| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC Accepted Vide Resolution No. 8/26 dtd. 26-02-2026 and agreement executed on 09-06-2026 |
| 2 | L2₹10.3 L+₹49,241.17 (5.00%)Rejected-AOC | ₹10.3 L+₹49,241.17 (5.00%) | L2 | Rejected-AOC Second bidder. Kept in abeyance till the execution of agmnt by the First Bidder |
| Sl No | Description | Qty | Unit | Rajesh.C.A L2 | M V Sivaraman L1 |
|---|---|---|---|---|---|
| 1.00Tiled roof building-Maintenance | |||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 317.89 | sqm | 228 ₹72,479.38 | 217.14 ₹69,027.07 Lowest |
| 1.00 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 2,090.63 | kg | 203.98 ₹4,26,447.12 | 194.27 ₹4,06,147.08 Lowest |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,047.46 | kg | 196.41 ₹2,05,732.6 | 187.05 ₹1,95,928.33 Lowest |
| 1.00 | OD344378/2025-2026:(modified 12.49)Providing & laying of Departmental roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | 34.75 | metre | 53.88 ₹1,872.28 | 51.31 ₹1,782.97 Lowest |
| 1.00 | OD344380/2025-2026:(modified 12.48) Providing & fixing Departmental roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 270.21 | sqm | 223.57 ₹60,410.4 | 212.92 ₹57,532.69 Lowest |
| 1.01 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 48.07 | sqm | 456.44 ₹21,942.9 | 434.69 ₹20,897.29 Lowest |
| 1.01 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | 3.86 | metre | 102.4 ₹395.37 | 97.52 ₹376.52 Lowest |
| 1.01 | OD344379/2025-2026:Setting MP hip & ridge tiles in cement mortar 1:3 including finishing edges including all
cost of materials, labour charges conveyance etc. complete | 77.22 | metre | 129.98 ₹10,037.06 | 123.79 ₹9,559.06 Lowest |
| 1.01 | 21.5:Providing and fixing powder coated aluminium work ( minimum thickness of powder coating 50 micron) consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ). | 74.42 | kg | 888.24 ₹66,098.38 | 845.93 ₹62,949.88 Lowest |
Tender Value
₹9.8 L
EMD Value
₹24,618
Closing Date
23 Feb 2026, 3:00 pmClosed
Assistant Engineer
Assistant Engineer LIDEW Wing Vellangallur GP
Annual Plan-2025-26-Vellangallur GP- Maintenance of Karoopadanna LPS -Ward-13-Project No.316/2025-26-General Civil Work
2026_LSGD_836049_1
09/AE/LIDEW/VGLR/25-26
Open Tender
Civil Works - Buildings
Item Rate
240 days
Konathukunnu
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,170
Yes
₹24,618
Yes
4 Aug 2026
13 Feb 2026
25 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Tiled roof building-Maintenance | |||||
| 1.001 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 0.8 | sqm | - | - |
| 1.002 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 0.8 | kg | - | - |
| 1.003 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1 | kg | - | - |
| 1.004 | OD344378/2025-2026:(modified 12.49)Providing & laying of Departmental roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | - | metre | - | - |
| 1.005 | OD344380/2025-2026:(modified 12.48) Providing & fixing Departmental roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 0.2 | sqm | - | - |
| 1.006 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 1 | sqm | - | - |
| 1.007 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | - | metre | - | - |
| 1.008 | OD344379/2025-2026:Setting MP hip & ridge tiles in cement mortar 1:3 including finishing edges including all
cost of materials, labour charges conveyance etc. complete | 1 | metre | - | - |
| 1.009 | 21.5:Providing and fixing powder coated aluminium work ( minimum thickness of powder coating 50 micron) consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ). | - | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407036.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1407036.xls
BOQ • 0.31 MB
PA.pdf
Tender Documents • 0.26 MB
NITSBD.pdf
Tender Documents • 1.85 MB
FOT.pdf
Tender Documents • 0.25 MB
AFFIDAVIT.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .