| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹2.6 LAccepted-AOC | ₹2.6 L | 1st lowest | Accepted-AOC You have been awarded the contract for this tender |
| 2 | 1st lowest₹2.6 LRejected-Finance | ₹2.6 L | 1st lowest | Rejected-Finance 1st lowest tenderer is not Lottery winner |
| 3 | 1st lowest₹2.6 LRejected-Finance AT SAYA PO DEULIPADA PS TIHIDI DIST BHADRAK PIN 756130 | BHADRAK | ODISHA | 756130 | ₹2.6 L | 1st lowest | Rejected-Finance 1st lowest tenderer is not Lottery winner |
| 4 | 1st lowest₹2.6 LRejected-Finance NA | ZUNHEBOTO | NAGALAND | 797104 | ₹2.6 L | 1st lowest | Rejected-Finance 1st lowest tenderer is not Lottery winner |
| 5 | 1st lowest₹2.6 LRejected-Finance | ₹2.6 L | 1st lowest | Rejected-Finance 1st lowest tenderer is not Lottery winner |
Tender Value
₹3.1 L
EMD Value
₹3,200
Closing Date
8 Dec 2025, 5:00 pmClosed
Superintending Engineer,M.I Division, Balasore
Office of the Superintending Engineer Minor Irrigation Division Balasore Near Fandi Chhaka Balasore 756001
Improvement to Dudhiagohiri Check Dam in Tihidi Block of Bhadrak District for the year 2025-26.
2025_CEMIB_121937_26
SEMIDBLS-07/2025- 26
Open Tender
Civil Works - Others
60 days
Tihidi Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹3,200
Yes
6 Apr 2026
29 Nov 2025
9 Dec 2025
29 Nov 2025
8 Dec 2025
29 Nov 2025
Clearing shrub jungle uprooting stumps and small bushes and trees below 1m girth on premeasurement required etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.
Dismantling and removing cement concrete for all height including stacking the useful materials for reuse and removing the debris within all lead and lifts including all labour & T&P materials required for the item etc. complete as directed by the Engineer-in charge.
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within all lead and lifts including all labour & T&P materials required for the item etc. complete as directed by the Engineer-in charge.
Providing Cement Concrete M-15 grade using 20mm down grade crusher broken hard granite stone aggregate of approved quality quarried free from weathered skin, quarry debris and foreign materials using clean and sharp sand of approved grading and quality confirming to the design specification including hoisting, lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with Vibrators and finishing the exposed surface smooth including watering, curing for required period providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials with all cost of tools & plant, cost and carriage of water etc with supply of all labour, taxes as per prevailing norm and supervision charges including mobilisation and de-mobilisation of men & machineries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge.
Providing Cement Concrete M-20 grade for RCC works on approved surface or shape and size using 20mm down grade crusher broken hard granite stone aggregate of approved quality quarried free from weathered skin,quarry debris and foreign materials using clean and sharp sand of approved grading and quality confirming to the design specification including hoisting, lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with Vibrators and finishing the exposed surface smooth including watering, curing for required period providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials with (excluding cost of M.S. rod carriage and labour for cutting, binding, binding and fixing of M.S. rod) all cost of tools & plant, cost and carriage of water etc with supply of all labour, taxes as per prevailing norm and supervision charges including mobilisation and de-mobilisation of men & machineries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge.
Supplying, Straightening, cutting, bending , binding and tying the grills and placing HYSD bars reinforcement in position as per approved design & drawing for fabrication and fixing of reinforcement including lapping where necessary including cost, conveyance & supply of binding wires of 18 to 20 gauge with supply of all labour , with all leads, lifts from bending yard to placement spot with cost & conveyance and all taxes of steel bars of any reinforcement supplying all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge. (weight of the binding wire will not be included in the measurement of for payment)
Providing rigid smooth centering & shuttering (with box type steel shuttering plates with keys for intermediate construction joints in rafts, wherever required) for concrete works as per site requirement including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delifts including supply of all labour, all taxes as per prevailing norm and T&P required for the items etc complete in all respect as directed by Engineer-in-charge .
6mm thick cement plaster ( 1 : 4 ) to R.C.C. surfaces finished smooth incl. close deep chiping and slury treatment with all cost, carriage, Royality, including supply of all labour, all taxes as per prevailing norm and T&P required for the items etc complete in all respect as directed by Engineer-in-charge .
Excavation in foundation, loading, unloading and carriage for approach channel etc cutting by mechanical means of all kinds of soil interspread with boulders upto 1/2 cum size with all leads, lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site including depositing the excavated earth in proper profile etc as per the specification and as directed by the Engineer- in-charge within an initial lead from the place of excavation complete as per the direction of the Engineer-in-charge. (Measurment should be taken in finished level section ).
Excavation of any approved type of soil from borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil with all leads and lifts and delifts on properly prepared surface including spreading and levelling the earth in 22.50 cum layers in dam and dyke for all heights including royality of earth etc as specification and direction of the engineer-in charge (Measurment should be taken in finished level section and 12.5 volume will be deducted towards settlement of earth in filling section ).
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_567744.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.07 MB
Tendernotice_2.pdf
PDF • 2.72 MB
BOQ_567744.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid