| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-Finance | L1 | Accepted-Finance L1, ACCEPTED | |
| 2 | L2₹38.0 L+₹4.7 L (14.1%)Rejected-Finance | L2 | Rejected-Finance L2 REJECTED |
Tender Value
₹33.3 L
EMD Value
₹66,531
Closing Date
30 May 2022, 6:00 pmClosed
Executive Engineer ( Civil)
O/O EXECUTIVE ENGINEER (C), BSNL CIVIL DIVISION, ITANAGAR
RECONSTRUCTION OF BOUNDARY WALL DAMAGED DUE TO FLASH FLOOD IN TE AND STORE COMPOUND AT BANDERDEWA ARP
2022_BSNL_116713_1
2022_BSNL_116639_1
Open Tender
Civil Works
Works
120 days
BANDERDEWA
ENLISTED CONTRACTORS OF BSNL CIVIL WING, MES, CPWD, RAILWAY AND AS MENTIONED IN TENDER DOCUMENT
3 documents required · 3 mandatory
₹590
Yes
AO ( Claims)
₹66,531
8 Aug 2022
23 May 2022
2 Jun 2022
23 May 2022
30 May 2022
23 May 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a) 1:4:8 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size).
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :
1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc..
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
All works upto plinth level
All works above plinth level upto floor V level
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand
12 mm cement plaster of mix :
1:6 (1 cement: 6 course sand)
15 mm cement plaster on the rough side of single or half brick wall of mix
1:6 (1 cement: 6 course sand)
Neat cement punning.
Finishing walls with water proofing cement paint of required shade :
New work (Two or more coats applied @ 3.84 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
Hiring of JCB for digging out tower/Telecom materials from the deposited silt/malba about 60 cm which was deposited during storm water due to cloud burst came from outside from hill side etc. complete as per direction of Engineer-In- Charge. ( Area approx 25.00 m x15.00 m)
providing manual assistance for picking up the tower/ telecom store materals from JCB excavated malba as per direction of Engineer-in-Charge
Credit of briks recieved during the work
Providing & fixing 40 mm dia. CPVC pipes upto 300 mm long in retain walls at weep holes as per the direction of Engineer-in Charge.
Disposal of Brick debris , rubbish & foreign materials from site involving mechanical means means including loading & unloading within 10 Km lead to approved muncipal dumping ground as approved by Engineer in charge.
D.N. ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .