Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 CrAccepted-AOC | ₹15.4 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | - | - | Rejected-Technical Disqualified in technical prequalification |
| Sl No | Description | Qty | Unit | SUEZ India Pvt. Ltd. L1 |
|---|---|---|---|---|
| 1.001st Year - Supply of Man power for O & M of 74 MLD Water Treatment Plant, Intake, Pumping stations and other units | ||||
| 1.00 | OD101851/2024-2025:Engaging Plant Manager for the Administrative and Technical control of the plant. | 365 | Day | 2,052 ₹7.5 L |
| 1.00 | OD101937/2024-2025:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant. | 1,095 | Day | 1,682 ₹18.4 L |
| 1.00 | OD35980/2025-2026:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. (2nd Year) | 1,095 | Day | 1,682 ₹18.4 L |
| 1.00 | OD101951/2024-2025:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses. | 365 | Day | 1,609 ₹5.9 L |
| 1.00 | OD101953/2024-2025:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals. | 3,285 | Day | 1,573 ₹51.7 L |
| 1.01 | OD101954/2024-2025:Engaging Electrician for maintenance of all Electrical equipment | 1,095 | Day | 1,150 ₹12.6 L |
| 1.01 | OD101956/2024-2025:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses. | 730 | Day | 1,479 ₹10.8 L |
| 1.01 | OD102030/2024-2025:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses. | 730 | Day | 1,150 ₹8.4 L |
| 1.01 | OD102032/2024-2025:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant. | 3,285 | Day | 1,217 ₹40.0 L |
Tender Value
₹15.1 Cr
EMD Value
₹5 L
Closing Date
10 Nov 2025, 3:00 pmClosed
Superintending Engineer
The Superintending Engineer, Public Health Circle, Kerala Water Authority, Thiruvananthapuram
Water Supply Schemes Operation and maintenance of 74 MLD Water Treatment Plant at Aruvikkara constructed under JICA Project for 3 Years General Civil Work
2025_KWA_813545_1
18/2025-26/KWA/PHC/D3/TVM/RT1
Open Tender
Civil Works - Water Works
1095 days
Aruvikkara
please refer NIT
8 documents required · 8 mandatory
₹19,518
₹5 L
Yes
O/o The Superintending Engineer,
3 Feb 2026
23 Oct 2025
11 Nov 2025
23 Oct 2025
10 Nov 2025
23 Oct 2025
23 Oct 2025 - 10 Nov 2025
23 Oct 2025
Amount
1st Year - Supply of Man power for O & M of 74 MLD Water Treatment Plant, Intake, Pumping stations and other units
OD101851/2024-2025:Engaging Plant Manager for the Administrative and Technical control of the plant.
OD101937/2024-2025:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant.
OD35980/2025-2026:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. (2nd Year)
OD101951/2024-2025:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses.
OD101953/2024-2025:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals.
OD101954/2024-2025:Engaging Electrician for maintenance of all Electrical equipment
OD101956/2024-2025:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses.
OD102030/2024-2025:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses.
OD102032/2024-2025:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant.
OD102033/2024-2025:Engaging Sweeper for sweeping and cleaning Plant and premises
OD102035/2024-2025:Engaging Security Guard for Plant and Lagoon
OD102037/2024-2025:Engaging Gardener for gardening in the plant premises
2.Periodical cleaning of Pulsator Clarifiers, Leading Channels, other unit structures, Lagoons, etc., Labour charges for replacement of spares, Cost of consumables, Hire charges/cost of tools & plants, safety equipments, manure for gardening, etc
OD102039/2024-2025:Periodical cleaning of pulsator clarifier and other connected accessories by engaging man coolies including removal of algae and cleaning the side walls, channels and bottom etc thoroughly using coir /fibre brush and desilting without making any damages to the structure including operating the valves/shutters etc complete as instructed and till achieving sludge blanket and make the pulsator functional to its designed capacity.
OD102042/2024-2025:Periodical cleaning of leading channel at the inlet point and other connected accessories, by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete
OD102044/2024-2025:Periodical cleaning of Clear water Sump, OHSR, Used Wash water Tank, OH Wash water reservoir, Sludge Balancing tank, Sludge thickener, etc by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete.
OD103516/2024-2025:Periodical cleaning of Chemical Tank by engaging man coolies including removal of slurry/waste materials accumulated in the tank thoroughly using brushes & brooms without making any damages to the structures and disposing it off the premises etc complete.
OD102046/2024-2025:Periodical cutting of bushes in the Sludge lagoon site, cleaning the site and disposal of bushes to a suitable location inside the site etc complete.
OD102054/2024-2025:Labour cost for replacement of spares during repairs & maintenance, if any, for the worn out parts of pumps and re-winding works of small motors etc at Raw water Intake and all WTP Units etc complete (Spares for replacement to be provided by KWA)<br>Mechanic
OD102065/2024-2025:Cost of consumables such as cotton waste, grease, gland ropes etc
OD102082/2024-2025:Oil for pumps, compressors, top up oil for transformer etc
OD108156/2024-2025:Cost for safety equipment such as helmets, safety shoes, jackets, safety belts, self-contained breathing apparatus, refilling of fire extinguisher, safety masks, first aid kits etc complete.
OD108157/2024-2025:Hire Charges for Tools and Plants required for the day to day operation of the Plant and Equipment
OD108158/2024-2025:Cost of manure for gardening, hire charges for gardening tools, fuel/electric operated lawn mover, including cost of fuel for the proper maintenance of garden and premises
OD108159/2024-2025:Cost of all cleaning materials for using in the plant, pumphouses and office such as Brooms, Brushes, Soap, Hand wash, floor cleaning liquids, Sanitizer, Disinfectants, Tissues etc.
1st Year - Periodical Painting of all Civil structures and Electro-Mechanical equipments including pipelines after scrapping & cleaning and applying a priming coat, wherever required.
OD105021/2024-2025:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year)
13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture
OD105992/2024-2025:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year)
OD106045/2024-2025:Wall painting on exterior walls with Acryllic exterior emulsion paint of approved brand (two coats over old surfaces) to give an even shade after scrapping and cleaning the surfaces.(Once in 3 years, ie. 33.33% of the remaining area every year)
OD106097/2024-2025:Removing of existing primer and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year)
OD106427/2024-2025:Painting on metal and wooden surfaces with Synthetic enamel paint of approved brand (one coat over old surfaces) after scraping and cleaning the surfaces. (Once in 3 years, ie. 35% of the remaining area every year)
1st year - Supply of Chemicals for 74 MLD Water Treatment Plant for production of required quality and quantity of water as per designed capacity
OD105133/2024-2025:Supply and delivery of Class IV Alum at 10 PPM dosage-Sampling and testing of the materials will be conducted as per the<br>method prescribed in IS: 299/2012 (Alum Grade IV) with latest amendment.
OD105141/2024-2025:Supply and delivery of Hydrated lime as per specification at 10 PPM dosage
OD105157/2024-2025:Supply of liquid chlorine in Tonner Cylinders at dosage 3.2 PPM with all approvals
1st Year - Rewinding of large motors, Replacement of chemical pumpsets, Battery banks &amp; UPS, Interfacing cards, etc.
OD105198/2024-2025:Rewinding Stator/Rotor of 100HP 1480 RPM Marathon-make LT 3 phase Squirrel cage induction motor at the Clear Water Pump house, including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing, etc and deducting the scrap value of the copper wire, etc, complete.
OD105502/2024-2025:Rewinding the Stator/Rotor of 235HP 1485 RPM Alstom-make HT 3300V, 3 phase induction motor at the Raw Water Pumphouse, including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing, etc and deducting the scrap value of the copper wire, etc, complete.
1st Year - Providing provision for replacing the old steel work
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
1st Year Provisional sum for emergency repair works and miscellaneous expenses for three years (30 Lakhs every year)
OD118820/2024-2025:Provisional sum for procurement of spare(if not available in KWA stock) and to meet the emergency services such as repair including rewinding of HT motors of intake ans WTP repaires to pumpset in inyake and WTP repaires ti EOT crane,vaccum pump set and electrical switch gears in the locations,repairs to raw and treated water pumping line,repairs to valve and flow meters and testing of chemicals and water quality,inspection charges payable to other agencies,conveyance charges payable to plant manager for his journey ouside the plant area (to city),cost of stationary,SCADA report generation, uniforms to employees etc (for each year Rs.30,00,000/-).
2nd Year - Supply of Man power for O & M of 74 MLD Water Treatment Plant, Intake, Pumping stations and other units
OD259916/2024-2025:Engaging Plant Manager for the Administrative and Technical control of the plant. (2nd year)
OD259922/2024-2025:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant. (2nd year)
OD259923/2024-2025:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. (2nd Year)
OD259924/2024-2025:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses. (2nd year)
OD259925/2024-2025:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals.(2nd year)
OD259926/2024-2025:Engaging Electrician for maintenance of all Electrical equipment (2nd year)
OD259929/2024-2025:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses. (2nd year)
OD259930/2024-2025:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses.(2nd year)
OD259931/2024-2025:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant. (2nd year)
OD259932/2024-2025:Engaging Sweeper for sweeping and cleaning Plant and premises (2nd year)
OD259933/2024-2025:Engaging Security Guard for Plant and Lagoon (2nd year)
OD259934/2024-2025:Engaging Gardener for gardening in the plant premises (2nd year).
2nd year - Periodical cleaning of pulsator LC etcc
OD259935/2024-2025:Periodical cleaning of pulsator clarifier and other connected accessories by engaging man coolies including removal of algae and cleaning the side walls, channels and bottom etc thoroughly using coir /fibre brush and desilting without making any damages to the structure including operating the valves/shutters etc complete as instructed and till achieving sludge blanket and make the pulsator functional to its designed capacity.
OD259936/2024-2025:Periodical cleaning of leading channel at the inlet point and other connected accessories, by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete
OD259937/2024-2025:Periodical cleaning of Clear water Sump, OHSR, Used Wash water Tank, OH Wash water reservoir, Sludge Balancing tank, Sludge thickener, etc by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete.
OD259938/2024-2025:Periodical cleaning of Chemical Tank by engaging man coolies including removal of slurry/waste materials accumulated in the tank thoroughly using brushes & brooms without making any damages to the structures and disposing it off the premises etc complete.
OD259939/2024-2025:Periodical cutting of bushes in the Sludge lagoon site, cleaning the site and disposal of bushes to a suitable location inside the site etc complete.
OD259941/2024-2025:Labour cost for replacement of spares during repairs & maintenance, if any, for the worn out parts of pumps and re-winding works of small motors etc at Raw water Intake and all WTP Units etc complete (Spares for replacement to be provided by KWA)<br>Mechanic
OD259942/2024-2025:Cost of consumables such as cotton waste, grease, gland ropes etc
OD259943/2024-2025:Oil for pumps, compressors, top up oil for transformer etc
OD259944/2024-2025:Cost for safety equipment such as helmets, safety shoes, jackets, safety belts, self-contained breathing apparatus, refilling of fire extinguisher, safety masks, first aid kits etc complete.
OD259945/2024-2025:Hire Charges for Tools and Plants required for the day to day operation of the Plant and Equipment
OD259946/2024-2025:Cost of manure for gardening, hire charges for gardening tools, fuel/electric operated lawn mover, including cost of fuel for the proper maintenance of garden and premises
OD259948/2024-2025:Cost of all cleaning materials for using in the plant, pumphouses and office such as Brooms, Brushes, Soap, Hand wash, floor cleaning liquids, Sanitizer, Disinfectants, Tissues etc.
2nd year - Periodical Painting of all Civil structures and Electro-Mechanical equipments including pipelines after scrapping & cleaning and applying a priming coat, wherever required.
OD259949/2024-2025:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year)
13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture
OD260579/2024-2025:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year)
OD260588/2024-2025:Wall painting on exterior walls with Acryllic exterior emulsion paint of approved brand (two coats over old surfaces) to give an even shade after scrapping and cleaning the surfaces.(Once in 3 years, ie. 33.33% of the remaining area every year)
OD260589/2024-2025:Removing of existing primer and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year)
OD260590/2024-2025:Painting on metal and wooden surfaces with Synthetic enamel paint of approved brand (one coat over old surfaces) after scraping and cleaning the surfaces. (Once in 3 years, ie. 35% of the remaining area every year)
2nd Year - Supply of Chemicals for 74 MLD Water Treatment Plant for production of required quality and quantity of water as per designed capacity
OD260609/2024-2025:Supply and delivery of Class IV Alum at 10 PPM dosage-Sampling and testing of the materials will be conducted as per themethod prescribed in IS: 299/2012 (Alum Grade IV) with latest amendment.
OD260610/2024-2025:Supply and delivery of Hydrated lime as per specification at 10 PPM dosage
OD260614/2024-2025:Supply of liquid chlorine in Tonner Cylinders at dosage 3.2 PPM
2nd year - Rewinding of large motors, Replacement of chemical pumpsets, Battery banks &amp; UPS, Interfacing cards, etc.
OD260618/2024-2025:Rewinding Stator/Rotor of 100HP 1480 RPM Marathon-make LT 3 phase Squirrel cage induction motor at the Clear Water Pump house, including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing, etc and deducting the scrap value of the copper wire, etc, complete.
OD260737/2024-2025:Rewinding the Stator/Rotor of 235HP 1485 RPM Alstom-make HT 3300V, 3 phase induction motor at the Raw Water Pumphouse, including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing, etc and deducting the scrap value of the copper wire, etc, complete.
2nd Year - Providing provision for replacing the old steel work
OD260744/2024-2025:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
2nd year - Provisional sum for emergency repair works and miscellaneous expenses for three years (30 Lakhs every year)
OD260750/2024-2025:Provisional sum for procurement of spare(if not available in KWA stock) and to meet the emergency services such as repair including rewinding of HT motors of intake ans WTP repaires to pumpset in inyake and WTP repaires ti EOT crane,vaccum pump set and electrical switch gears in the locations,repairs to raw and treated water pumping line,repairs to valve and flow meters and testing of chemicals and water quality,inspection charges payable to other agencies,conveyance charges payable to plant manager for his journey ouside the plant area (to city),cost of stationary,SCADA report generation, uniforms to employees etc (for each year Rs.30,00,000/-).
3rd year - Supply of Man power for O & M of 74 MLD Water Treatment Plant, Intake, Pumping stations and other units
OD36010/2025-2026:Engaging Plant Manager for the Administrative and Technical control of the plant. (3rd year)
OD263365/2024-2025:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant. (3rd year)
OD263367/2024-2025:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. (3rd Year)
OD263369/2024-2025:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses. (3rd year)
OD263370/2024-2025:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals.(3rd year)
OD264036/2024-2025:Engaging Electrician for maintenance of all Electrical equipment (3rd year)
OD264050/2024-2025:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses. (3rd year)
OD264064/2024-2025:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses.(3rd year)
OD264071/2024-2025:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant. (3rd year)
OD264232/2024-2025:Engaging Sweeper for sweeping and cleaning Plant and premises (3rd year)
OD264244/2024-2025:Engaging Security Guard for Plant and Lagoon (3rd year)
OD264251/2024-2025:Engaging Gardener for gardening in the plant premises (3rd year).
3rd year - Periodical cleaning of pulsator LC etcc
OD267692/2024-2025:Periodical cleaning of pulsator clarifier and other connected accessories by engaging man coolies including removal of algae and cleaning the side walls, channels and bottom etc thoroughly using coir /fibre brush and desilting without making any damages to the structure including operating the valves/shutters etc complete as instructed and till achieving sludge blanket and make the pulsator functional to its designed capacity - 3rd year
OD267693/2024-2025:Periodical cleaning of leading channel at the inlet point and other connected accessories, by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete
OD267694/2024-2025:Periodical cleaning of Clear water Sump, OHSR, Used Wash water Tank, OH Wash water reservoir, Sludge Balancing tank, Sludge thickener, etc by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete.
OD267695/2024-2025:Periodical cleaning of Chemical Tank by engaging man coolies including removal of slurry/waste materials accumulated in the tank thoroughly using brushes & brooms without making any damages to the structures and disposing it off the premises etc complete.
OD267696/2024-2025:Periodical cutting of bushes in the Sludge lagoon site, cleaning the site and disposal of bushes to a suitable location inside the site etc complete.
OD267697/2024-2025:Labour cost for replacement of spares during repairs & maintenance, if any, for the worn out parts of pumps and re-winding works of small motors etc at Raw water Intake and all WTP Units etc complete (Spares for replacement to be provided by KWA)<br>Mechanic
OD267700/2024-2025:Cost of consumables such as cotton waste, grease, gland ropes etc - 3rd year
OD267699/2024-2025:Oil for pumps, compressors, top up oil for transformer etc - 3rd year
OD268729/2024-2025:Cost for safety equipment such as helmets, safety shoes, jackets, safety belts, self-contained breathing apparatus, refilling of fire extinguisher, safety masks, first aid kits etc complete.
OD268733/2024-2025:Hire Charges for Tools and Plants required for the day to day operation of the Plant and Equipment 3rd year
OD268737/2024-2025:Cost of manure for gardening, hire charges for gardening tools, fuel/electric operated lawn mover, including cost of fuel for the proper maintenance of garden and premises
OD268744/2024-2025:Cost of all cleaning materials for using in the plant, pumphouses and office such as Brooms, Brushes, Soap, Hand wash, floor cleaning liquids, Sanitizer, Disinfectants, Tissues etc.
3rd year - Periodical Painting of all Civil structures and Electro-Mechanical equipments including pipelines after scrapping & cleaning and applying a priming coat, wherever required
OD268794/2024-2025:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year) - 3rd year
13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture
OD268818/2024-2025:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete exterior(Once in 3 years, ie. 33.33% of the remaining area every year) - 3rd year
OD268832/2024-2025:Wall painting on exterior walls with Acryllic exterior emulsion paint of approved brand (two coats over old surfaces) to give an even shade after scrapping and cleaning the surfaces.(Once in 3 years, ie. 33.33% of the remaining area every year) - 3rd year
OD268834/2024-2025:Removing of existing primer and the like by scrapping, sand papering the surface smooth including necessary repairs to scratches etc complete.(Once in 3 years, ie. 33.33% of the remaining area every year) - 3rd year
OD268839/2024-2025:Painting on metal and wooden surfaces with Synthetic enamel paint of approved brand (one coat over old surfaces) after scraping and cleaning the surfaces. (Once in 3 years, ie. 35% of the remaining area every year) - 3rd year
3rd year - Supply of Chemicals for 74 MLD Water Treatment Plant for production of required quality and quantity of water as per designed capacity
OD268847/2024-2025:Supply and delivery of Class IV Alum at 10 PPM dosage-Sampling and testing of the materials will be conducted as per themethod prescribed in IS: 299/2012 (Alum Grade IV) with latest amendment - 3rd year
OD268848/2024-2025:Supply and delivery of Hydrated lime as per specification at 10 PPM dosage - 3rd year
OD268851/2024-2025:Supply of liquid chlorine in Tonner Cylinders at dosage 3.2 PPM - 3rd year
3rd Year - Rewinding of large motors, Replacement of chemical pumpsets, Battery banks &amp; UPS, Interfacing cards, etc.
OD272623/2024-2025:Rewinding Stator/Rotor of 100HP 1480 RPM Marathon-make LT 3 phase Squirrel cage induction motor at the Clear Water Pump house, including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing, etc and deducting the scrap value of the copper wire, etc, complete.
OD275635/2024-2025:Rewinding the Stator/Rotor of 235HP 1485 RPM Alstom-make HT 3300V, 3 phase induction motor at the Raw Water Pumphouse, including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing, etc and deducting the scrap value of the copper wire, etc, complete.
3rd year - Providing provision for replacing the old steel work
OD272630/2024-2025:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
3rd year - Provisional sum for emergency repair works and miscellaneous expenses for three years (30 Lakhs every year)
OD272637/2024-2025:Provisional sum for procurement of spare(if not available in KWA stock) and to meet the emergency services such as repair including rewinding of HT motors of intake ans WTP repaires to pumpset in inyake and WTP repaires ti EOT crane,vaccum pump set and electrical switch gears in the locations,repairs to raw and treated water pumping line,repairs to valve and flow meters and testing of chemicals and water quality,inspection charges payable to other agencies,conveyance charges payable to plant manager for his journey ouside the plant area (to city),cost of stationary,SCADA report generation, uniforms to employees etc (for each year Rs.30,00,000/-).
Supply of Materials for 3 years
OD98288/2025-2026:Supply and installation of hach make PH sensor ,PH combination convertable sensor Ryton Body material,general purpose glass electrode ,Pt1000 ohm RTD temp comp,HSN:90278090 along with sensor SS316 sensor assembly.
OD98289/2025-2026:Supply and installation of hach make chlrorine analyser (9184sc TFC )with fully preassembled and panel mounted includes membranes and electrolyte and PH senser,UL/CSA /CE Approved by ETL.
OD98290/2025-2026:Supply and installation of Turbiditimeter of hach make ,SOLITAX t-line sc/immersion probe 0.001-4000 NTU,wiper,PVC.HSN 90279090 GST.
OD98291/2025-2026:Supply and installation of Automatic vaccum regulator for chlorination system with 10Kg/hr injector.
OD98292/2025-2026:Supplying and providing Siemens make SITRANS LT500 Uinversal Level Controller
OD98293/2025-2026:Supplying and providing Schneider make CANopen interfacing card Model: Advantys STBNC02212.
OD98294/2025-2026:Supplying and providing Schneider make Analog input card Model: Advantys STBACI0320
OD98295/2025-2026:Supplying and Installation of Limefeed pumpset of pump modal PPH/7 (H9E16M) proocess pump main with motor HP 7.5 with SS impeller and shaft ,1440 rpm with pump capacity of 15 m3/hr,with complete set of motor ,pump set ,base frame,coupling and coupling guard including dismantling of the existing pumps.
Bidder Name
SUEZ India Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.11 MB
18RT1NIT.pdf
Tender Documents • 0.58 MB
18RT1scope.pdf
Tender Documents • 0.17 MB
BOQ_1360275.xls
BOQ • 0.40 MB
checklist.pdf
Other Document • 0.13 MB
BOQcorrigendum.pdf
Other Document • 0.09 MB
Download all tender documents and submit your bid