Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹11,000
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer, Drainage Division No.2, Surat.
M & R to damaged compound wall at final plot of 96, 97, 110, 118 and 103.
306274
02 of 2026-27
Open
Civil - All
Works
Surat
14 documents required · 12 mandatory · 2 optional
₹900
Executive Engineer, Drainage Division No.2, Surat.
₹11,000
18 May 2026
18 May 2026
18 May 2026
25 May 2026
18 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50Cr.)
Name of work :- M & R to compound wall at Final plot no. 96, 97, 110, 118 and
It. No Description of Item Qty Unit Rate In Words Amount
1 Clearing the borrow area including
thin jungle cutting and removing
trees up to 0.50 cm girth, bushes,
shrubs etc. complete. 4.56 Hactor 2887.99
2 Boring holes 3.5 m deep in ordinary Rupees One
soil (for cast in situ piles ) and getting Thousand
out the soil and disposal of surplus Three
excavated soil as directed within a 36.00 Nos 1335.62 Hundred
lead of 50 m for following diameter Thirty Five and
of piles. (ii) 250 mm diameter Sixty Two
3 Excavation for foundation in all sorts
of soil including sandy and gravelly
soil, soft murrum including
depositing the excavated stuff as Rupees One
and where directed including back Hundred
filling the tranches with suitable 7.00 CM 194.57 Ninety Four
excavated stuff etc. complete for and Fifty
lead up to 50 and lift as seven Paisa
under.(Manuly without dewatering)
(a) Lift upto 1.5 meter.
4 Providing and placing in position
reinforcement bars including cutting,
bending welding, joints where
22.08 Qtl. 7194.00 Hundred
necessary, hooking etc. complete as
per drawing for all lead and lifts. (b)
It. No Description of Item Qty Unit Rate In Words Amount
5 Providing and laying plain/
reinforced Nominal Mix cement
concrete of various grade
with cement, sand and coarse
aggregates including centering,
shuttering, batching, Rupees Four
mixing, transporting, placing, Thousand Four
vibrating, smooth finishing, curing Hundred
etc. complete for all lead 19.00 CM 4479.80
and lift. (Manually with Conventional and Eighty
Mixer, excluding dewatering) B-Raft, Paisa
barrel, footing of columns, piers,
abutment and bottom slab of sump
etc. (i) M-15 grade.
6 Brick work using common burnt clay
building brick having crushing Rupees Four
strength not less than 35 kg/sq.cm. Thousand Two
in in foundation and plinth in cement 74.00 CM 4245.09 Hundred
mortar 1:5 (1 Cement :5 fine sand). Fourty Five
(B) Conventional and Nine Paisa
7 20 mm thick sand faced cement
plaster on walls upto height
metres above ground level
consisting of 12mm thick backing
550.00 SM 347.42 Fourty Seven
coat of C.M 1:3 ( 1-cement: 3-sand)
and 8mm thick finishing coat of C.M
1:1 ( 1- cement : 1-sand) etc.
It. No Description of Item Qty Unit Rate In Words Amount
8 Providing and fixing 1mm thick M.S.
sheet sliding shutters with frame and
diagonal braces of 40mm x 40mm x
6mm angle iron, 3.15mm M.S. Rupees Three
gusset plates at junctions and Thousand
corners 25 mm dia pully, 40mm x Eight Hundred
40mm x 6mm angle and T- iron 45.00 SM 3824.20
guide rail, at Top and bottom and Twenty
respectively with stoppers and Paisa
locking arrangement etc, including
applying of priming coat of red lead
paint (upto 10 ton)
9 Finishing wall with water proofing
cement paint of on wall surface (Two
Coats) to give an approved brand
and manufactures and of required
550.00 SM 60.47 and Fourty
shape even shade after throughly
brushing the surface to remove all
dirts, and remain of loose powdred
10 Painting two coats (excluding
priming coat) on new steel and other
metal surfaces with enamel paint
brushing, interior to give enamel
45.00 SM 68.57 Eight and Fifty
paint brushing, interior to give and
even shade including cleaning th
surface of all dirt, dust and other
I/We am/are willing to carry out the work at……………….. % above/below percent (Should Be written in
figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount put to tender Rs.
Estimated amount put to tender Rs.
Deduct………..…%below Add………...…%Above
In words…………………………………… In words……………………….
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
1 Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate ___-___ mentioned in all the tender.
It. No Description of Item Qty Unit Rate In Words Amount
Divisional Accountant Executive Engineer
Drainage Division No-2 Drainage Division No-2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
05-01-SBD.pdf
05-02-Schedule-B.pdf
05-03-Specifications.pdf
05-04-Labour Material.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .