Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹5.9 L+₹12,468.58 (2.15%)Rejected-AOC | ₹5.9 L+₹12,468.58 (2.15%) | L2 | Rejected-AOC NOT LOWEST |
| Sl No | Description | Qty | Unit | MARTIN VARGHESE L2 | Pradeep Kumar K. L1 |
|---|---|---|---|---|---|
| 1.00Retaining wall | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 6 | hour | 340 ₹2,040 | 337 ₹2,022 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 22.3 | cum | 350 ₹7,803.25 Lowest | 351 ₹7,825.55 |
| 1.00 | OD433500/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and
superstructure including packing to compactness to lines and levels, cost and conveyance of all
materials labour charges etc. complete as per approved drawing and relevant technical
specifications | 85.24 | cum | 5,800 ₹4,94,368.8 | 5,583 ₹4,75,872.59 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.12 | cum | 9,100 ₹37,455.6 Lowest | 9,743 ₹40,102.19 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 369.62 | kilogram | 100 ₹36,961.7 Lowest | 109 ₹40,288.25 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.29 | cum | 9,100 ₹11,702.6 | 9,031 ₹11,613.87 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 5.14 | sqm | 350 ₹1,800.75 Lowest | 377 ₹1,939.67 |
Tender Value
₹5.9 L
EMD Value
₹14,829
Closing Date
9 Mar 2026, 5:00 pmClosed
AE LID EW
AE LID EW
Annual Plan-Improvement works to Vadakantte kulam in ward 4 in Chennithala Thripperumthura GP Project no 36-Annual Plan 2025-26-General Civil Work- Re tender
2026_LSGD_842196_1
AE/LID EW/CTGP
Open Tender
Civil Works - Water Works
Item Rate
120 days
chennithala
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,310
Yes
₹14,829
Yes
30 May 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Retaining wall
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD433500/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_1420858.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 2.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .