Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical GROUND FLOOR NIRMAN NIKETAN VISE MALA COLLEGE ROAD NASHIK MAHARASHTRA 422005 | NASHIK | MAHARASHTRA | 422005 | Rejected-Technical Not Responsive |
| 2 | Rejected-Technical | Rejected-Technical Not Responsive |
| 3 | Rejected-Technical | Rejected-Technical Not Responsive |
Tender Value
₹74.8 L
EMD Value
₹75,000
Closing Date
24 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER W B P DIV CHH. SAMBHAJINAGAR
EXECUTIVE ENGINEER W B P DIV CHH. SAMBHAJINAGAR
Providing Project Management Providing Project Management Consultant (P.M.C) along with Consultancy Services for Consultancy Services for Architectural and R.C.C. Design and other Consultancy Services like M.E.P, Green Building, Land Scape Designin
2026_PWR_1318170_1
E TENDER NOTICE NO 03 2026-2027
Open Tender
Consultancy
Item Rate
1095 days
CHH. SAMBHAJINAGAR
3 documents required · 3 mandatory
₹1,180
₹75,000
24 Aug 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparing ARCHITECTURAL LAYOUTS & LINE PLANS:- Preparing Architectural Layouts and Detail Line Plans of all Floor levels as per inputs recieved from USER Department(P.W.D.) and their requirements, as per site situation and Topography of the land available. Making Repetative Corrections till approval of all Line plans prepared from USER Department and Final Working drawings approved from Govt Architect (Chief or Dy.Chief Architect of that Region) and general approval of SEDC Mumbai through Govt. Architect and Submission in soft copy of Autocad Format as well as in PDF format for further work, with detail specification, etc complete and as directed by Engineer Incharge. | - | Nos | - | - |
| 2 | Preparing MEP LYOUTS AND INTEGRATING WITH WORKING PLANS:-
Preparing & Integrating Mechanical, Electrical & Plumbing definitions with Architectural Plans of all Floor levels, with quality & standard materials and instalation method with minimizing conflicts of MEP with civil structure using BIM analysys for Fire Safety, Plumbing Nodes, HVAC system, etc. With Submission in soft copy of Autocad Format as well as in PDF format for further work execution, with detail specification, etc complete and as directed by Engineer Incharge. | - | Nos | - | - |
| 3 | Preparing and INTEGRATING GREEN BUILDING ITEMS IN PLANS:- Preparing & Integrating Green Building Concept and Items with Architectural Plans of all Floor levels, with minimizing environmental impact, syncing energy efficient Structure with sustainable materials with conservation of water, etc. Making Repetative Corrections till approval of all working plans and approved from Govt Architect. (Dy.Chief Architect P.W.Region) and Submission in soft copy of Autocad Format as well as in PDF format for further work execution, with detail specification, etc complete and as directed by Engineer Incharge. | - | Nos | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
1FinalRFPPWDADMINBLDG.pdf
Tender Documents • 1.41 MB
BOQ_2259485.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .