Tender Value
₹4.8 L
EMD Value
₹9,620
Closing Date
14 Nov 2022, 2:00 pmClosed
XEN ED RAJOURI
OFFICE OF XEN ED, RAJOURI
SITC FOR CREATION OF 100 KVA SUB STATION ALONG WITH HT LT NETWORK AT DISTRICT HOSPITAL FOR FIRE FIGHTING SYSTEM ON TURNKEY BASIS
2022_PDD_193471_1
EDR/59 of 2022-23 Dated 20.10.2022
Open Tender
Electrical Works
Turn-key
60 days
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
XEN ED RAJOURI
₹9,620
18 Jul 2023
22 Oct 2022
15 Nov 2022
22 Oct 2022
14 Nov 2022
22 Oct 2022
Amount
11 KV (HT) Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV DISC WITH FITTINGS( 45 KN) (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Installation of 11 kV Disc Insulators (polymer) Complete with fitting( 45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
11/0.433 kV Distribution Transformer (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
100 KVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Al wound ), and with LV Cable Box having detachable Aluminium Gland plate
9 Mtr. Long ST Poles (410 SP-33) (As per recommended IS/REC Standard)
Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
185 mm sq Cable PVC FRLS with Al Thimbles
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV Disc Insulators (polymer) Complete with fitting (45 KN) (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Sub station earthing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm for 1 No. Neutral Earthing and through GI Strip of 25X3 mm for 2 Nos transformer body Earth, 2 Nos Pole Earth, 1 No. LA Earth and 1 No. GO handle Earth (Note: For LA Earth 1 pipe/rod shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and GI Clamps. (As per recommended IS/REC Standard)
AL PAINT + RED OXIDE.
Sundry Items/platform for s/stn (As per recommended IS/REC Standard)
Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.01
Installation of 100 KVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Al wound ), and with LV Cable Box having detachable Aluminium Gland plate (As per recommended IS/REC Standard)
Erection of 9 Mtr. Long ST Poles including (410, SP-33) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
Installation of 11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
Installation of 11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
Fixing / Crimping of 185 mm sq Cable PVC FRLS with Al Thimbles
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Installation of 11 kV Disc Insulators (polymer) Complete with fitting( 45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Installation and fixing of Sub station earthing as per REC approved arrangement/spacing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 no for neutral earthing and 25X3 mm for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and Clamps. Refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover (Proper Earthing Value must be insured) (As per recommended IS/REC Standard)
Laying of Cement Bottoming 1:2:4 mix as per REC standards 0.5 cum/pole, muffing 20 cm above ground level including plaster and curing of concrete in size of 600x600x1800 mm for st poles for refilling the pit (the leftover pit after concreting to be filled with soil and boulders). Please refer pole drawings for details.
Painting of pole by 01 coat of Red Oxide & 02 Coats of Aluminium.
Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Disposal of Earth/Malba to allowed dumping place
M/S COMBINE GROUP OF ENGINEERS
AL SAFAA GROUP OF CONSTRUCTIONS
BN ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .