U bolt 04 No, Rear & front spring clamp with bolt 12 inch 04 No, Rear & front spring clamp with bolt 8 inch 06 No, Rear & front spring clamp with bolt 6 inch 05 No, Spring hanger 02 No, Spring shackle 02 No, Rear & front spring side washer 8 mm 48 No, Rear & front spring side washer 6 mm 52 No, Clutch Plate assy. 01 No, Clutch bearing with hub 01 Set, Clutch T.H.cover with oil seal 01 Set, Clutch collector ring 01 No,Clutch housing & pressure plate bolt 10 No, Clutch cylinder repair kit 02 Set, Clutch servo booster assy. 01 No, Gear box counter shaft assy. 01 No, Gear box 2nd speed pinion 01 No, Gear box engaging 2nd gear pinion 01 No, Gear box engaging 3rd gear pinion 01 No, Gear box oil paking kit 01 Set,Gear box shifter dog 01 No, Gear box shifter shaft 01 No, Gear box fork assy. 01 No,Gear box brass ring 02 No, Gear box synchronizor ring 02 No,Gear box roller bearing 03 No, Gear box brass pad 01 Set, Gear box idler gear 01 No, Steering pump assy. 01 No etc. to be replaced. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
Naz Automobile and Tyre Repairing Works
M/s kartik enterprises
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_301833.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .