| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-AOC | ₹33.3 L | L1 | Accepted-AOC First lowest |
| 2 | L2₹36.1 L+₹2.8 L (8.45%)Rejected-AOC PARVATHI VIHAR MEL MURINGODI PERAVOOR PIN 670673 | PERAVOOR | KANNUR | KERALA | 670673 | ₹36.1 L+₹2.8 L (8.45%) | L2 | Rejected-AOC Second lowest |
| 3 | L3₹40.4 L+₹7.0 L (21.1%)Rejected-Finance | ₹40.4 L+₹7.0 L (21.1%) | L3 | Rejected-Finance Above PAC |
| Sl No | Description | Qty | Unit | PRAKASHAN KIZHAKKAYIL L3 | M D SAJI L1 | VINOOP ILLATHU VALAPPIL L2 |
|---|---|---|---|---|---|---|
| 1.00DEMOLISHING AND DISMANTLING | ||||||
| 1.01 | 15.12.1
Dismantling doors, windows and clerestory windows (steel or wood ) shutter
including chowkhats, architrave, holdfasts etc. complete and stacking within 50
metres lead:Of area 3 sq. metres and below | 9 | Each | 390 ₹3,510 | 325.2 ₹2,926.8 Lowest | 350.7 ₹3,156.3 |
| 1.02 | 15.3
Demolishing R.C.C. work manually / by mechanical means including stacking of
steel bars and disposal of unserviceable material with in 50 metres lead as per
direction of Engineer -in-Charge. | 5.15 | cum | 3,769 ₹19,425.43 | 3,146.1 ₹16,215 Lowest | 3,392.82 ₹17,486.59 |
| 1.03 | 15.7.4
Demolishing brick work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | 13.66 | cum | 2,186 ₹29,869.5 | 1,824.8 ₹24,934.07 Lowest | 1,967.97 ₹26,890.34 |
| 1.04 | 15.9.2
Demolishing stone rubble masonry manually / by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50
metres lead as per direction of Engineer -in- Charges:In cement mortar | 5.51 | cum | 2,609 ₹14,370.37 | 2,178 ₹11,996.42 Lowest | 2,348.81 ₹12,937.25 |
| 2.00CIVIL WORK | ||||||
| 2.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 156.53 | sqm | 18.67 ₹2,922.42 | 15.6 ₹2,441.87 Lowest | 16.8 ₹2,629.7 |
| 2.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 34.9 | cum | 264 ₹9,214.66 | 220.7 ₹7,703.31 Lowest | 238.04 ₹8,308.55 |
| 2.03 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 10.72 | cum | 8,144 ₹87,303.68 | 6,796.9 ₹72,862.77 Lowest | 7,329.98 ₹78,577.39 |
| 2.04 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 28.39 | cum | 8,565 ₹2,43,203.17 | 7,148.7 ₹2,02,987.34 Lowest | 7,709.38 ₹2,18,907.85 |
Tender Value
₹36.5 L
EMD Value
₹50,000
Closing Date
20 Jun 2026, 3:00 pmClosed
Thankam S K Pillai Regional Engineer
REGIONAL ENGINEER KERALA STATE NIRMITHI KENDRA ARATTUTHARA P.O, WAYANAD, PIN 670645
Village Office Construction
2026_KSNK_855298_1
KSNK/TECH/WYD/VONCYD-48 R3/2026
Open Tender
Civil Works - Buildings
Item Rate
270 days
Nuchiyad Kannur
Refer NIT
5 documents required · 5 mandatory
₹2,500
₹50,000
Yes
28 Jul 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
20 Jun 2026
10 Jun 2026
10 Jun 2026 - 20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DEMOLISHING AND DISMANTLING | |||||
| 1.01 | 15.12.1
Dismantling doors, windows and clerestory windows (steel or wood ) shutter
including chowkhats, architrave, holdfasts etc. complete and stacking within 50
metres lead:Of area 3 sq. metres and below | - | Each | - | - |
| 1.02 | 15.3
Demolishing R.C.C. work manually / by mechanical means including stacking of
steel bars and disposal of unserviceable material with in 50 metres lead as per
direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.03 | 15.7.4
Demolishing brick work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.04 | 15.9.2
Demolishing stone rubble masonry manually / by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50
metres lead as per direction of Engineer -in- Charges:In cement mortar | - | cum | - | - |
| 2CIVIL WORK | |||||
| 2.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 2.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | - | cum | - | - |
| 2.03 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | - | cum | - | - |
| 2.04 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Tenderconditions.pdf
Tender Documents • 0.64 MB
Agreement.pdf
Tender Documents • 0.34 MB
EP.pdf
Other Document • 0.16 MB
BOQ_1445525.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .