| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 CrAccepted-AOC BAJUGAON CITY TOWN GOSSAIGAON P O JARAGURI P S GOSSAIGAON DIST KOKRAJHAR PIN 787000 | 787000 | ₹23.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹24.8 CrRejected-AOC CHEGELI POTHER P O JIADHAL CHARIALI P S DHEMAJI DIST DHEMAJI ASSAM | DHEMAJI | ASSAM | 787026 | ₹24.8 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S MARJIT BASUMATARY L1 | PROBIN DIHINGIA L2 |
|---|---|---|---|---|---|
| 1.00 | ADMINSTRATIVE BUILDING
EARTH WORKS
2.6.1. Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | 2,769 | Cum | 240 ₹6.6 L | 217.78 ₹6.0 L |
| 2.00 | 2.25. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,632.05 | Cum | 253.95 ₹4.1 L | 269.19 ₹4.4 L |
| 3.00 | 2.26. Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil
BELOW GROUND 1.5 TO 3.0 M | 663 | Cum | 104.5 ₹69,283.50 | 110.77 ₹73,440.51 |
| 4.00 | 1.1.2. Carriage of material by mechanical transport including loading, unloading to 5km. | 483.05 | Cum | 271.45 ₹1.3 L | 287.74 ₹1.4 L |
| 5.00 | 2.35.3. Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
2.35.3.1. With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,350 | Sqm | 256.15 ₹3.5 L | 271.52 ₹3.7 L |
| 6.00 | CONCRETE WORKS
4.1. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.2. 1:1.5:3 (1 Cement : 1.5 coarse sand (zone-III) : 3 graded stone
aggregate 20 mm nominal size) | 10.6 | Cum | 7,783.65 ₹82,506.69 | 8,250.67 ₹87,457.10 |
| 7.00 | 4.1.8. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone
aggregate 40 mm nominal size) | 258.13 | Cum | 6,326.05 ₹16.3 L | 6,705.61 ₹17.3 L |
| 8.00 | 4.17. Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement :3 coarse sand : 6graded stone aggregate 20mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth | 222 | Sqm | 681.65 ₹1.5 L | 722.55 ₹1.6 L |
| 9.00 | REINFORCED CEMENT CONCRETE WORK
5.9. Centering and shuttering including strutting, propping etc. and removal of form for :
5.9.1. Foundations, footings, bases of columns, etc. for mass concrete. | 93.75 | Sqm | 307.95 ₹28,870.31 | 326.43 ₹30,602.81 |
| 10.00 | 5.9.3. Suspended floors, roofs, landings, balconies and access platform. | 3,845.16 | Sqm | 766.55 ₹29.5 L | 812.54 ₹31.2 L |
Tender Value
₹23.4 Cr
EMD Value
₹46.7 L
Closing Date
8 Aug 2025, 1:00 pmClosed
Sri Pranab Kr. Rabha
O/o the Addl. Chief Engineer-cum-Director, PWD, BTC, Kokrajhar.
Construction of Polytechnic and Vocational Training Institute at Parbatjhora, District Kokrajhar, Assam. TN_52_02R
2025_BTC_45570_1
No. 02/PWD/BTC/SDP/2023-24/23
Open Tender
Civil Works - Building
730 days
Kokrajhar
Refer to Tender Documents
4 documents required · 4 mandatory
₹20,000
₹46.7 L
Yes
24 Oct 2025
16 Jul 2025
8 Aug 2025
16 Jul 2025
8 Aug 2025
16 Jul 2025
16 Jul 2025 - 8 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid