General Manager
The Gurdaspur Co-op. Sugar Mills Ltd., Gurdaspur
Fabrication And Erection Jobs of Budhewal CSM
2022_Coop_85835_1
Fabrication And Erection Jobs of Budhewal CSM
Open Tender
Job Works
Item Rate
90 days
The Budhewal Co-op. Sugar Mills Ltd., Budhewal
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,000
25 May 2022
19 May 2022
25 May 2022
19 May 2022
25 May 2022
19 May 2022
Amount
Budhewal CSM
Pipe LineM.S 1” to 12” dia a)Dismantling
b)Erection
Replacement of Pipe LineM.Sabove 12” dia (other than vapour pipe of pan and quad )
Pipe LineC.I. 1” to 12” dia a)Dismantling
b)Erection
IBR Steam pipe line . 3” to 8” dia a)Dismantling
b)Erection
A)Bend M.S upto 12” dia a)Dismantling
b)Erection
B)Bend M.S. above 12” dia (other than Vapour pipe line of Pans & Quad) a)Dismantling
b)Erection
Bend of M .S.upto 12” dia (other than Vapour pipe line of Pans & Quad) a)Dismantling
b)Erection
Nipple of M .S.upto 12” dia (other than Vapour pipe line of Pans & Quad) a)Dismantling
b)Erection
Reducer of M .S.upto 12” dia (other than Vapour pipe line of Pans & Quad) a)Dismantling
b)Erection
Bend, Nipple, Reducer of M .S. above 12” dia (other than Vapour pipe line of Pans & Quad)
Man Holes of all sizes a)Dismantling
b)Fabrication
c)Erection
Flanges of all size a) Dismantling
b) Fabrication
c) Erection
M.S Tee a) Dismantling
b) Erection
M.S Nipple a) Dismantling
b) Erection
M.S Cross a) Dismantling
b) Erection
M.S Reducers a) Dismantling
b) Erection
M.S Blind a) Dismantling
b) Erection
Dismantling, Fabrication and Erection M.S Coil of 2” to 4” dia
Replacement Platform of any type
M.S. Structure work (Factory building) Replacement
M.S.Tank having round &rectangular bottoms Replacement
Trusses, Perlins, Columns & Beams (Factory Building) Replacement
Platform Pipe Line Railing of all sizes a)Dismantling
b) Erection
Electric Panel, DB and other machinery shed GI/ACC/MS Sheet a)Dismantling
b) Fabrication
c) Erection
Dismantling, Fabrication and Erection of Pump and Motor Bed of all size
Valves Sluice /Angle / N.R. /Butterfly Dismantling
b) Erection
Cone from M.S plate a)Dismantling
b) Fabrication
c) Erection
Gutter from M.S plate 5mm a)Dismantling
b) Fabrication
c) Erection
Crystallizer Slide gate valve a)Dismantling
b) Fabrication
c) Erection
Fabrication and Erection of M. S terminal box of any type
Patch work of boiling house/Mill house
Replacement of Sulphur Furnace scrubber from M. S. Plate from 10mm( including all connections with pipe lines )
Replacement of Sulphur Furnace melter /receiver from M. S. Plate from 10mm ( including all connections with pipe lines )
Sulphur Furnace chamber from M. S. Plate from 10mm ( including all connections with pipe lines ) Dismantling , Fabrication&Erection
Dismantling ,fabrication & erection of Sulphur furnace nipples, bends
Juice heater outer shell from M.S. plate 10mm including hydraulic testing at 50 psi for each juice heater a) Dismantling
b) Fabrication
c) Erection
Fabrication & Erection of mud mixture scroll & side plates with proper Alignment & commissioning
Juice clarifier inside compartment coil from M.S. Pipe 5” with all connections complete job (as where it is) Dismantling,
b) Fabrication
c) Erection
Dismantling, Fabrication & erection of Juice Heater angle valves ,distance piece from M.S. Plate 10mm of diameter 12”
Dismantling, Fabrication & Erection of Juice Heater (top & bottom ) compartment Partition plate with rubber fitting channels from M.S/EN-8 square bar & rubber seal fitting to make it leak proof (to avoid short circuiting) i)Top compartment
ii) Bottom compartment
Dismantling Fabrication & Erection of MS channel of rubber strips of juice heater compartments with M.S/EN-8 square to avoid short circuiting
QUAD body shell from M. S. Plate 12mm Dismantling
b) Fabrication
c) Erection
Top cone from M. S. Plate 12mm Dismantling
b) Fabrication
c) Erection
Umbrelllafrom M.S. Plate 10mm Dismantling
b) Fabrication
c) Erection
Down take from M.S. Plate 12mm Dismantling
b) Fabrication
c) Erection
Save –All from M.S. Plate 10mm Dismantling
b) Fabrication
c) Erection
PAN ( Capacity 40 Ton) body shell from M. S. Plate 12mm Dismantling
b) Fabrication
c) Erection
Top cone from M. S. Plate 12mm Dismantling
b) Fabrication
c) Erection
Umbrelllafrom M.S. Plate 10mm Dismantling
b) Fabrication
c) Erection
Down take from M.S. Plate 12mm Dismantling
b) Fabrication
c) Erection
Save –All from M.S. Plate 10mm Dismantling
b) Fabrication
c) Erection
Vapour /Exaust Pipe line of quad and pan from M.S plate 8mm a)Dismantling
b) Fabrication
c) Erection
Dismantling ,fabrication & erection of distance piece of vapor pipe of Pan /quad & injection header length upto 1.5 mtr a) Dia-1000mm
b) Dia- 900mm
c) Dia-720 mm
d) Dia – 620 mm
e) Dia-400mm
Dismantling, fabrication & erection of steam jacket of evaporator / semi-kestner including nipple, flange if any
Syrup /molasses tank from M.S plate 8mm along with strengthening with M.S angle a)Dismantling ,Fabrication &Erection
Replacement /patch work of worn out body shell of final molasses storage tank with M.S. Plate
Replacement /patch work of worn out roof of final molasses storage tank with M.S. Plate
A. Dismantling, fabrication & erection of Suction pipes of injection/spray pumps including reducer
B. Dismantling, fabrication & erection of Strainers of injection/spray pumps .
Dismantling, Fabrication & Erection of cooling coils of Crystallizers including connection pipe if any
Dismantling ,fabrication and erection water weighing & receiving tanks
a)Dismantling, Fabrication, Erection of magma mixture body including driving units complete
b)Patch work of any magma mixture /pug mill
Replacement of worn out round portion of crystallizer body
Repair and fitting of bush to Crystallizer ‘s Central shaft
Replacement of worn out condensate juice receiving bottles with all connection
Dismantling, Fabrication & Erection of complete scrapper hinge of juice clarifier
a)Dismantling, Fabrication & Erection of Dorr’ s scrapper
b)Dismantling Fabrication & Erection of flash tank of Dorr with all nipple etc.
Replacement of C.I tail pipe of pan & quad with MS pipe line
Replacement of condenser jet box
Dismantling, Fabrication & Erection of the bottom portion of pug mill(centrifugal machine )
Replacement of the outer shell of the Dorr clarifier
Replacement/repair of worn-out portion of sugar grader side plates & chutes
Replacement/repair of worn-out portion of hopper
Replacement of Air tray of hopper
Dismantling, fabrication & erection of worn-out shaft of Crystallizer including complete gear arrangement with complete commissioning
Dismantling ,fabrication & erection of ribbon type arms of crystallizer
Complete replacement of ribbon type arms of crystallizer
Dismantling , fabrication & erection of vacuum filter condenser
Dismantling , fabrication & erection Distribution plate of Central shaft of juice clarifier
Dismantling , fabrication & erection mud boot of juice clarifier
Dismantling & erection of spray pump with all connection including distance piece
Vacuum filter trough& agitator repair /patch work
Dismantling, fabrication & erection of Vacuum filter trough
Strengthening of umbrella of Pan /quad body
Strengthening of save all of Pan /quad body
Dismantling, fabrication & erection of Juice sulphitor chimney
Dismantling, fabrication & erection of complete A-magma mixture including fitting of central shaft with arms & gear arrangement with commissioning
Dismantling & erection of pug mill gear arrangement & replacement of bush ,works includes fitting of radicons & commissioning
Modification of exhaust blower including strengthening of bed & commissioning
Modification of dry seed elevator bottom chute to avoid breakdown/jamming
Dismantling, loading & transportation of discharge valve of pan from CSM Patiala & unloading at CSM Budhewal
