| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 LAccepted-Finance | ₹47.3 L | L1 | Accepted-Finance Bid ok. |
| 2 | L2₹47.4 LAccepted-Finance | ₹47.4 L | L2 | Accepted-Finance Bid ok. |
| 3 | L3₹47.4 LAccepted-Finance | ₹47.4 L | L3 | Accepted-Finance Bid ok. |
| 4 | L4₹47.6 LAccepted-Finance | ₹47.6 L | L4 | Accepted-Finance Bid ok. |
| 5 | L5₹47.7 LAccepted-Finance | ₹47.7 L | L5 | Accepted-Finance Bid ok. |
| Sl No | Description | Qty | Unit | BAL SINGH AND SONS L5 | M/s Shivani Constructions L3 | Swastik Builders L4 | R.D Builders L2 | JAY TEE KAY INFRA L1 | Hi Tech Builder L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Milling of distress bituminous layer 50 to 60 mm depth as per requirement in single pass with suitable milling machine (capable of milling @200-300 sqm area per Hr.) fitted with loading convey or for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to reuse with the approval of Engineer-in-charge (80% of theoretical material will be assume to be retrieved) for safe disposal with all leads and lifts complete in all respects. NOTE:- The quantity of reclaimed bitumionus mix material shall be a recovery item as mentione in BoQ2. | 4,300 | Per Sm | 63.2 ₹2.7 L | 53 ₹2.3 L | 62 ₹2.7 L | 57.3 ₹2.5 L | 42.5 ₹1.8 L | 46.55 ₹2.0 L |
| 2.00 | Preparing of existing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and scoring the surface with diagonal lines V shaped 25mm deep and 2 meters apart and removal of rubbish to a distance not exc 50m and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. | 4,300 | Per Sm | 13.2 ₹56,760 | 14.2 ₹61,060 | 16.5 ₹70,950 | 12.11 ₹52,073 | 10.18 ₹43,774 | 11.4 ₹49,020 |
| 3.00 | Material and labour for premixed bituminous macadam averaging 75mm thick or less (consolidated thickness), using 4% binder paving bitumen(mixed) in central computerized hot mix plant),laid, rolled and compacted using 8 to 12 tonnes power roller to required gradient and camber using mechanical self propelled paver and rolled with mechanical vibratory power roller 8 to 12 tonnes capacity, complete all as specified in MES SSR 2020. | 220 | Per Cum | 8,290 ₹18.2 L | 8,480 ₹18.7 L | 8,300 ₹18.3 L | 8,300.4 ₹18.3 L | 8,420 ₹18.5 L | 8,520 ₹18.7 L |
| 4.01 | Material & Labour evenly a tack coat@ 5kg/ 10 sm with paving bitumen with mechanical sprayer. | 4,300 | Per Sm | 36.1 ₹1.6 L | 34.1 ₹1.5 L | 40 ₹1.7 L | 35.5 ₹1.5 L | 38.1 ₹1.6 L | 28.21 ₹1.2 L |
| 4.02 | Material and labour for applying evenly priming/tack coat with paving bitumen at the rate of 3 kgs/10 Sqm on bituminous macadam surfaces complete all as specified. | 4,300 | Per Sm | 22.28 ₹95,804 | 20.99 ₹90,257 | 25.22 ₹1.1 L | 21.85 ₹93,955 | 25.21 ₹1.1 L | 20.9 ₹89,870 |
| 5.00 | Material and labour for bituminous premix asphaltic semi dense concrete 25mm thick (mixed in central computerized hot mix plant) consolidated thickness with 6% binder content by weight of total mix compacted to required camber and gradient using mechanical self propelled paver and rolled with mechanical vibratory power roller 8 to 12 tonnes capacity, complete all as specified and as directed. | 4,300 | Per Sm | 358 ₹15.4 L | 363 ₹15.6 L | 368 ₹15.8 L | 363 ₹15.6 L | 368.42 ₹15.8 L | 372 ₹16.0 L |
| 6.00 | Earth work in excavation in trenches including Removing of material to a distance 01 KM upto 05 KM. | 100 | Per Cum | 193 ₹19,300 | 175 ₹17,500 | 193 ₹19,300 | 183.2 ₹18,320 | 160 ₹16,000 | 172 ₹17,200 |
| 7.00 | M/L PCC bed stone aggregate 1:5:10 in fillings & mass concrete all as specified in MES SSR 2020. | 80 | Per Cum | 3,523 ₹2.8 L | 3,370 ₹2.7 L | 3,405 ₹2.7 L | 3,410 ₹2.7 L | 3,505 ₹2.8 L | 3,399 ₹2.7 L |
| 8.00 | M/L Cement concrete interlocking block/tiles (M-40) Vibrator Moulded, 80 mm thick of shape as per sample laid over sand 25 to 40 mm all as sp. in MES SSR 2020.(ISI Mark) | 900 | Per Sm | 775 ₹7.0 L | 760 ₹6.8 L | 790 ₹7.1 L | 762 ₹6.9 L | 769.31 ₹6.9 L | 766.4 ₹6.9 L |
| 9.00 | M/L PCC coping in cement concrete 1:2:4 on walls, roof kerbs or mud stops all as specified in MES SSR, 2020. | 10 | Per Cum | 5,620 ₹56,200 | 6,635 ₹66,350 | 6,200 ₹62,000 | 6,720 ₹67,200 | 6,418 ₹64,180 | 6,521.5 ₹65,215 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
19 Feb 2026, 5:00 pmClosed
Chief Executive officer.
229, Race Course Road, Cantonment Board office, Ambala Cantt.
As per tender documents.
2026_DGDE_751087_1
ACB/AE/TDR/2025/28
Open Tender
Civil Works - Roads
270 days
Ambala Cantt
As per tender documents.
3 documents required · 3 mandatory
₹1,500
Chief Executive officer
₹1 L
23 Feb 2026
3 Feb 2026
20 Feb 2026
3 Feb 2026
19 Feb 2026
5 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid