Executive Engineer, Salinity Control Division, Porbandar
STRENGTHENING EARTHENBUND AND EXTENSION OF WASTE WEIR ON KHARA POND AT VILLAGE BHOD OF RANAVAV TAKULA AND PORBANDAR DISTRICT.
292938
01 of 2026-27
Open
Civil Works - Others
Porbandar
10 documents required · 8 mandatory · 2 optional
₹1,500
Executive Engineer, Salinity Control Division, Porbandar
₹49,000
2 Apr 2026
2 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at such
rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to there levant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledge hammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by
ripping with a tractor of at least 150kw with a single rear mounted heavy duty
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item (with brief Rate
specification and reference to book of Qty Unit (Without
No. (Without GST)
specifications) GST)
1 Jungle clearance of specified category and 28.00 Sq.Mt. 5.90
bushes for canal/dam work as directed
with depositing material etc complete.
(Excluding tree of grith above 0.5 mt) c)
For Heavy dence
2 Excavation in all sort of strata and 5030.00 Cum 176.00
formations incl. depositing the unuseful
excavated stuff as and where directed incl
sorting and stacking useful materials as
directed upto 200 mt lead and all lift etc.
complete incl. dewatering.(B)SOFT ROCK
3 Providing and laying 15cm thick STONE 156.00 Sq.Mt. 166.00
SOLING below apron using stone
weighing not less than 20 Kg or as
specified as per design esign and and
drawing incl hand packing etc complete
with all lead and lift
4 Prov. & Laying in position cement concrete 341.00 Cum 3423.00
using cement , sand and crushed metal
coarse aggregate by mass and machine
mix for PCC/RCC including necessary
formworks compaction by vibrator,curing
as directed with all lead & lift etc complete.
(Excluding cost of steel ) FOR .BODY
WALL, APRON, TRAINING WALL, SIDE
WALL, SPLAY WALL, KEY WALL, CUT
OF WALL ETC.4(c)Controlled Concrete
grade M-15 and MSA-40mm
5 Providing,cutting,bending,binding and 2.30 MT 76574.00
fixing in position as per drawing .TMT BAR
, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
to 18 BWG M.S.. Wire etc.complete with all
lead and lift.(B)Fe-500
6 Providing and fixing in position 100/110 106.00 Rmt 142.00
mm dia A.C. Pipe weep holes in the
retaining walls./side wall/abt etc
7 Providing and laying graded filters of 35.00 Cum 530.00
sand,gravel/metal and over size metal (
100 to 150 mm) behind the retaining wall &
wing walls as directed as per approved
drawing with all lead and lifts etc complete.
8 Providing and laying dry rubble stone 61.00 Sq.Mt. 253.00
pitching without base inverted
filter/murrum bedding and header stone
including hand packing & trimming &
dressing slopes etc complete (B) 23 cms
thick stone pitching
9 Strengthening of existing earthen bund by 24088.00 Cum 105.00
obtaining earth from deepening Minor
irrigation Scheme using
watering/Pneumatic Temping work etc.
Complete as suggested by Engineering
Total Amount :-
Total Amount :-
In words (Rupees Fourty Eight Lac Thirty Two thousand Nine Hundred Seventy Nine
and Fourty Paisa Only)
percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
specification and reference to Quantity Unit Amount
book of specifications)
(A) Total Tendered Amount
(C)Net Tendered Amount (A-
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference
of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Bhod cd Final.pdf
01 of 2026-27.pdf
BOQ Bhod CD.pdf
Download all tender documents and submit your bid