Dismantling &Erection of Discharge valve of Pan No-4 with modification if any including trials & commissioning at CSM Budhewal
Re-tubing of evaporator body (approx.1600tube)including hydraulic testing at 50 PSI
Dismantling &erection of tube plates of 3rd body of evaporator
Dismantling & erection of Transient heater with all connection of pipe lines, valves with modification if any including trials & commissioning
Dismantling, loading & transportation of Transient heater from CSM Patiala & unloading at CSM Budhewal
Dismantling ,fabrication & erection of venturi of condenser
Dismantling, fabrication & erection of bottom sourcer of Pan No-4
Dismantling,fabrication& erection of Chute of 5’ width grader for leak proof working
Repair/replacement of bagacillo perforated plate of bagacillo blower for R.V.F
Modification job of bottom saucer of evaporator
Dismantling ,fabrication & erection of Ammonia coil of Pan /quad
Sulphur furnace heating element repair / replacement of jackets including nipples
Dismantling & Erection of partition box of juice heater
Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC, cross carrier & Cane Carrier Chains
Replacement of Rail line of cane unloader with 50mm square bar
Replacement of worn out ducting of boiler & APCD including angle, channel, Flats & Flanges
Replacement of side plates of cane carrier chain/RBC trough/cross elevator / Bagasse Elevator
Leveling of cross elevator chain trough
Mill house Screw conveyor Assembly (complete with bearings ) Dismantling ,
b) Fabrication
c) Erection
Replacement of worn out portion of APCD includes casing/scrubber and flue gas entry connected to chimney portion etc.
Cane Cutter Hood and chopper top plate from 12 mm thick M.S plate a)Dismantling
b) Fabrication
c) Erection
Dismantling, Fabrication & Erection of worn out portion of Chute cane carrier to 1st mill
Replacement runner (flat size 50x8mm) of cane carrier /cross elevator /RBC/baggase elevator
Dismantling, Fabrication, Erection of Juice Tray of mill No. 1 & 2 from M.S plate 8mm
Dismantling, Fabrication, Erection of Juice Tray of mill No. 1 & 2 from S.S plate 8mm
Repair of rotary bagasse feeders of Boilers A) Body
B) Rotor
Replacement of casing of Boiler (both plate & supporting angle)
I.D. fan worn out casing of both boilers Dismantling
b) Fabrication
c) Erection
Replacement of the expansion joints of boilers
Replacement of worn out ducting the boilers
Erection and fabrication of any -thing from scrap
Replacement of inter carrier side plates
Replacement of scraper bar side plates size :- 1 meter square
Replacement of the casing of air heater
Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC, cross carrier & Cane Carrier Chains
Replacement of Rail line of cane unloader with 50mm square bar
Replacement of worn out ducting of boiler & APCD including angle, channel, Flats & Flanges
Replacement of side plates of cane carrier chain/RBC trough/cross elevator / Bagasse Elevator
Leveling of cross elevator chain trough
Mill house Screw conveyor Assembly (complete with bearings ) Dismantling ,
b) Fabrication
c) Erection
Replacement of worn out portion of APCD includes casing/scrubber and flue gas entry connected to chimney portion etc.
Cane Cutter Hood and chopper top plate from 12 mm thick M.S plate a)Dismantling
b) Fabrication
c) Erection
Dismantling, Fabrication & Erection of worn out portion of Chute cane carrier to 1st mill
Replacement runner (flat size 50x8mm) of cane carrier /cross elevator /RBC/baggase elevator
Erection and fabrication from scrap
Replacement of inter carrier side plates
Replacement of inter cane carrier plates
Replacement of scraper bar side plates size :- 1 meter square
Replacement of Air heater tubes(Approx.555tubes)including hydraulic testing
MOHAMAD MUSTKEEM
TAB ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_184001.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .