Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹26.8 L
EMD Value
₹40,200
Closing Date
16 Mar 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Agri Alappuzha
O/o Executive Engineer Agri Sanathanapuram PO Kalarcode Alappuzha 688003
Retender RIDF - XXII - Infrastructural Development works at Makkothara Noorupara Padasekharam -Neendoor KB (Additional work - New Estimate)
2021_AGRI_414729_3
EE(2) 180/2021
Open Tender
Civil Works - Others
Item Rate
365 days
Neendoor
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹40,200
Yes
11 Aug 2021
6 Mar 2021
18 Mar 2021
6 Mar 2021
16 Mar 2021
6 Mar 2021
90 days
Amount
Bund formation & Side protection
od3198/2020_2021 : Modified 2.6.1 ;Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.for forming bund using excavated earth including forming neat banking<br>All kinds of soil
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od1519/2020_2021 : Modified Data 60.7.1<br>DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
od2828/2020_2021 : Modified Data 4.1.5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
od2839/2020_2021 : Modified 13.33.1Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
od2771/2020_2021 : Modified Data 51.2.2&lt;br&gt;Supplying and filling at site with good quality earth suitable for filling brought from out side, levelling the top at site and banking in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od2807/2020_2021 : Modified data 2.25 Back Filling using available excavated earth (excluding rock) in sides of foundations Side Protetion Walls etc. in layers exceeding 20 cm in depth, consolidating , lead up to 50 m and lift up to 2.5 m.
Bidder Name
MUDOOR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_596550.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .