Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -20.77% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 L+₹3,361.10 (1.48%)Admitted-Fee/PreQual/Technical/Finance | -19.60% | ₹2.3 L+₹3,361.10 (1.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.3 L+₹6,233.83 (2.74%)Admitted-Fee/PreQual/Technical/Finance 5 DOGERPORA KALAROOS DOGERPORA KALAROOS KUPWARA JAMMU KASHMIR 193222 UDYAM JK 12 0003154 | KUPWARA | JAMMU AND KASHMIR | 193222 | -18.60% | ₹2.3 L+₹6,233.83 (2.74%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-A/c linked with GSt no. certificate not uploaded. Accordingly the bid is assessed as NR. |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST 3B uploaded for the year of 2025-26 instead of 2026-27. Accordingly the bid has been assessed as nr. |
Tender Value
₹2.9 L
EMD Value
₹5,740
Closing Date
9 Sept 2026, 4:00 pmClosed
Executive Engineer R and B Division Tangmarg
Executive Engineer R and B Division Tangmarg
Providing and fixing of railing to Two No. culverts at Gulmarg
2026_PWDJK_323110_6
NIT No. 66/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
Percentage
20 days
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer R and B Division Tangmarg
₹5,740
10 Sept 2026
2 Sept 2026
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per directionnof Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 0.91 | CUM | 1,725.2 | ₹1,569.93 |
| 2 | Excavation in water bound macadam road including stacking ofserviceable and unserviceable material separately and disposal of unserviceable material lead upto 50 m and lift upto 1.5 m, disposed material to be neatly dressed | 0.57 | CUM | 710.3 | ₹404.87 |
| 3 | Extra for cutting reinforcement bars manually/by mechanical means in
R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge. | 2.42 | SQM | 905.75 | ₹2,191.92 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level in 1:4:8 mix (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size (crushed).including all carriages involved complete .as per drawings and technical specifications. | 0.33 | CUM | 5,202.9 | ₹1,716.96 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level in 1:2:4 mix (1 cement: 2 coarse sand: 4 graded stone aggregate 40mm nominal size (crushed).including all carriages involved complete .as per drawings and technical specifications. | 7.03 | CUM | 6,591.25 | ₹46,336.49 |
| 6 | Centering and shuttering incl. strutting, propping etc. and removal of form work for | - | - | - | - |
| 7 | For Foundations: footings, bases of columns etc. for mass concrete. | 26.49 | SQM | 286.35 | ₹7,585.41 |
| 8 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete,Including paint | 564.48 | Kg | 138.2 | ₹78,011.14 |
| 9 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 50 mm dia. nominal bore ,Medium Duty | 173.78 | RM | 805.7 | ₹1,40,014.55 |
| 10 | Providing and fixing high Intensity PVC Retro reflective tapes of 5 mm thickness on poles (two or more shades of yellow, black, white and red) all complete | 6.71 | SQM | 800 | ₹5,368 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1086533.xls
BOQ • 0.32 MB
corrigendum_NIT_66_Serial_No_6_8.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .