| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 (Rate including GST) | |
| 2 | L2₹15.3 L+₹78,080 (5.39%)Rejected-AOC AKKAMAHADEVI ROAD VIJAYAPURA 586101 | VIJAYAPURA | VIJAYAPURA | KARNATAKA | 586101 | L2 | Rejected-AOC Not Being L1 | |
| 3 | L3₹15.4 L+₹86,630 (5.98%)Rejected-AOC | L3 | Rejected-AOC Not Being L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Found in Order | |
| 5 | Rejected-Technical 189 9 1 KADUGODI BANGALORE KARNATAKA 560067 | BENGALURU URBAN | KARNATAKA | 560067 | - | Rejected-Technical Found in Order |
Tender Value
₹16.4 L
EMD Value
₹49,300
Closing Date
18 Aug 2022, 3:00 pmClosed
Superintending Archaeologist, ASI, Dharwad Circle,
O/o Superintending Archaeologist, Archaeological Survey of India, Dharwad Circle, Behind Kannada Sahitya Bhavan, Near R N Shetty Stadium, Dharwad-580008
TOWARDS SUPPLY OF MANPOWER FOR EXECUTION OF WORKUNDER, STRUCTURAL REPAIRS TO SAFA MASJID, BELAGAVI FORT, BELAGAVI, UNDER MW(CONS)
2022_ASI_703948_1
Sout/Dhar/Belg/8 Sa/8463062
Open Tender
Manpower Supply
Supply
150 days
Safa Masjid at Belagavi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹49,300
Yes
14 Dec 2022
30 Jul 2022
19 Aug 2022
30 Jul 2022
18 Aug 2022
30 Jul 2022
Amount
Supply of manpower for carefully erecting and dismantling of 2 legged tubular scaffolding for the work using the departmental scaffolding materials available at site, without causing any damage to the monument, etc. complete as per the instruction of the engineer in charge.
Fitter (Semi Skilled)
Healper (Unskilled)
Supply of manpower for carefully removing of the dead Lime and deteriorated concrete water proof coarse at the roof of the monument with out causing and damage to the monument and the structural and architectural members, including cost of labours, conveyance from the roof to stockyard and further to vehicle, etc. complete as per the instruction of the engineer in charge.
Mason (Skilled)
Heavy Mazdoor (Unskilled )
For conveyance of materials (Unskilled)
Supply of manpower for carefully removing of the dead and deteriorated Lime mortar plaster of the parapet wall, merlons, minars, side walls etc, complete of the monument manually with out causing and damage to the monument and the structural and architectural members, including cost of labours, conveyance from the roof to stockyard and further to vehicle, etc. complete as per the instruction of the engineer in charge.
Mason (Skilled)
Heavy Mazdoor (Unskilled)
Unskilled (for conveyance of materials from roof to ground)
Supply of manpower forapplying preservative coating with oil type wood preservative of approved brand and manufacture to the wooden members including labour charges, conveyance of materials, mixing, etc. complete as per the instruction of the engineer in charge.
Painter (Skilled)
Helper (Unskilled)
Supply of manpower for racking out of the joints between the stone slabs at the roof, and preparing the surface for providing fresh pointing/ gap filling etc. complete carefully with out causing an damage to the monument, including water washing, cost of labours, conveyance roof to ground and to transportation vehicle, etc. complete as per the instruction of the engineer in charge.
Mason (Skilled)
Heavy Mazdoor (Unskilled)
(Unskilled) for conveyance from roof to ground)
Supply of manpower for filling of the gaps/ joints between the stone slabs at the roof, ceiling etc,complete using cotton cloth dipped in Lime slurry for filling the gaps further filling using 1:1:1 Lime Mortar including labour charges, conveyance of materials, mixing, laying, curing etc., complete as per the instruction of the engineer in charge, excluding cost of materials.
Mechanic (Skilled)
Heavy Mazdoor (Unskilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled)
Light Mazdoor (Unskilled)
Supply of manpower forproviding brick masonry over the roof to obtain proper gradient to facilitate free flow of water in 1:1:1 Lime Mortar, including labour charges, conveyance of materials, mixing, laying, curing etc. complete as per the instruction of the engineer in charge, excluding cost of materials.
Mechanic (Skilled)
Heavy Mazdoor (Unskilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled)
Light Mazdoor (Unskilled)
Supply of manpower forproviding and laying of Lime Concrete water proof coarse over the roof using 1:1:1 Lime mortar and 20 mm down size brick bats with proper slope to the existing outlet for free flow of the water including proper ramming, labour charges, mixing, laying, proper curing etc. complete as per the instruction of the engineer in charge, excluding cost of materials.
Mechanic (Skilled)
Heavy Mazdoor (Unskilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled)
Light Mazdoor (Unskilled)
Heavy Mazdoor (Unskilled)
Supply of manpower forproviding and laying of Lime mortar Plaster using 1:1:1 Lime mortar mixed with natural admixtures water, labour charges, mixing, laying, proper curing etc. over the Lime concrete for smooth finish and free flow of water complete as per the instruction of the engineer in charge, excluding cost of materials.
Mechanic (Skilled)
Heavy Mazdoor (Unskilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled for compcation laying, helping the mason)
Light Mazdoor (Unskilled)
Heavy Mazdoor (Unskilled)
Supply of manpower forproviding and laying of Lime mortar Plaster using 1:1:1 Lime mortar mixed with natural admixtures in 3 coats of 12 mm base coat, 8mm intermediate coat and 5mm fine coat of water, labour charges, mixing, laying, proper curing etc. complete as per the instruction of the engineer in charge, excluding cost of materials.
Mechanic (Skilled)
Heavy Mazdoor (Unskilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled, for compaction, laying, helping the mason, curing)
Light Mazdoor (Unskilled)
Supply of manpower forattending repairs to the ornamental works in 1:1:1 Lime Mortar plaster using stapti mason etc,complete including cost of materials, labour charges, conveyance of materials, mixing, laying, curing etc complete as per the instruction of the engineer in charge.
Heavy Mazdoor (Unskilled)
Stapti Mason (Highly Skilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled, laying, helping the mason, curing)
(Unskilled) For conveyance
Supply of manpower forcarefully erecting and dismantling of 2 legged tubular scaffolding for the work using the departmental scaffolding materials available at site, including loading and unloading, with out causing any damage to the monument, etc complete as per the instruction of the engineer in charge.
Fitter (Semi Skilled)
Heavy Mazdoor (Unskilled, for helping fitter for erection and dismantling)
Supply of manpower forracking out of the joints between the stone slabs at the ceiling, floor, side walls etc. and preparing the surface for providing fresh pointing/ gap filling etc. complete carefully without causing an damage to the monument, including water washing, cost of labours, conveyance of the debris, etc complete as per the instruction of the engineer in charge.
Mason (Skilled)
Heavy Mazdoor (Unskilled)
Supply of manpower pointing to walls etc,complete using 1:1:1 Lime Mortar, labour charges, conveyance of materials, mixing, laying, curing etc complete as per the instruction of the engineer in charge, excluding cost of materials.
Mechanic (Skilled)
Heavy Mazdoor (Unskilled)
Mason (Skilled)
Heavy Mazdoor (Unskilled)
Light Mazdoor (Unskilled)
Supply of manpower up-gradation of the electrical system of the monument including removing of the fused and damages electrical board, lights wiring and providing and fixing new LED lights, shifting the panel board to outside the monument etc. complete including cost of labour and materials. etc complete as per the instruction of the engineer in charge.
Electrician (Skilled)
Helper (Unskilled)
DHARMENDRA P JADHAV
S V NIMBALAGUNDI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .