Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | -7.01% | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 L+₹1,960.69 (0.54%)Admitted-Finance | -6.51% | ₹3.7 L+₹1,960.69 (0.54%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 L+₹19,685.27 (5.40%)Admitted-Finance | -1.99% | ₹3.8 L+₹19,685.27 (5.40%) | L3 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,860
Closing Date
25 Jun 2026, 6:00 pmClosed
SPD JAIPUR
OFFICE ADPC SAMAGRA SHIKSHA JODHPUR INSIDE GGSSS SARDARPURA JODHPUR
MAJOR REPAIR WORK
2026_RCSCE_567887_1
NIT 03(CIVIL)/2026-27 CIVIL WORK AT GPS DHERIYON KA MOHELLA JODHPUR CITY
Open Tender
Civil Works
Percentage
120 days
JODHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
DPC SAMAGRA SHIKSHA JODHPUR/MD RISL JAIPUR
₹7,860
9 Jul 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tiled roofing with battens boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50-meter lead. | - | - | - | - |
| 2 | . | 247.82 | Sqm | 54 | ₹13,382.28 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | - | - | - | - |
| 4 | . | 18.87 | Cum | 4,624 | ₹87,254.88 |
| 5 | Providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg of VG-40 (30/40 )grade and 0.30 Kg/Sqm. Of VG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. | - | - | - | - |
| 6 | . | 247.82 | Sqm | 317 | ₹78,558.94 |
| 7 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | - | - | - | - |
| 8 | . | 99.98 | Sqm | 80 | ₹7,998.4 |
| 9 | Pointing on stone masonary in cement mortar 1:3 (1 cement : 3 fine sand) : Flush / Ruled/ Struck or weathered pointing. | - | - | - | - |
| 10 | . | 158.64 | Sqm | 124 | ₹19,671.36 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
NIT03DOCUMENTSS.pdf
Tender Documents • 14.25 MB
BOQ_1010239.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .