Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance NO 165 VENBAKKAM VILLAGE PANRUTI POST ORAGADAM KANCHIPURAM DISTRICT ORAGADAM KANCHIPURAM TAMIL NADU 631604 | KANCHIPURAM | TAMIL NADU | 631604 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
8 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CMNM IC
HALDIA REFINERY, INDIAN OIL CORPORATION LIMITED
OVERHAULING AND TROUBLESHOOTING OF 22-K-301A COMPRESSOR (MAKE MAYEKAWA) INSTALLED AT CRU UNIT OF HALDIA REFINERY.
2024_HR_177432_1
HMLNA24029
Single
Mechanical Services
Service
720 days
HALDIA REFINERY, INDIAN OIL CORPORATION LIMITED
Please refer Tender documents.
3 documents required · 3 mandatory
Exempted
10 Jun 2024
15 May 2024
10 Jun 2024
15 May 2024
8 Jun 2024
15 May 2024
Amount
"For line item 10: Overhauling of compressor 22-K-301 Overhauling of Mayekawa make screw compressor 22-K-301 in FOB unit of Haldia refinery. Contractor's Scope of work:- 1. Complete overhauling of compressor 22-K-301, by deputation of 2 no service engineer, on the work bench/table. a.) Taking initial alignment reading before decoupling. b.) Supervision during decoupling. c.) Removing compressor from skid to work bench will be in IOCL scope. However, no man-days shall be applicable for this period. 2. All the checks to be performed as per manual. 3. Inspection of removed components /checking of all clearances and measurements / replacement of components as per requirement. 4. Any other activities required for completion of overhauling. 5. Submission of detailed activity and overhauling report within 10 days of compressor commissioning. 6. Accommodation, food, boarding, lodging every type of transport (outstation and local) will be in scope of the vendor. IOC Scope of work:- 1. To provide spares for compressor. 2. Removing and putting back compressor from skid to test/work bench. 3. Adequate working conditions such as work bench, lighting, crane, spare parts, electricity, cleaning agents etc. at site. Note: Supervision Charges for commissioning after overhauling shall be paid extra in man-days." . "refer SOR item no. 00010 of RFQ line item no. 00010" excluding GST.
"For line item 20: Normal days This item will be operable when: a.Vendor is solely called for troubleshooting of compressor. b.Supervisory charges after overhauling of compressor on work bench: duration will be from completion of overhauling on work bench till the trial run of compressor. For this item: 1 DAY = 8 Hr. duty time (09.00 A.M. - 18.00 P.M.) on normal working days (Monday-Saturday) with 1 hr. lunch break for service engineers. Contractor Scope of work:- 1. Supervision of activities after compressor placement on the skid i.e. alignment, pipeline installation and other installation related activities. 2. Supervision of Oil charging and stabilization of the auxiliary system. 4. Trial run of the compressor. 5. Any other activities related to commissioning of compressor after overhauling. 6. Troubleshooting of compressor when vendor is called for troubleshooting of compressor. 7. Accomodation , food , boarding , lodging, every type of transport (outstation and local) will be in scope of the vendor. Note: Vendor can be called solely for troubleshooting of compressor as and when required. IOC Scope of work:- 1. To provide spares for compressor. 2. Compressor alignment, installation and cleaning of every other auxiliaries including filter and suction strainer. 3. Replacement of oil. 3. Adequate working conditions such as work bench, lighting, crane, spare parts, electricity etc. at site." . "refer SOR item no. 00020 of RFQ line item no. 00010" excluding GST.
"Overtime Charges Supervisory charges after installation of compressor on skid till trial run of compressor or for troubleshooting of compressor. Here 1 Hr. = 1 Hr. duty time beyond normal working hours or working on Sunday or Holiday (as declared by IOCL, Haldia Refinery)." . "refer SOR item no. 00030 of RFQ line item no. 00010" excluding GST.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .